Alexandru Murarescu
- News published filter fixGitLab BugfixMergedCode+8-1Net+7
- News hotfixGitLab BugfixMergedCode+4-4Net+0
- Code+245-94Net+151
- <@U8983QPL1>, mai dai te rog o data in prod?Slack InfraObserved
Readable export generated from the normalized team report data. Exact window: Sat, May 2 07:00 to Sat, May 9 07:00. Use the tabs below to jump between sections.
+54614 / -26482 (net +28132) across 211 commit(s) across 78 distinct MR(s).
Code churn uses in-window commits. Linked MR evidence also includes earlier merges; it is not weekly merge throughput.
Bugs, Delivery, and Other Work with GitLab evidence.
Work in Progress with GitLab evidence.
Filtered total includes 15 direct repo activity commit(s), so 211 = 109 done + 86 WIP + 15 direct repo activity + 1 recovered code activity.
Completed delivery counts use the same denominator as the Delivery tab.
Stories and Improvements only: 50 × (weekly changed lines / 10,000)^0.75 + 35 × (elapsed Romanian business days / 20)^0.75 + 15 × √(dated participants / 4). Done counts evidence within this week; active WIP stops at the cutoff. These are index points, not hours or capacity days.
Exact / range / limited counts disclose input coverage. Ranges use frozen Q3 calibration; limited-evidence issues are visible but omitted from numeric subtotals. Bugs, Tasks, ticketless and other work keep a separate, unchanged activity index. Neither index is added to the other. Combined effort deduplicates issue appearances and must not be calculated by adding the Done and WIP scores.
| Activity | Bucket | Story/Improvement effort | Exact / range / limited | Other activity index |
|---|---|---|---|---|
| Done | Monday.com | 166.8–211.8 | 6 / 3 / 0 | 9 |
| Done | Outside Monday.com | 57.1 | 4 / 0 / 0 | 115 |
| Done | Bugs | 0 | 0 / 0 / 0 | 172 |
| WIP | Monday.com | 240.1–247.1 | 7 / 1 / 0 | 0 |
| WIP | Outside Monday.com | 0 | 0 / 0 / 0 | 12 |
| WIP | Bugs | 0 | 0 / 0 / 0 | 39 |
| WIP + Done (unique issues) | Monday.com | 395.3–437.3 | 13 / 3 / 0 | 9 |
| WIP + Done (unique issues) | Outside Monday.com | 57.1 | 4 / 0 / 0 | 127 |
| WIP + Done (unique issues) | Bugs | 0 | 0 / 0 / 0 | 211 |
| Issue | Coverage | Weekly lines | Weekday fractions | Dated participants | Q3 index |
|---|---|---|---|---|---|
| ADS-4976 · [Elevi]- Inactivarea observatiilor elevilor în Catalogul PDF | Score | 8.0 | 1.006 | 2 | 14.6 |
| ADS-5054 · [Documente] - Schimbarea numelui inspectoratului din București | Score | 4.0 | 1.011 | 2 | 14.5 |
| ADS-5337 · Absențele adăugate la un optional care nu trebuie sa fie vizibil in documente, se iau in calcul in catalogul PDF | Score | 51.0 | 1.768 | 1 | 14.1 |
| ADS-6606 · [Admitere v2] - US2 Generarea de clasamente/distribuirea automata | Score | 3891.0 | 4.510 | 1 | 43.6 |
| ADS-6705 · [BE][UPA] -Feedback pe diferite secțiuni din platforma ep.2 | Score | 172.0 | 4.160 | 2 | 23.8 |
| ADS-6879 · 3. Refactor autentificare mobile | Range | 0.0 | 0.436 | Unavailable | 9–15 |
| ADS-7146 · [UPA/Asachi] -Filtre statistici | Score | 0.0 | 0.428 | 1 | 9.5 |
| ADS-7163 · [FE][Cazari] -Administrare UI Responsive | Score | 330.0 | 3.539 | 1 | 20.9 |
| ADS-7222 · [UNI][MAIN][Studenti] -Teste automate E2E | Score | 10.0 | 1.571 | 1 | 13.0 |
| ADS-7225 · [Admitere V2] - Adaugare manuala candidat&editare candidat | Range | 477.0 | Unavailable | 1 | 15–25 |
| ADS-7362 · Notificare pentru news | Range | Unavailable | 4.441 | 1 | 19–48 |
| ADS-7425 · [Admitere v2][Taxe] - 1. Create session - Taxe | Score | 369.0 | 0.245 | 1 | 13.0 |
| ADS-7473 · [UNI][MAIN][Plan invatamant] - Teste automate serii E2E | Score | 167.0 | 1.140 | 1 | 13.9 |
Last available weekly delivery, test, and alert context. Missing report weeks stay visible as gaps.
Source-backed implementation load for the week: strict delivered outcomes plus active WIP items. It is broader than Done-only output because open WIP can consume engineering capacity before it closes.
Example: 10 strict delivered outcomes plus 4 active WIP items means 14 strict load items; a closure-only Done row with no Jira active-flow and no GitLab code, MR, or commit evidence is excluded.
Added plus deleted lines from source-backed Done items plus active WIP rows, grouped by Monday roadmap, Outside Monday, and Bugs.
Example: 600 Done lines and 400 WIP lines in Monday roadmap means 1,000 WIP + Done code touch for Monday.
Open WIP only. Sums added plus deleted lines on active WIP rows by planning bucket.
Example: an In Progress story with +900 / -100 contributes 1,000 WIP code touch before it closes.
Done items only. Sums added plus deleted lines from source-backed delivered rows in the report week.
Example: two completed bug fixes with +50 / -10 and +20 / -5 contribute 85 Done code touch.
Strict load item count: Done items that have implementation evidence plus active WIP items.
Example: 10 Done items plus 4 active WIP items means 14 WIP + Done items.
Open WIP item count from the report's WIP tab, grouped into Monday roadmap, Outside Monday, and Bugs.
Example: 3 In Progress stories and 1 Code Review bug produce 4 WIP items across their buckets.
Delivered or closed items only, after removing rows that lack Jira active-flow and GitLab implementation evidence.
Example: 12 Jira closures minus 3 no-code change rows means 9 Done items.
Q3 relative effort for Stories and Improvements only, deduplicating issue appearances across Done and WIP.
50 × (weekly lines / 10000)^0.75 + 35 × (elapsed Romanian business days / 20)^0.75 + 15 × sqrt(dated participants / 4). Lower/upper bounds retain input uncertainty; limited evidence is disclosed separately.
The same Q3 model for active Stories and Improvements, with evidenced open delivery episodes bounded by the weekly cutoff.
This is an index, not hours or capacity days. Bugs, Tasks and ticketless work use a separate activity index.
The same Q3 model using evidence inside this canonical week for eligible completed Stories and Improvements.
Original type/code/commit/MR activity rules remain unchanged for other work. Different indices are never added together.
Bugs, Tasks, ticketless and other non-Story/Improvement work retain the existing type/code/commit/MR bands.
WIP rows add +2. This unchanged activity index is kept separate from Q3 Story/Improvement effort and from capacity days.
Rows visible in closure volume but excluded from implementation load because they have neither active Jira flow nor GitLab code, MR, or commit evidence.
Example: a Jira ticket moved Done during the week with no active-flow or code evidence lands here instead of in load.
This-week added and solved finalyear bug counts.
Loading readiness data...
This-week added and solved Codex-reported bug counts.
Loading Codex bugs data...
Visible delivery shows 62 completed item(s) (28 bugs, 32 delivery items, 2 non-ticketed GitLab items) and 13 in-progress item(s), with WIP intentionally preserved from open MR commit activity and Jira-only active tickets, completed scope also including Jira-closed carryovers and Jira-only closures with explicit evidence notes, and Slack correlation layered on where channel access allowed it.
| Key | Title | Time | Type | Status | Priority | Tags | People | Work Stream | Evidence |
|---|---|---|---|---|---|---|---|---|---|
| No Jira ticket | News published filter fix | 2026-05-08 11:51 | GitLab Bugfix | Merged | - | Alexandru Murarescu | Not recorded | ||
| No Jira ticket | [HOTFIX] New tenant documents views | 2026-05-07 16:03 | GitLab Bugfix | Merged | - | Ionut Ciolan | Not recorded | ||
| No Jira ticket | [FIX]: Smoke tests (uni&pre-uni) | 2026-05-05 18:52 | GitLab Bugfix | Merged | - | Paul Tanasuca | Not recorded | ||
| No Jira ticket | News hotfix | 2026-05-05 16:54 | GitLab Bugfix | Merged | - | Alexandru Murarescu | Not recorded | ||
| No Jira ticket | [HOTFIX] cancel invoice bug fixed | 2026-05-04 15:33 | GitLab Bugfix | Merged | - | Ionut Ciolan | Not recorded | ||
| No Jira ticket | Fix uni-messages e2e test | 2026-05-04 12:03 | GitLab Bugfix | Merged | - | Paul Tanasuca | Not recorded | ||
| ADS-7068 | [BUG] - Disciplina optionala indisponibila dupa import | 2026-05-04 10:15 | Bug | Done | High | - | Andrei Alexandru | University | MRs: !187 |
| ADS-7131 | [FE] Calendar | 2026-05-05 23:04 | Bug | Done | Medium | - | Pavel Petronel, Marian Andrei | Team 1 | MRs: !1776+3 / -0 (net +3) across 1 commit(s) |
| ADS-7298 | [BE-JAVA][Plan invatamant] - Calcul incorect pe centralizator | 2026-05-15 14:25 | Bug | Done | High | - | Iuliana Gugeanu | University | MRs: !1755 |
| ADS-7300 | [BE][UPA] [SITUAȚIE ȘCOLARĂ] - Modificari semnalate pe SITUAȚIA ȘCOLARĂ | 2026-05-04 10:19 | Bug | Done | High | - | Stefan Achim | University | |
| ADS-7312 | Elevi.php: evolutie_get() dereferences missing class info and builds invalid ranking queries - 6 errors/1h | 2026-05-04 10:28 | Bug | Done | High | Catalin Cojan | Team 2 | MRs: !2479 | |
| ADS-7331 | [BE][Adauga disciplina][Plan de învățământ] - Adaugarea manuala a unei discipline | 2026-05-07 15:55 | Bug | Done | High | - | Stefan Achim, Andrei Alexandru | University | MRs: !1783+8 / -4 (net +4) across 1 commit(s) |
| ADS-7344 | [BE] - Eroare 500 la plati online prin EuPlatesc | 2026-05-11 16:11 | Bug | Done | High | - | Edgar Alexa, Ionut Ciolan | Team 2 | |
| ADS-7348 | [FE/BE] [Asachi][Catalog-absente]- Afisare limitata a studentilor de la o anumita grupa | 2026-05-07 15:55 | Bug | Done | High | - | Stefan Achim, Andrei Alexandru | University | |
| ADS-7350 | [BE][UPA][Catalog-note discipline] - Nu se afiseaza studentii la DPPD Nivelul II- postuniversitar | 2026-05-07 17:29 | Bug | Done | High | - | Andrei Alexandru | University | Notes only |
| ADS-7355 | [BE] - Ca vizitator nu poti sa aplici la o sesiune | 2026-05-04 10:27 | Bug | Done | Highest | - | George Murgoci | Team 2 | |
| ADS-7356 | [BE] - Eroare la incarcarea fisierelor in documentele personalizate | 2026-05-04 10:27 | Bug | Done | Highest | - | George Murgoci | Team 2 | |
| ADS-7361 | [FE/BE] - Nu se pot adauga fisiere la documentele personalizate | 2026-05-04 10:27 | Bug | Done | Highest | - | George Murgoci | Team 2 | MRs: !125 |
| ADS-7371 | [BE/FE] - Numele candidatului apare cu null/null | 2026-05-04 10:06 | Bug | Done | Urgent | - | Catalin Cojan | Team 2 | MRs: !2480 |
| ADS-7383 | cercuri_pedagogice.php: pedagogical circle form JS references undefined key - 8 errors/2h | 2026-05-12 14:03 | Bug | Done | Highest | Ionut Ciolan | Team 1 | MRs: !2484+25 / -11 (net +14) across 3 commit(s) | |
| ADS-7386 | Preferinte.php: teacher group preferences page returns HTTP 500 - 17 hits/Friday | 2026-05-08 13:55 | Bug | Done | Highest | Marian Andrei | Team 1 | Notes only | |
| ADS-7387 | admission-api: admission document endpoint returns HTTP 500 - 13 hits/Friday | 2026-05-06 00:13 | Bug | Done | Highest | George Murgoci | Team 2 | MRs: !133+2 / -1 (net +1) across 1 commit(s) | |
| ADS-7393 | [BE] - Trimite mesaj ca ISJ la membru comisie | 2026-05-04 10:26 | Bug | Done | Medium | - | Catalin Cojan, Dragoș Ivan | Team 2 | MRs: !2470 |
| ADS-7436 | [BE][Asachi] [Urgent]- Export cu lista cadrelor didactice si disciplinele asociate pentru domeniul Inginerie mecanică | 2026-05-04 10:43 | Bug | Done | High | - | - | University | Notes only |
| ADS-7438 | Afisare medie trimestriala | 2026-05-05 22:54 | Bug | Done | High | Pavel Petronel | Team 1 | MRs: !1772+37 / -28 (net +9) across 1 commit(s) | |
| ADS-7461 | [BE][Cazari][Asachi] - Obligatia de plata (taxa aprilie 2026 suma 657) apare incasata dar nu s-a procesat in contul studentului | 2026-05-05 07:55 | Bug | Done | High | - | Ionut Ciolan | University | Notes only |
| ADS-7478 | [FE] - Eroare 400 la apasarea butonului "Pasul urmator" in procesul de unificare conturi din Admin/Director | 2026-05-05 16:07 | Bug | Done | Highest | - | Marian Andrei | Team 1 | Notes only |
| ADS-7522 | [BE][UPA][Catalog-note discipline] - Nu se afiseaza studentii la disciplina Practica de specialitate | 2026-05-08 17:00 | Bug | Done | High | - | Andrei Alexandru | University | Notes only |
Raw GitLab audit: +36114 / -20987 (net +15127) across 89 commit(s) across 35 distinct MR(s). Churn cards are deduplicated by MR/commit; row evidence can repeat the same MR when it is linked to multiple Jira items. Evidence split: MR-backed + Direct commits + Jira-only = Total; Carryovers are a subset. Scope split: Product Delivery + Infra = Total. Monday split uses the same row-level Monday visibility across Product Delivery and Infra; Trend Context then renders the split per lane.
| Key | Title | Time | Type | Status | Priority | Scope | Monday | People | Work Stream | Evidence |
|---|---|---|---|---|---|---|---|---|---|---|
| ADS-4976 | [Elevi]- Inactivarea observatiilor elevilor în Catalogul PDF | 2026-05-07 15:55 | Improvement | Done | Medium | Product Delivery | Outside Monday | Pavel Petronel | Team 1 | MRs: !112+0 / -8 (net -8) across 2 commit(s) |
| ADS-5054 | [Documente] - Schimbarea numelui inspectoratului din București | 2026-05-07 15:55 | Improvement | Done | High | Product Delivery | Outside Monday | Pavel Petronel | Team 1 | MRs: !113+2 / -2 (net +0) across 1 commit(s) |
| ADS-5337 | Absențele adăugate la un optional care nu trebuie sa fie vizibil in documente, se iau in calcul in catalogul PDF | 2026-05-11 16:11 | Improvement | Done | High | Product Delivery | Outside Monday | Pavel Petronel | Team 1 | MRs: !114+34 / -17 (net +17) across 1 commit(s) |
| ADS-6022 | [Teste și chestionare] - De adăugat șabloanele (SASAT și MATE) pentru Școala Gimnazială Râu de Mori, Râu de Mori, Hunedoara | 2026-05-05 14:07 | Task | Done | Highest | Product Delivery | Outside Monday | Marian Andrei | Team 1 | Notes only |
| ADS-6056 | [UPG/Petre Andrei/Asachi] Generator Adeverinte - Integrarea modului din Preuni | 2026-05-08 20:56 | Story | Done | Medium | Product Delivery | Monday | - | University | Notes only |
| ADS-6606 | [Admitere v2] - US2 Generarea de clasamente/distribuirea automata | 2026-05-13 10:04 | Story | Done | Urgent | Product Delivery | Monday | George Murgoci | Team 2 | |
| ADS-6705 | [BE][UPA] -Feedback pe diferite secțiuni din platforma ep.2 | 2026-05-14 09:43 | Story | Done | Medium | Product Delivery | Monday | Stefan Achim, Virlan Francisc-Gabriel +1 | University | |
| ADS-6840 | Date personale elevi catalog PDF - după comasare școli | 2026-06-10 16:05 | Task | Done | Highest | Product Delivery | Outside Monday | Ionut Ciolan, Marian Andrei | Team 1 | MRs: !2467+2190 / -2056 (net +134) across 11 commit(s) |
| ADS-6879 | 3. Refactor autentificare mobile | 2026-05-04 10:27 | Story | Done | High | Infra | Monday | Daniel Onisoru, Ioana Ivan +1 | Mobile | |
| ADS-7146 | [UPA/Asachi] -Filtre statistici | 2026-05-04 10:16 | Story | Done | Medium | Product Delivery | Monday | Ionut Ciolan, Virlan Francisc-Gabriel +2 | University | |
| ADS-7163 | [FE][Cazari] -Administrare UI Responsive | 2026-06-05 14:40 | Story | Done | Medium | Product Delivery | Monday | Iuliana Gugeanu | University | MRs: !1738+301 / -29 (net +272) across 3 commit(s) |
| ADS-7205 | Groups page | 2026-05-04 10:25 | Story | Done | Medium | Product Delivery | Monday | Stefan Agrigo | Mobile | Notes only |
| ADS-7222 | [UNI][MAIN][Studenti] -Teste automate E2E | 2026-06-05 14:40 | Story | Done | Medium | Product Delivery | Monday | Dana-Mihaela Marițca | University | MRs: !1737+7 / -3 (net +4) across 1 commit(s) |
| ADS-7225 | [Admitere V2] - Adaugare manuala candidat&editare candidat | 2026-05-21 14:41 | Story | Done | Urgent | Product Delivery | Monday | George Murgoci | Team 2 | |
| ADS-7227 | Testare la tot ce a făcut George la Admitere | 2026-05-07 12:56 | Task | Done | Highest | Product Delivery | Outside Monday | George Murgoci, Dragoș Ivan | Team 2 | |
| ADS-7260 | [Spike + Solving] - Investigare latenta adaugare Note/Absente | 2026-05-06 00:13 | Task | Done | Urgent | Product Delivery | Outside Monday | Dragoș Ivan, Ioana Ivan | Team 2 | MRs: !1762+1266 / -889 (net +377) across 6 commit(s) |
| ADS-7276 | [UNI] University Onboarding - Bulk Operations by RC Team | 2026-05-14 09:43 | Task | Done | Medium | Product Delivery | Outside Monday | Ionut Ciolan, Iuliana Gugeanu +1 | University | |
| ADS-7301 | [BE] AI skills | 2026-05-04 10:33 | Task | Done | Medium | Product Delivery | Outside Monday | Marian Andrei | Team 1 | Notes only |
| ADS-7362 | Notificare pentru news | 2026-05-08 10:34 | Story | Done | Medium | Product Delivery | Monday | Stefan Agrigo | Mobile | |
| ADS-7395 | [FE][Calendar][Condica] - De adaugat un postmessage pentru Mob | 2026-05-05 22:55 | Task | Done | Medium | Product Delivery | Outside Monday | Ioana Ivan, Razvan Antoci | Team 1 | |
| ADS-7396 | [MOB] - Fixes and improvements-27.04.2026 | 2026-05-06 12:16 | Task | Done | Medium | Product Delivery | Outside Monday | Razvan Antoci, Stefan Agrigo | Mobile | |
| ADS-7422 | News - Leftovers | 2026-05-07 10:22 | Task | Done | Highest | Product Delivery | Outside Monday | Alexandru Murarescu, Cosmin Olaru +1 | Team 1 | |
| ADS-7425 | [Admitere v2][Taxe] - 1. Create session - Taxe | 2026-05-19 13:05 | Story | Done | Urgent | Product Delivery | Monday | Dragoș Ivan | Team 2 | MRs: !134+312 / -57 (net +255) across 2 commit(s) |
| ADS-7435 | Modificari functionare MFA Bypass | 2026-05-08 14:02 | Task | Done | Medium | Infra | Monday | Ionut Ciolan, Daniel Onisoru | Team 1 | MRs: !2482+111 / -74 (net +37) across 6 commit(s) |
| ADS-7462 | [FE] [Cazari]- Data de inceput default >= 12 luni | 2026-05-07 15:55 | Task | Done | Medium | Product Delivery | Outside Monday | Stefan Achim | University | MRs: !1785+63 / -15 (net +48) across 1 commit(s) |
| ADS-7464 | Mobile - News | 2026-05-08 14:02 | Task | Done | Medium | Product Delivery | Outside Monday | Razvan Antoci, Cosmin Olaru | Team 1 | Notes only |
| ADS-7467 | [FQ] Recalculare medii | 2026-05-07 13:50 | Task | Done | High | Product Delivery | Outside Monday | Andrei Dragan | Team 1 | Notes only |
| ADS-7473 | [UNI][MAIN][Plan invatamant] - Teste automate serii E2E | 2026-05-15 14:25 | Story | Done | Medium | Product Delivery | Outside Monday | Dana-Mihaela Marițca | University | MRs: !1775+151 / -16 (net +135) across 3 commit(s) |
| ADS-7486 | [ Tuiasi ] Platform has been experiencing high latency at times | 2026-05-08 14:03 | Story | Done | Medium | Infra | Monday | Rojan Shrestha | University | Notes only |
| ADS-7491 | [BE] Materia Purtare trebuie sa defineasca nota la purtare in catalog | 2026-05-06 13:26 | Task | Done | High | Product Delivery | Outside Monday | Andrei Dragan | Team 1 | Notes only |
| ADS-7493 | [BE] MCP AI | 2026-05-06 00:19 | Task | Done | Medium | Product Delivery | Outside Monday | Marian Andrei | Team 1 | MRs: !2483+1614 / -1 (net +1613) across 1 commit(s) |
| ADS-7520 | [BE] Investigat import manual | 2026-05-07 15:53 | Task | Done | Medium | Product Delivery | Outside Monday | Marian Andrei | Team 1 | Notes only |
Merged GitLab work that could not be tied to a resolved Jira ticket. Deploy, incident, and infra signals stay in Ops.
| Title | Time | Kind | People | Details |
|---|---|---|---|---|
No Jira ticket | 05-05 13:58 | Non-JiraMergedNo Jira ticket | Stefan Achim | Jira ticket: No Jira ticket shown as GitLab-only work Window churn: +1 / -1 (net +0) across 1 commit(s) MRs: !1774 — Achim Stefan (1 commits) [+1 / -1 (net +0)] Notes: Merged in GitLab during the report window without an ADS ticket key. |
No Jira ticket | 05-05 13:56 | Non-JiraMergedNo Jira ticket | Marian Andrei | Jira ticket: No Jira ticket shown as GitLab-only work Window churn: +237 / -1839 (net -1602) across 1 commit(s) MRs: !2434 — Marian Andrei (1 commits) [+237 / -1839 (net -1602)] Notes: Merged in GitLab during the report window without an ADS ticket key. |
This tab is reserved for deployment evidence. GitLab production deploy jobs are the source of truth, with Slack deploy messages attached as corroborating evidence when available.
| Title | Time | Kind | People |
|---|---|---|---|
| 2026-05-07 15:30 | GitLab DeploySuccess | Marian Andrei | |
| 2026-05-05 19:31 | GitLab DeploySuccess | Dragoș Ivan | |
| 2026-05-05 18:26 | GitLab DeploySuccess | Daniel Onisoru | |
| 2026-05-05 17:08 | GitLab DeploySuccess | Ioana Ivan | |
| 2026-05-05 16:12 | GitLab DeploySuccess | Marian Andrei |
This tab does not include every Slack warning. We check readable messages from #dezvoltare, #infra, #major-incident, #devops, and #devleads, then keep only messages classified as incident or infra signals. Messages with an ADS-XXXX key are attached back to the matching Jira/GitLab item instead of being duplicated here. Deploy messages are kept in the separate Deployments tab only when they match a GitLab production deployment, test-result chatter is ignored, very short generic infra messages are ignored, and repeated alerts pushed in succession with the same channel/category/summary are collapsed into one signal.
| Title | Time | Kind | People | Details |
|---|---|---|---|---|
| 2026-05-08 11:12 | Slack IncidentObserved | Cosmin Olaru | Notes: Observed in Slack channel #dezvoltare during the report window. | |
| 2026-05-06 10:17 | Slack IncidentObserved | Daniel Onisoru, Rojan Shrestha | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-05-06 09:30 | Slack IncidentObserved | Rojan Shrestha | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-05-04 19:21 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-05-04 18:19 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-05-04 15:06 | Slack IncidentObserved | Rojan Shrestha | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-05-04 13:12 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-05-04 12:39 | Slack IncidentObserved | Rojan Shrestha | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-05-04 12:17 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-05-03 07:14 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-05-03 07:09 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-05-08 13:12 | Slack InfraObserved | Rojan Shrestha | Notes: Observed in Slack channel #infra during the report window. | |
| 2026-05-08 11:36 | Slack InfraObserved | Dragoș Ivan | Notes: Observed in Slack channel #infra during the report window. | |
| 2026-05-08 11:35 | Slack InfraObserved | Dragoș Ivan, Rojan Shrestha | Notes: Observed in Slack channel #infra during the report window. | |
| 2026-05-07 15:27 | Slack InfraObserved | Marian Andrei | Notes: Observed in Slack channel #dezvoltare during the report window. | |
| 2026-05-05 17:06 | Slack InfraObserved | Ioana Ivan | Notes: Observed in Slack channel #dezvoltare during the report window. | |
| 2026-05-05 16:55 | Slack InfraObserved | Alexandru Murarescu, Marian Andrei, Ioana Ivan | Notes: Observed in Slack channel #dezvoltare during the report window. | |
| 2026-05-05 16:09 | Slack InfraObserved | Marian Andrei | Notes: Observed in Slack channel #dezvoltare during the report window. | |
| 2026-05-04 15:39 | Slack InfraObserved | Ionut Ciolan | Notes: Observed in Slack channel #dezvoltare during the report window. | |
| 2026-05-04 14:26 | Slack InfraObserved | Marian Andrei | Notes: Observed in Slack channel #dezvoltare during the report window. |
Raw GitLab audit: +10407 / -3177 (net +7230) across 86 commit(s) across 12 distinct MR(s).
| Key | Title | Type | Status | Priority | Focus | People | Work Stream | Evidence |
|---|---|---|---|---|---|---|---|---|
| ADS-1757 | [Financiar] - Plati partiale | Story | Done | Highest | Catalin Cojan, Edgar Alexa +1 | Team 2 | MRs: !1724+1288 / -426 (net +862) across 15 commit(s) | |
| ADS-5282 | [FE][Elevi] - Nu functioneaza corect back button de pe pagina detalii elev | Bug | Canceled | High | Pavel Petronel | Team 1 | MRs: !1781+3 / -1 (net +2) across 1 commit(s) | |
| ADS-6284 | [Noutăți][Dashboard] - Adauga noutati | Story | Done | Highest | Alexandru Murarescu, Catalin Cojan +5 | Team 2 | MRs: !1798+933 / -2 (net +931) across 2 commit(s) | |
| ADS-6341 | Raport anual 7hills | Story | Done | Medium | Andrei Dragan, Razvan Antoci +2 | Team 1 | MRs: !1768+1807 / -723 (net +1084) across 20 commit(s) | |
| ADS-6661 | [Catalog][Situatie scolara] - US4 Echivalari | Story | Done | Medium | Stefan Achim, Andrei Alexandru | University | MRs: !1766+3124 / -1253 (net +1871) across 9 commit(s) | |
| ADS-6750 | Interfata Minister | Story | Done | Highest | Andrei Dragan, Cosmin Olaru +2 | Team 1 | MRs: !1780+2420 / -591 (net +1829) across 19 commit(s) | |
| ADS-7225 | [Admitere V2] - Adaugare manuala candidat&editare candidat | Story | Done | Urgent | George Murgoci | Team 2 | MRs: !1818+489 / -28 (net +461) across 4 commit(s) | |
| ADS-7290 | Design admitere contestatii | Subtask | In Progress | Medium | Daniel Nechita | University | Notes only | |
| ADS-7347 | [BUG] - Imposibilitate modificare data sesiune | Bug | Done | Medium | Stefan Achim, Andrei Alexandru | University | MRs: !1790+8 / -1 (net +7) across 1 commit(s) | |
| ADS-7403 | Add histogram from traefik ingress based on logs and export it to prometheus | Task | To Do | Medium | Raul Popovici | Not recorded | MRs: !240 | |
| ADS-7480 | [Financiar] Numele bancii si cont IBAN | Story | Done | High | Edgar Alexa | Team 2 | MRs: !1814+8 / -35 (net -27) across 1 commit(s) | |
| ADS-7481 | [BE][News] - Issues news uni | Bug | Done | High | Alexandru Murarescu | Team 2 | MRs: !1773+245 / -94 (net +151) across 12 commit(s) | |
| ADS-7488 | [Admitere v2] [Cont candidat][PHP][MOB]- Posibilitatea de vizualizare/editare preferinte cont | Story | Done | Highest | Stefan Achim, Stefan Musat | University | MRs: !1782+72 / -23 (net +49) across 2 commit(s) |
Recovered commit activity, including closed experiments. These entries do not add delivered items, active WIP, capacity or effort/load points.
| Total completed | 62 |
| Bugs | 28 |
| Delivery | 32 |
| Other work (GitLab only) | 2 |
| Ops signals | 20 |
| WIP | 13 |
| Incidents | 11 |
| Done work commits | 109 |
| MRs merged this week | |
| Historical merged MR evidence | |
| MR evidence open at cutoff | |
| Linked MR evidence | 78 |
| Done work linked MR evidence | 65 |
| WIP commits | 86 |
| WIP linked MR evidence | 12 |
| Code churn | +28881-11415Net+17466 |
| Raw code churn | +54614-26482Net+28132 |
| Filter fallback commits | 0 |
| Reliability warnings | 0 |
This total is not “new code shipped.” It is filtered in-window GitLab churn across completed work, WIP, non-ticketed GitLab work, and separately tracked direct repo activity, after excluding non-delivery config/tooling noise, multi-parent merge commits, squash commits, and deduplicating direct repo fallback commits that were already counted elsewhere in the report.
Direct repo activity is GitLab work captured from configured fallback repositories when it could not be mapped safely back to Jira items, so it is tracked separately instead of being folded into Bugs, Delivery, Other Work, or WIP.
Churn is calculated from filtered GitLab commit stats for commits inside the report window, across merged MRs, prior-merge carryovers, and open-MR WIP.
We use in-window commit activity instead of full MR size so older merges or long-running branches do not overstate weekly work. Multi-parent merge commits and squash commits are excluded, and direct repo fallback commits are deduplicated when the same commit was already counted through MR-backed or ticket-mapped evidence. Jira-only items without GitLab evidence stay at 0 churn.
Filtered churn excludes obvious non-delivery file noise such as CI/workflow files, formatter/lint/editor configs, TypeScript/build/CLI configs, env templates, hooks, lockfiles, and generated migration snapshot files. Runtime-impacting files like Dockerfile, mikro-orm.config.ts, real migrations, and app code remain counted.
Raw GitLab Churn Audit: +54614 / -26482 (net +28132) across 211 commit(s) across 78 distinct MR(s).
References: GitLab merge request commits API and GitLab commit stats API.
| Person | Role | Completed | Bugs | Delivery | Other | Ops | WIP | Code churn | Notes |
|---|---|---|---|---|---|---|---|---|---|
| Alexandru Murarescu | Mid Full Stack Developer (React, Node) | 3 | 2 | 1 | 0 | 1 | 2 | +257-99Net+158 | |
| Andrei Alexandru | Senior Backend Java | 8 | 5 | 3 | 0 | 0 | 2 | +12-18Net-6 | |
| Andrei Dragan | Senior Backend PHP | 2 | 0 | 2 | 0 | 0 | 2 | +0-0Net+0 | |
| Catalin Cojan | Senior Backend PHP | 4 | 3 | 1 | 0 | 0 | 2 | +2-2Net+0 | |
| Cosmin Olaru | Senior Manual QA | 2 | 0 | 2 | 0 | 1 | 2 | +0-0Net+0 | |
| Dana-Mihaela Marițca | Junior Front End Developer | 3 | 0 | 3 | 0 | 0 | 0 | +158-19Net+139 | |
| Daniel Onisoru | Architect | 2 | 0 | 2 | 0 | 1 | 0 | +0-0Net+0 | |
| Dragoș Ivan | Senior Front End Developer (React) | 4 | 1 | 3 | 0 | 2 | 0 | +1578-946Net+632 | |
| Dron Gabriel | Former Front End Developer (React) | 0 | 0 | 0 | 0 | 0 | 2 | +1744-651Net+1093 | |
| Edgar Alexa | Mid Full Stack Developer (React, Node) | 1 | 1 | 0 | 0 | 0 | 2 | +1294-459Net+835 | |
| George Murgoci | Mid Full Stack Developer (React, Node) | 7 | 4 | 3 | 0 | 0 | 1 | +3186-1729Net+1457 | |
| Ioana Ivan | Mid Front End Developer (React) | 3 | 0 | 3 | 0 | 2 | 1 | +2558-672Net+1886 | |
| Ionut Ciolan | Senior Backend PHP | 9 | 5 | 4 | 0 | 1 | 1 | +6028-114Net+5914 | |
| Iuliana Gugeanu | Junior Front End Developer | 3 | 1 | 2 | 0 | 0 | 0 | +818-398Net+420 | |
| Marian Andrei | Senior Backend Developer | 9 | 3 | 5 | 1 | 4 | 0 | +3875-3869Net+6 | |
| Paul Bostan | Senior Manual QA | 0 | 0 | 0 | 0 | 0 | 1 | +0-0Net+0 | |
| Paul Tanasuca | Mid Test Automation Engineer (Cypress, Playwright) | 2 | 2 | 0 | 0 | 0 | 0 | +25-6Net+19 | |
| Pavel Petronel | Front End Developer (React) | 5 | 2 | 3 | 0 | 0 | 2 | +142-128Net+14 | |
| Raul Popovici | Former DevOps/SRE Engineer | 0 | 0 | 0 | 0 | 0 | 2 | +0-0Net+0 | |
| Razvan Antoci | Junior-Mid Manual QA | 3 | 0 | 3 | 0 | 0 | 1 | +0-0Net+0 | |
| Rojan Shrestha | DevOps/SRE Engineer | 1 | 0 | 1 | 0 | 6 | 0 | +0-0Net+0 | |
| Stefan Achim | Mid-Sen Full Stack Developer (Front End React, Backend Node) | 6 | 3 | 2 | 1 | 0 | 3 | +3372-1359Net+2013 | |
| Stefan Agrigo | Junior Mobile Developer | 3 | 0 | 3 | 0 | 0 | 2 | +2208-899Net+1309 | Unmapped repo activity: +1317 / -369 (net +948) across 8 commit(s) |
| Stefan Musat | Senior Mobile Developer | 1 | 0 | 1 | 0 | 0 | 1 | +236-45Net+191 | Unmapped repo activity: +236 / -45 (net +191) across 7 commit(s) |
| Virlan Francisc-Gabriel | Junior Backend Java Developer | 2 | 0 | 2 | 0 | 0 | 0 | +0-0Net+0 | |
| Codex | AI contributor | 0 | 0 | 0 | 0 | 0 | 1 | +1388-2Net+1386 | Codex combines explicitly marked Codex work with VP and Valentin Pal, as requested. Shared commits and work items count once within this category. Original authors remain in the source evidence. This grouping does not assert that every change from those accounts was AI-authored. Bugs merely reported by Codex are not code contributions. No fixed human capacity is assigned to Codex. |
Visible delivery shows 62 completed item(s) (28 bugs, 32 delivery items, 2 non-ticketed GitLab items) and 13 in-progress item(s), with WIP intentionally preserved from open MR commit activity and Jira-only active tickets, completed scope also including Jira-closed carryovers and Jira-only closures with explicit evidence notes, and Slack correlation layered on where channel access allowed it.