Sprint Pulse

Engineering Pulse — Org Adservio ADS Q1-26 W-14

Aggregated sprint ADS Q1-26 W-14 • deduplicated roll-up across included teams

This org roll-up aggregates deduplicated frozen issue facts across 1 team snapshots. Count metrics link to snapshot-exact JQL result pages. Jira IDs in the report link to live Jira issues.

Download DOCX

Executive summary

Yellow. The sprint closed 7/12 visible items. The org roll-up absorbed noise reasonably well — 0/1 added items were closed — but predictability on committed work was only 63.6% (7/11), and bugs made up 57.1% of completed items. The main drag was execution system quality, not readiness: 0/4 carryovers had been marked Ready at planning time.

Top-line metrics

MetricValueHow to read it
Committed completion63.6% (7/11)Planned items marked Done ÷ all planned committed items
Committed carryover36.4% (4/11)Planned committed carryovers ÷ all planned committed items
Finish predictability63.6% (7/11)Finish-intent planned items done ÷ all finish-intent planned items
Progress predictability0.0% (0/0)Progress items that behaved as intended by carrying
Added-during-sprint load8.3% (1/12)Added items ÷ all visible items
Added work closure0/1All added items marked Done
Reactive load (bug share)57.1% (4/7)Completed bugs ÷ all completed work
Planning quality0.0% (0/11)Committed items marked Ready ÷ all committed items
Workflow-truth mismatches0Items marked Done in review while workflow status remained non-final

Engineering readout

Across included teams, the sprint did not fail; it traded predictability for responsiveness. 0/1 added items were closed, but that responsiveness came with 57.1% bug share and diluted committed completion.

The miss pattern is concentrated: 2 partial-completion carryovers, 1 dependency-driven misses, and 0 committed items that never really started.

Most misses were not caused by poor readiness. 0 of the 4 carryovers had been marked Ready, so the stronger hypothesis is breakdown, sequencing, and capacity protection rather than simple scoping immaturity.

Delivered work mix

TypePlannedAddedStretchUnclearTotal doneDone %
Story000000.0%
Task3000342.9%
Bug4000457.1%

Committed work: plan vs execution

SignalValueWhy it matters
Committed items11Explicit promise set
Committed done7Closed as promised
Committed carry over4Unfinished promise
Committed items marked Ready0Planning-quality input
Carryovers marked Ready0Ready did not guarantee finish
Carryovers not started0Execution focus gap
Carryovers started but unfinished0Work moved, but did not close

Carryover pattern

Jira itemOwnerStatusWhy it carried
ADS-6662 — Story — [Catalog][Situatie scolara] -US5 Download docAchim StefanCarry OverPartial completion
ADS-6835 — Story — [Admitere v2] [US1.3] -Editare medie admitere singleGeorge MurgociMissing from outcome snapshotMissing from outcome snapshot
ADS-6910 — Bug — [BE-PHP][Cazari] - Soldul de pe fisa studentului nu corespunde cu cel de pe studentIonut CiolanCarry OverPartial completion
ADS-7179 — Bug — [BE][Asachi] - Verificare note introduse in sesiunea 1andrei.alexandruCarry OverDependency delay

Miss pattern summary

PatternCountWhat it suggests
Partial completion2Breakdown / sizing / stage-gating was not tight enough
Dependency delay1Capacity protection or dependency timing created slip
Not started0A committed item remained outside execution focus
In Progress / Code Review carryovers0Most misses were moving, but not closing

Workflow-truth mismatches

Items marked Done in the sprint-review field while Jira workflow status was still non-final.

Jira itemStatusIntent
None

Executive follow-up questions

QuestionWhy this mattersWhat evidence to ask for
Why did committed items carry over despite planning readiness?This tests execution quality rather than just scope quality.Show carryovers split by progress continuation, dependency, and not-started.
Are Progress items being managed intentionally?Progress items are allowed to continue, but the continuation should be visible and controlled.Show the original slice and the specific landing expectation for each item.
Is added work a healthy responsiveness level or chronic interruption?High responsiveness can hide systemic instability and diluted predictability.Show which added items were urgent/reactive versus discretionary scope change.
Can we trust Done in review when workflow is still non-final?Workflow-truth gaps reduce trust and make completion easy to game.Show the exact mismatches and the completion rule to enforce next sprint.

Included teams in this org pulse: University.

Usage note: start with the top-line metrics, then use the traceability links to answer these questions with issue-level evidence.

Full snapshot list links

SnapshotIssue countLink
Planning snapshot full list1111 issues used for planning baseline
Sprint review / outcome snapshot full list1111 issues reviewed at sprint review

These links are snapshot-exact JQL lists, intended for drill-down and debugging.

Evidence artifacts

ArtifactLink
Issue audit registerOpen issue-level audit CSV
Metric lineageOpen metric lineage CSV
JQL traceability registerOpen JQL traceability CSV
Sprint metrics JSONOpen sprint metrics JSON

These companion artifacts keep the pulse debuggable when a leader wants the exact rows behind a metric or a count.