Readable export generated from the normalized team report data. Exact window: Sat, Jul 18 07:00 to Sat, Jul 25 07:00. Use the tabs below to jump between sections.
+12082 / -2707 (net +9375) across 117 commit(s) across 91 distinct MR(s).
Code churn uses in-window commits. Linked MR evidence also includes earlier merges; it is not weekly merge throughput.
Bugs, Delivery, and Other Work with GitLab evidence.
Work in Progress with GitLab evidence.
Filtered total includes 17 direct repo activity commit(s), so 117 = 41 done + 48 WIP + 17 direct repo activity + 14 recovered code activity.
Completed delivery counts use the same denominator as the Delivery tab.
Stories and Improvements only: 50 × (weekly changed lines / 10,000)^0.75 + 35 × (elapsed Romanian business days / 20)^0.75 + 15 × √(dated participants / 4). Done counts evidence within this week; active WIP stops at the cutoff. These are index points, not hours or capacity days.
Exact / range / limited counts disclose input coverage. Ranges use frozen Q3 calibration; limited-evidence issues are visible but omitted from numeric subtotals. Bugs, Tasks, ticketless and other work keep a separate, unchanged activity index. Neither index is added to the other. Combined effort deduplicates issue appearances and must not be calculated by adding the Done and WIP scores.
| Activity | Bucket | Story/Improvement effort | Exact / range / limited | Other activity index |
|---|---|---|---|---|
| Done | Monday.com | 108.8–137.8 | 4 / 4 / 1 | 11 |
| Done | Outside Monday.com | 139.9–173.9 | 5 / 4 / 0 | 29 |
| Done | Bugs | 0 | 0 / 0 / 0 | 76 |
| WIP | Monday.com | 260.9 | 9 / 0 / 0 | 11 |
| WIP | Outside Monday.com | 36.2–43.2 | 1 / 1 / 1 | 7 |
| WIP | Bugs | 0 | 0 / 0 / 0 | 7 |
| WIP + Done (unique issues) | Monday.com | 356.7–374.7 | 13 / 3 / 1 | 22 |
| WIP + Done (unique issues) | Outside Monday.com | 176.1–217.1 | 6 / 5 / 1 | 36 |
| WIP + Done (unique issues) | Bugs | 0 | 0 / 0 / 0 | 83 |
| Issue | Coverage | Weekly lines | Weekday fractions | Dated participants | Q3 index |
|---|---|---|---|---|---|
| ADS-6545 · [SDK] Implementare v1 layer comunicare native-web *post message bridge | Range | 0.0 | 1.759 | Unavailable | 13–19 |
| ADS-6568 · [FE] - Director dashboard graph update | Score | 0.0 | 4.420 | 1 | 18.8 |
| ADS-6694 · [MOB] - Test parenting | Limited evidence | 0.0 | Unavailable | Unavailable | Limited |
| ADS-7149 · [FE][Cazari] - Config structura UI Responsive | Range | 0.0 | 1.722 | Unavailable | 13–19 |
| ADS-7164 · [FE][Cazari] -Taxe UI Responsive | Range | 0.0 | 1.722 | Unavailable | 13–19 |
| ADS-7475 · [UNI][MAIN][Plan invatamant] - Teste automate Fisa disciplinei E2E | Range | 0.0 | 0.000 | Unavailable | 7–13 |
| ADS-7495 · [FE/BE][Adeverinte absolvire] - Creare Probe evaluare | Score | 0.0 | 2.431 | 1 | 14.7 |
| ADS-7496 · [FE/BE][Adeverinte absolvire] - Probe&medie pe situatie scolara | Score | 0.0 | 2.431 | 1 | 14.7 |
| ADS-7896 · Migrare documente S3 | Range | 0.0 | 0.000 | Unavailable | 7–13 |
| ADS-7958 · [FE/BE] - Reconstituire scolaritate - transfer, an repetare | Score | 0.0 | 2.432 | 1 | 14.7 |
| ADS-8055 · [Asachi][FE] - Salvarea pe cataloage sa se faca pe toate paginile nu pe fiecare pagina in parte | Score | 0.0 | 2.432 | 1 | 14.7 |
| ADS-8104 · [BE-PHP] - Gestiunea cazarilor de vara | Score | 0.0 | 2.432 | 1 | 14.7 |
| ADS-8105 · Impartirea pe module | Range | 394.0 | Unavailable | 2 | 17–28 |
| ADS-8247 · [Admitere] - In lista de candidati trebuie sa fie afisat intai numele si apoi prenumele | Score | 41.0 | 4.622 | 2 | 23.1 |
| ADS-8251 · Warning - TraefikServiceHighLatency adservio-production-admission-api | Score | 22.0 | 4.420 | 2 | 22.4 |
| ADS-8262 · [FE] Responsive conduită / listă elevi | Score | 0.0 | 4.420 | 2 | 21.9 |
| ADS-8266 · Investigate/evaluate current alerts on based of volumes vs the hits and update the alerts. | Range | 31.0 | Unavailable | 1 | 10–21 |
| ADS-8274 · Could you take a quick look at the `uni-php-fpm-laravel` container on dev, namespace `main`? Seems to be having some issues. It's a new module that just got merged into main and needs to get release-ready, but the person who worked on it is out today. | Range | 0.0 | Unavailable | 1 | 9–20 |
Last available weekly delivery, test, and alert context. Missing report weeks stay visible as gaps.
Source-backed implementation load for the week: strict delivered outcomes plus active WIP items. It is broader than Done-only output because open WIP can consume engineering capacity before it closes.
Example: 10 strict delivered outcomes plus 4 active WIP items means 14 strict load items; a closure-only Done row with no Jira active-flow and no GitLab code, MR, or commit evidence is excluded.
Added plus deleted lines from source-backed Done items plus active WIP rows, grouped by Monday roadmap, Outside Monday, and Bugs.
Example: 600 Done lines and 400 WIP lines in Monday roadmap means 1,000 WIP + Done code touch for Monday.
Open WIP only. Sums added plus deleted lines on active WIP rows by planning bucket.
Example: an In Progress story with +900 / -100 contributes 1,000 WIP code touch before it closes.
Done items only. Sums added plus deleted lines from source-backed delivered rows in the report week.
Example: two completed bug fixes with +50 / -10 and +20 / -5 contribute 85 Done code touch.
Strict load item count: Done items that have implementation evidence plus active WIP items.
Example: 10 Done items plus 4 active WIP items means 14 WIP + Done items.
Open WIP item count from the report's WIP tab, grouped into Monday roadmap, Outside Monday, and Bugs.
Example: 3 In Progress stories and 1 Code Review bug produce 4 WIP items across their buckets.
Delivered or closed items only, after removing rows that lack Jira active-flow and GitLab implementation evidence.
Example: 12 Jira closures minus 3 no-code change rows means 9 Done items.
Q3 relative effort for Stories and Improvements only, deduplicating issue appearances across Done and WIP.
50 × (weekly lines / 10000)^0.75 + 35 × (elapsed Romanian business days / 20)^0.75 + 15 × sqrt(dated participants / 4). Lower/upper bounds retain input uncertainty; limited evidence is disclosed separately.
The same Q3 model for active Stories and Improvements, with evidenced open delivery episodes bounded by the weekly cutoff.
This is an index, not hours or capacity days. Bugs, Tasks and ticketless work use a separate activity index.
The same Q3 model using evidence inside this canonical week for eligible completed Stories and Improvements.
Original type/code/commit/MR activity rules remain unchanged for other work. Different indices are never added together.
Bugs, Tasks, ticketless and other non-Story/Improvement work retain the existing type/code/commit/MR bands.
WIP rows add +2. This unchanged activity index is kept separate from Q3 Story/Improvement effort and from capacity days.
Rows visible in closure volume but excluded from implementation load because they have neither active Jira flow nor GitLab code, MR, or commit evidence.
Example: a Jira ticket moved Done during the week with no active-flow or code evidence lands here instead of in load.
This-week added and solved finalyear bug counts.
Loading readiness data...
This-week added and solved Codex-reported bug counts.
Loading Codex bugs data...
Visible delivery shows 48 completed item(s) (16 bugs, 30 delivery items, 2 non-ticketed GitLab items) and 15 in-progress item(s), with WIP intentionally preserved from open MR commit activity and Jira-only active tickets, completed scope also including Jira-closed carryovers and Jira-only closures with explicit evidence notes, and Slack correlation layered on where channel access allowed it.
| Key | Title | Time | Type | Status | Priority | Tags | People | Work Stream | Evidence |
|---|---|---|---|---|---|---|---|---|---|
| No Jira ticket | fix Course Syllabus evaluation readiness race | 2026-07-22 13:46 | GitLab Bugfix | Merged | - | VP, Valentin Pal | Not recorded | ||
| No Jira ticket | [hotfix-laravel-log] Add structured logging to Laravel Uni | 2026-07-20 15:05 | GitLab Bugfix | Merged | - | Catalin Cojan | Not recorded | ||
| ADS-5651 | [FE/BE/MOB] - Coprofesorul vede toți elevii clasei, deși are asociați doar unii | 2026-07-21 12:40 | Bug | Done | Medium | - | Stefan Musat | Mobile | Notes only |
| ADS-7961 | [Prod][AWS][OTel] Tempo trace export drops/refusals in collector - 6,354 errors/72h | 2026-07-21 10:18 | Bug | Done | Urgent | Rojan Shrestha | Platform | MRs: !310 | |
| ADS-8118 | [BE] - Lipsa nota si catalog deschis pe restantieri | 2026-07-24 14:10 | Bug | Done | High | Andrei Alexandru | University | Notes only | |
| ADS-8134 | [BE-PHP] - Obligatii generate pentru studenti decazati | 2026-07-24 15:21 | Bug | Done | Highest | Ionut Ciolan | University | Notes only | |
| ADS-8186 | [Prod][AWS][accommodations-api] External person create returns 500 after partial create when fallback faculty is hidden by scope | 2026-07-24 14:13 | Bug | Done | Highest | Andrei Alexandru | University | Notes only | |
| ADS-8224 | [FE] La editarea elevului, campul "rol" nu afiseaza optiuni in dropdown si impiedica salvarea modificarilor | 2026-07-24 10:04 | Bug | Done | Urgent | - | valentin.pal, Pavel Petronel | Team 1 | MRs: !2643 |
| ADS-8244 | [Cazari] - Sold gresit in obligatie de plata fata de fisa studentului | 2026-07-20 10:25 | Bug | Done | High | - | Andrei Alexandru | University | Notes only |
| ADS-8245 | [FE] Preferințe generale alignment | 2026-07-24 10:04 | Bug | Done | Medium | - | Pavel Petronel | Team 1 | MRs: !2017 |
| ADS-8257 | [BE] - Eroare 400 la debifare afisare in catalog a unui transfer intre clase | 2026-07-24 10:04 | Bug | Done | Urgent | - | Marian Andrei, Pavel Petronel | Team 1 | |
| ADS-8269 | [Documente - Catalog] - De modificat fontul primei pagini | 2026-07-24 10:04 | Bug | Done | High | Pavel Petronel | Team 1 | MRs: !154 | |
| ADS-8282 | [Prod][AWS][legacy-web] Student profile save overflows adrCodPostal because postal length is not validated - 2 errors/72h | 2026-07-24 10:04 | Bug | Done | High | Marian Andrei | Team 1 | MRs: !2654+2 / -2 (net +0) across 1 commit(s) | |
| ADS-8283 | [Cazari] - Sold gresit in obligatie de plata fata de fisa studentului | 2026-07-20 13:55 | Bug | Done | High | - | Ionut Ciolan | University | Notes only |
| ADS-8316 | [Prod][Billing/Frontend] Groups Marks hides eligible services beyond first 100 results | 2026-07-24 14:55 | Bug | Done | Highest | Dragoș Ivan | Team 2 | ||
| ADS-8322 | [FE/BE][Burse][Atribute] - Coloanele pentru atributele custom - hardcoded | 2026-07-31 14:29 | Bug | Done | High | - | Dana-Mihaela Marițca | University | MRs: !2040+47 / -75 (net -28) across 1 commit(s) |
Churn cards are deduplicated by MR/commit; row evidence can repeat the same MR when it is linked to multiple Jira items. Evidence split: MR-backed + Direct commits + Jira-only = Total; Carryovers are a subset. Scope split: Product Delivery + Infra = Total. Monday split uses the same row-level Monday visibility across Product Delivery and Infra; Trend Context then renders the split per lane.
| Key | Title | Time | Type | Status | Priority | Scope | Monday | People | Work Stream | Evidence |
|---|---|---|---|---|---|---|---|---|---|---|
| ADS-6064 | [Internal] Export Clienti Adservio din Billing pentru import in Nexus | 2026-07-24 10:04 | Task | Done | High | Product Delivery | Outside Monday | George Murgoci | Team 2 | |
| ADS-6545 | [SDK] Implementare v1 layer comunicare native-web *post message bridge | 2026-07-21 18:12 | Story | Done | Medium | Product Delivery | Outside Monday | Stefan Musat, Ioana Ivan +1 | Team 1 | |
| ADS-6568 | [FE] - Director dashboard graph update | 2026-07-24 10:04 | Improvement | Done | Medium | Product Delivery | Outside Monday | Pavel Petronel | Team 1 | MRs: !2025 |
| ADS-6694 | [MOB] - Test parenting | 2026-08-07 08:12 | Story | Done | Highest | Product Delivery | Monday | Dragoș Ivan, Marian Andrei +3 | Mobile | MRs: !2645 |
| ADS-7149 | [FE][Cazari] - Config structura UI Responsive | 2026-07-21 17:19 | Story | Done | Medium | Product Delivery | Monday | Iuliana Gugeanu | Team 2 | MRs: !1714 |
| ADS-7164 | [FE][Cazari] -Taxe UI Responsive | 2026-07-21 17:19 | Story | Done | Medium | Product Delivery | Monday | Iuliana Gugeanu | Team 2 | MRs: !1810 |
| ADS-7343 | [Stiri] - Distribuie Updates | 2026-07-24 16:02 | Task | Done | Highest | Product Delivery | Monday | Alexandru Murarescu, Catalin Cojan +2 | Team 2 | |
| ADS-7475 | [UNI][MAIN][Plan invatamant] - Teste automate Fisa disciplinei E2E | 2026-07-21 17:52 | Story | Done | Medium | Product Delivery | Outside Monday | Dana-Mihaela Marițca | University | |
| ADS-7495 | [FE/BE][Adeverinte absolvire] - Creare Probe evaluare | 2026-07-22 10:21 | Story | Done | Medium | Product Delivery | Monday | Ionut Ciolan, Andrei Alexandru +1 | University | MRs: !2001 |
| ADS-7496 | [FE/BE][Adeverinte absolvire] - Probe&medie pe situatie scolara | 2026-07-22 10:21 | Story | Done | Medium | Product Delivery | Monday | Ionut Ciolan, Andrei Alexandru +1 | University | |
| ADS-7884 | [MOB] - Web bridge SDK | 2026-07-21 12:40 | Story | Done | Medium | Product Delivery | Monday | Stefan Musat | Mobile | Notes only |
| ADS-7890 | [BE PHP][Cazari] - Stingerea obligatiilor din E-taxe | 2026-07-20 10:05 | Story | Done | Medium | Product Delivery | Monday | Ionut Ciolan | University | Notes only |
| ADS-7896 | Migrare documente S3 | 2026-07-21 18:13 | Story | Done | Medium | Infra | Monday | Catalin Cojan, Edgar Alexa | Team 2 | |
| ADS-7958 | [FE/BE] - Reconstituire scolaritate - transfer, an repetare | 2026-07-22 10:21 | Story | Done | High | Product Delivery | Monday | Andrei Alexandru, Stefan Achim | University | |
| ADS-7993 | [FE]: Fix Automation tests 22/06/2026 | 2026-07-21 18:13 | Task | Done | Medium | Product Delivery | Outside Monday | Ioana Ivan | Not recorded | MRs: !1946 |
| ADS-8055 | [Asachi][FE] - Salvarea pe cataloage sa se faca pe toate paginile nu pe fiecare pagina in parte | 2026-07-22 10:21 | Story | Done | Medium | Product Delivery | Outside Monday | Iuliana Gugeanu | University | MRs: !2022 |
| ADS-8073 | [FE/BE] - Aducerea titularilor din planul curent in tab-ul restantieri pe disciplina | 2026-07-22 10:21 | Task | Done | High | Product Delivery | Monday | Iuliana Gugeanu, Andrei Alexandru | University | Notes only |
| ADS-8104 | [BE-PHP] - Gestiunea cazarilor de vara | 2026-07-22 10:21 | Story | Done | High | Product Delivery | Monday | Ionut Ciolan | University | MRs: !73 |
| ADS-8105 | Impartirea pe module | 2026-08-07 08:12 | Story | Done | Medium | Product Delivery | Monday | Cosmin Olaru, Ioana Ivan +3 | Team 1 | |
| ADS-8141 | [FE][Situatie scolara] - Lipsa mesaj de eroare la modificarea mediei de absolvire | 2026-07-22 10:21 | Task | Done | Medium | Product Delivery | Outside Monday | Stefan Achim | University | MRs: !2028 |
| ADS-8188 | Extindere import studenti cu coloana sectie | 2026-07-22 10:21 | Task | Done | High | Product Delivery | Outside Monday | Andrei Alexandru | University | MRs: !231 |
| ADS-8205 | [FE]: Modificari rute pentru Mobile | 2026-07-24 10:04 | Task | Done | Medium | Product Delivery | Outside Monday | Ioana Ivan | Team 1 | MRs: !2003 |
| ADS-8247 | [Admitere] - In lista de candidati trebuie sa fie afisat intai numele si apoi prenumele | 2026-07-24 14:55 | Improvement | Done | High | Product Delivery | Outside Monday | George Murgoci | Team 2 | |
| ADS-8251 | Warning - TraefikServiceHighLatency adservio-production-admission-api | 2026-07-28 10:40 | Story | Done | Medium | Infra | Outside Monday | Rojan Shrestha | Not recorded | |
| ADS-8262 | [FE] Responsive conduită / listă elevi | 2026-07-24 10:04 | Story | Done | Medium | Product Delivery | Outside Monday | Pavel Petronel | Team 1 | MRs: !2646 |
| ADS-8266 | Investigate/evaluate current alerts on based of volumes vs the hits and update the alerts. | 2026-07-28 10:40 | Story | Done | Medium | Infra | Outside Monday | Rojan Shrestha | Not recorded | |
| ADS-8270 | Create new DB / users and them import the manually created superset user on production | 2026-07-21 08:59 | Story | Done | Medium | Infra | Outside Monday | Rojan Shrestha | Not recorded | Notes only |
| ADS-8274 | Could you take a quick look at the `uni-php-fpm-laravel` container on dev, namespace `main`? Seems to be having some issues. It's a new module that just got merged into main and needs to get release-ready, but the person who worked on it is out today. | 2026-07-21 09:00 | Story | Done | Medium | Infra | Outside Monday | Rojan Shrestha | Not recorded | MRs: !316 |
| ADS-8308 | Nota si media corigenta | 2026-07-23 13:00 | Improvement | Done | Urgent | Product Delivery | Outside Monday | Andrei Dragan | Team 1 | Notes only |
| ADS-8319 | [Abonamente] - Rambursare 2969809 | 2026-07-24 11:46 | Task | Done | Urgent | Product Delivery | Outside Monday | Dragoș Ivan | Team 2 | Notes only |
Merged GitLab work that could not be tied to a resolved Jira ticket. Deploy, incident, and infra signals stay in Ops.
| Title | Time | Kind | People | Details |
|---|---|---|---|---|
No Jira ticket | 07-23 14:20 | Non-JiraMergedNo Jira ticket | VP, Valentin Pal | Jira ticket: No Jira ticket shown as GitLab-only work Window churn: +13 / -14 (net -1) across 3 commit(s) MRs: !2032 — Valentin Pal (3 commits) [+13 / -14 (net -1)] Notes: Merged in GitLab during the report window without an ADS ticket key. |
No Jira ticket | 07-21 18:21 | Non-JiraMergedNo Jira ticket | Andrei Alexandru | Jira ticket: No Jira ticket shown as GitLab-only work Window churn: +8 / -6 (net +2) across 3 commit(s) MRs: !325 — Andrei Alexandru (3 commits) [+8 / -6 (net +2)] Notes: Merged in GitLab during the report window without an ADS ticket key. |
This tab is reserved for deployment evidence. GitLab production deploy jobs are the source of truth, with Slack deploy messages attached as corroborating evidence when available.
| Title | Time | Kind | People |
|---|---|---|---|
| 2026-07-24 16:21 | GitLab DeploySuccess | Dragoș Ivan | |
| 2026-07-24 14:55 | GitLab DeploySuccess | Dragoș Ivan | |
| 2026-07-24 10:03 | GitLab DeploySuccess | Dragoș Ivan | |
| 2026-07-23 22:01 | GitLab DeploySuccess | Daniel Onisoru | |
| 2026-07-21 15:12 | GitLab DeploySuccess | Marian Andrei | |
| 2026-07-20 15:34 | GitLab DeploySuccess | Rojan Shrestha | |
| 2026-07-20 14:44 | GitLab DeploySuccess | Rojan Shrestha | |
| 2026-07-20 11:54 | GitLab DeploySuccess | Rojan Shrestha |
This tab does not include every Slack warning. We check readable messages from #dezvoltare, #infra, #major-incident, #devops, and #devleads, then keep only messages classified as incident or infra signals. Messages with an ADS-XXXX key are attached back to the matching Jira/GitLab item instead of being duplicated here. Deploy messages are kept in the separate Deployments tab only when they match a GitLab production deployment, test-result chatter is ignored, very short generic infra messages are ignored, and repeated alerts pushed in succession with the same channel/category/summary are collapsed into one signal.
| Title | Time | Kind | People | Details |
|---|---|---|---|---|
| 2026-07-25 05:26 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-25 04:41 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-25 00:11 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-24 22:59 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-24 19:44 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-24 17:27 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-24 16:59 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-24 16:54 | Slack IncidentObserved | Rojan Shrestha | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-24 16:53 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-24 16:49 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-24 16:48 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-24 16:47 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-23 19:51 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-23 19:46 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-23 16:47 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-23 16:37 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-21 16:25 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-21 16:20 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-21 13:30 | Slack IncidentObserved | Rojan Shrestha | Notes: Observed in Slack channel #devops during the report window. | |
| 2026-07-21 09:40 | Slack IncidentObserved | Rojan Shrestha | Notes: Observed in Slack channel #devops during the report window. | |
| 2026-07-20 14:43 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-20 14:38 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-20 09:34 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-20 09:29 | Slack IncidentObserved | - | Notes: Observed in Slack channel #_alerts_prod during the report window. | |
| 2026-07-19 16:41 | Slack IncidentObserved | - | Notes: Observed in Slack channel #infra during the report window. | |
| 2026-07-23 22:15 | Slack InfraObserved | Daniel Onisoru | Notes: Observed in Slack channel #dezvoltare during the report window. | |
| 2026-07-21 18:39 | Slack InfraObserved | Andrei Alexandru | Notes: Observed in Slack channel #dezvoltare during the report window. | |
| 2026-07-21 15:09 | Slack InfraObserved | Marian Andrei | Notes: Observed in Slack channel #dezvoltare during the report window. | |
| 2026-07-21 11:59 | Slack InfraObserved | Rojan Shrestha | Notes: Observed in Slack channel #devops during the report window. |
Raw GitLab audit: +7863 / -1328 (net +6535) across 48 commit(s) across 14 distinct MR(s).
| Key | Title | Type | Status | Priority | Focus | People | Work Stream | Evidence |
|---|---|---|---|---|---|---|---|---|
| ADS-3578 | Sentry - Oprire aplicatie selectiv pe tip de user | Epic | In Progress | Low | Daniel Onisoru | Not recorded | Notes only | |
| ADS-6142 | [Registre Matricole] -US1.1 Creare volume si asociere studenti incadrati | Story | Done | High | Stefan Achim, Catalin Cojan +1 | University | MRs: !2041+1570 / -7 (net +1563) across 1 commit(s) | |
| ADS-6159 | Notification Center for Mobile | Story | In Progress | High | Dragoș Ivan | Team 2 | MRs: !10+1920 / -295 (net +1625) across 4 commit(s) | |
| ADS-6675 | [Financiar] - Managementul penalitatilor | Story | Done | High | Edgar Alexa, George Murgoci +1 | Team 2 | MRs: !2034+485 / -154 (net +331) across 4 commit(s) | |
| ADS-7534 | [FE/BE][Adeverinte absolvire] - Flow generare adeverinte | Story | Done | Medium | Stefan Achim, Ionut Ciolan +1 | University | MRs: !1980+411 / -180 (net +231) across 10 commit(s) | |
| ADS-7535 | [FE] - Download Adeverinta de absolvire | Story | Done | Medium | Stefan Achim, Ionut Ciolan | University | MRs: !2000+252 / -82 (net +170) across 4 commit(s) | |
| ADS-7778 | [ANMGD] - Onboarding Academia Nationala de Muzica "Gheorghe Dima" - Cluj-Napoca | Story | In Progress | Medium | Andrei Alexandru | University | Notes only | |
| ADS-7816 | [SIIIR] - Import clase | Story | In Progress | Medium | Cosmin Olaru, Ioana Ivan +1 | Team 1 | MRs: !2644+150 / -28 (net +122) across 1 commit(s) | |
| ADS-7849 | Stergere date S3 | Story | To Do | Medium | Catalin Cojan | Team 2 | MRs: !2653+487 / -0 (net +487) across 1 commit(s) | |
| ADS-7941 | Incident management process optimization and Alert recovery notifications / Pagerduty | Story | To Do | Medium | Rojan Shrestha | Not recorded | MRs: !317 | |
| ADS-8067 | [Incadrare] Refactoring React & API | Story | Testing | High | Andrei Dragan, Razvan Antoci +1 | Team 1 | MRs: !2651+1914 / -50 (net +1864) across 7 commit(s) | |
| ADS-8073 | [FE/BE] - Aducerea titularilor din planul curent in tab-ul restantieri pe disciplina | Task | Done | High | Andrei Alexandru, Iuliana Gugeanu +2 | University | ||
| ADS-8105 | Impartirea pe module | Story | Done | Medium | Cosmin Olaru, Ioana Ivan +3 | Team 1 | MRs: !2031+841 / -563 (net +278) across 14 commit(s) | |
| ADS-8153 | [Prod][TUIASI][accommodations-api] Student balance export returns HTTP 500 when mPDF hits pcre.backtrack_limit | Bug | To Do | Highest | Andrei Alexandru | University | MRs: !75 | |
| ADS-8296 | Production Web Rollout - Critical Alert RCA | Story | Canceled | Medium | Rojan Shrestha | Not recorded | MRs: !323+1 / -3 (net -2) across 1 commit(s) |
Recovered commit activity, including closed experiments. These entries do not add delivered items, active WIP, capacity or effort/load points.
| Key | Title | Type | Status | Priority | Focus | People | Work Stream | Evidence |
|---|---|---|---|---|---|---|---|---|
| No ticket | [ADS-8310] Preserve admin school context with incomplete geography | Code activity | Code activity; outcome tracked separately | Codex | Not recorded | MRs: !2657+153 / -134 (net +19) across 3 commit(s) | ||
| No ticket | Draft: [ADS-8316] Compose Billing and Frontend MR images | Code activity | Code activity; outcome tracked separately | Codex | Not recorded | MRs: !327+4 / -4 (net +0) across 4 commit(s) | ||
| No ticket | Draft: test: isolate Grade CRUD deletion target | Code activity | Code activity; outcome tracked separately | Codex | Not recorded | MRs: !1992+18 / -81 (net -63) across 2 commit(s) | ||
| No ticket | test: stabilize series study year selection | Code activity | Code activity; outcome tracked separately | Codex | Not recorded | MRs: !2008+43 / -5 (net +38) across 2 commit(s) | ||
| No ticket | Draft: test: own Annual Subject closure fixture lifecycle | Code activity | Code activity; outcome tracked separately | Codex | Not recorded | MRs: !2030+73 / -17 (net +56) across 1 commit(s) | ||
| No ticket | [ADS-7388] Harden gradebook stale references | Code activity | Code activity; outcome tracked separately | Codex | Not recorded | MRs: !140+195 / -92 (net +103) across 1 commit(s) | ||
| No ticket | [ADS-8186] Fix external person fallback faculty create | Code activity | Code activity; outcome tracked separately | Codex | Not recorded | MRs: !74+314 / -47 (net +267) across 1 commit(s) |
| Total completed | 48 |
| Bugs | 16 |
| Delivery | 30 |
| Other work (GitLab only) | 2 |
| Ops signals | 29 |
| WIP | 15 |
| Incidents | 25 |
| Done work commits | 41 |
| MRs merged this week | |
| Historical merged MR evidence | |
| MR evidence open at cutoff | |
| Linked MR evidence | 91 |
| Done work linked MR evidence | 70 |
| WIP commits | 48 |
| WIP linked MR evidence | 14 |
| Code churn | +12070-2695Net+9375 |
| Raw code churn | +12082-2707Net+9375 |
| Filter fallback commits | 0 |
| Reliability warnings | 0 |
This total is not “new code shipped.” It is filtered in-window GitLab churn across completed work, WIP, non-ticketed GitLab work, and separately tracked direct repo activity, after excluding non-delivery config/tooling noise, multi-parent merge commits, squash commits, and deduplicating direct repo fallback commits that were already counted elsewhere in the report.
Direct repo activity is GitLab work captured from configured fallback repositories when it could not be mapped safely back to Jira items, so it is tracked separately instead of being folded into Bugs, Delivery, Other Work, or WIP.
Churn is calculated from filtered GitLab commit stats for commits inside the report window, across merged MRs, prior-merge carryovers, and open-MR WIP.
We use in-window commit activity instead of full MR size so older merges or long-running branches do not overstate weekly work. Multi-parent merge commits and squash commits are excluded, and direct repo fallback commits are deduplicated when the same commit was already counted through MR-backed or ticket-mapped evidence. Jira-only items without GitLab evidence stay at 0 churn.
Filtered churn excludes obvious non-delivery file noise such as CI/workflow files, formatter/lint/editor configs, TypeScript/build/CLI configs, env templates, hooks, lockfiles, and generated migration snapshot files. Runtime-impacting files like Dockerfile, mikro-orm.config.ts, real migrations, and app code remain counted.
Raw GitLab Churn Audit: +12082 / -2707 (net +9375) across 117 commit(s) across 91 distinct MR(s).
References: GitLab merge request commits API and GitLab commit stats API.
| Person | Role | Completed | Bugs | Delivery | Other | Ops | WIP | Code churn | Notes |
|---|---|---|---|---|---|---|---|---|---|
| Alexandru Murarescu | Mid Full Stack Developer (React, Node) | 1 | 0 | 1 | 0 | 0 | 0 | +0-0Net+0 | |
| Andrei Alexandru | Senior Backend Java | 9 | 3 | 5 | 1 | 1 | 5 | +63-38Net+25 | |
| Andrei Dragan | Senior Backend PHP | 1 | 0 | 1 | 0 | 0 | 1 | +1914-50Net+1864 | |
| Catalin Cojan | Senior Backend PHP | 3 | 1 | 2 | 0 | 0 | 2 | +1142-37Net+1105 | |
| Cosmin Olaru | Senior Manual QA | 2 | 0 | 2 | 0 | 0 | 2 | +0-0Net+0 | |
| Dana-Mihaela Marițca | Junior Front End Developer | 2 | 1 | 1 | 0 | 0 | 1 | +62-78Net-16 | |
| Daniel Onisoru | Architect | 0 | 0 | 0 | 0 | 1 | 1 | +0-0Net+0 | |
| Dragoș Ivan | Senior Front End Developer (React) | 4 | 1 | 3 | 0 | 0 | 1 | +1920-295Net+1625 | |
| Edgar Alexa | Mid Full Stack Developer (React, Node) | 1 | 0 | 1 | 0 | 0 | 1 | +0-0Net+0 | |
| George Murgoci | Mid Full Stack Developer (React, Node) | 2 | 0 | 2 | 0 | 0 | 1 | +628-189Net+439 | |
| Ioana Ivan | Mid Front End Developer (React) | 4 | 0 | 4 | 0 | 0 | 2 | +898-626Net+272 | |
| Ionut Ciolan | Senior Backend PHP | 6 | 2 | 4 | 0 | 0 | 2 | +0-0Net+0 | |
| Iuliana Gugeanu | Junior Front End Developer | 4 | 0 | 4 | 0 | 0 | 1 | +2-1Net+1 | |
| Marian Andrei | Senior Backend Developer | 4 | 2 | 2 | 0 | 1 | 2 | +157-38Net+119 | |
| Paul Bostan | Senior Manual QA | 1 | 0 | 1 | 0 | 0 | 1 | +0-0Net+0 | |
| Pavel Petronel | Front End Developer (React) | 7 | 4 | 3 | 0 | 0 | 1 | +0-0Net+0 | |
| Razvan Antoci | Junior-Mid Manual QA | 0 | 0 | 0 | 0 | 0 | 1 | +0-0Net+0 | |
| Rojan Shrestha | DevOps/SRE Engineer | 5 | 1 | 4 | 0 | 4 | 2 | +37-20Net+17 | |
| Stefan Achim | Mid-Sen Full Stack Developer (Front End React, Backend Node) | 4 | 0 | 4 | 0 | 0 | 4 | +1981-187Net+1794 | |
| Stefan Agrigo | Junior Mobile Developer | 2 | 0 | 2 | 0 | 0 | 1 | +1534-464Net+1070 | Unmapped repo activity: +1534 / -464 (net +1070) across 11 commit(s) |
| Stefan Musat | Senior Mobile Developer | 5 | 1 | 4 | 0 | 0 | 1 | +763-251Net+512 | Unmapped repo activity: +763 / -251 (net +512) across 6 commit(s) |
| Codex | AI contributor | 4 | 3 | 0 | 1 | 0 | 1 | +969-421Net+548 | Codex combines explicitly marked Codex work with VP and Valentin Pal, as requested. Shared commits and work items count once within this category. Original authors remain in the source evidence. This grouping does not assert that every change from those accounts was AI-authored. Bugs merely reported by Codex are not code contributions. No fixed human capacity is assigned to Codex. |
Visible delivery shows 48 completed item(s) (16 bugs, 30 delivery items, 2 non-ticketed GitLab items) and 15 in-progress item(s), with WIP intentionally preserved from open MR commit activity and Jira-only active tickets, completed scope also including Jira-closed carryovers and Jira-only closures with explicit evidence notes, and Slack correlation layered on where channel access allowed it.