Product Delivery Signals
Planning confidence and load composition from the stored weekly metric series. Infra remains separate, and gaps stay visible rather than becoming zero.
Exact weeks
Planning confidence and capacity at a glance
Each row uses the same week axis. Missing or skipped weeks break the line; scopes are never summed together.
W41 completion allowance
Approved completion evidence before Monday 19 October, 06:00 Europe/Bucharest, can count as Done for W41. This adds two Done outcomes. The original Friday cutoff states and actual transition dates remain in the audit; the weekly activity window is unchanged.
Cross-team transfers
W41: ADS-9149 — Feature flags - Evolutie elev was planned by Team 2 and entered Mobile. It counts as added team load, but is already in the Org planning baseline. Team Added counts therefore do not sum to Org Added. Original rates and historical ownership are preserved.
Beta coverage through W45. The main reports and dashboard have their own current coverage. Missing source weeks remain gaps.
Composition detail
Switch units without mixing their scales. Strict load reconciles only when both Active WIP and Done are source-backed.
Capacity stays in days as a separate planning input. Delivery outputs come from a different completed-work population. Neither is added to Items, Effort, or Code touch.