Adservio Team Report

Readable export generated from the normalized team report data. Exact window: Sat, Oct 24 07:00 to Sat, Oct 31 07:00. Use the tabs below to jump between sections.

Period
Oct 24 to Oct 31
Team scope
Configured engineering roster
Related reportsExplore delivery context and related reports.

Overview

Completed116
Bugs45
Delivery63
Other Work8
Ops Signals4
WIP62
Deploys16
Incidents1
MRs merged this week84
Historical merged MR evidence105
MR evidence open at cutoff46

Filtered GitLab Churn In Window

Raw GitLab Churn Audit

+50874 / -14726 (net +36148) across 505 commit(s) across 235 distinct MR(s).

Filtered churn excludes 8 raw-only commit(s) whose changed files were filtered out as non-delivery noise.

Code churn uses in-window commits. Linked MR evidence also includes earlier merges; it is not weekly merge throughput.

Code churn+49426-13794+35632
Commits497
Linked MR evidence235

Done Work GitLab Evidence

Bugs, Delivery, and Other Work with GitLab evidence.

Code churn+10919-4640+6279
Commits301
Linked MR evidence187

WIP GitLab Evidence

Work in Progress with GitLab evidence.

Code churn+34543-8659+25884
Commits195
Linked MR evidence48

Filtered total includes 11 direct repo activity commit(s), so 497 = 301 done + 195 WIP + 11 direct repo activity + 1 recovered code activity.

Delivery Overview

Completed delivery counts use the same denominator as the Delivery tab.

Total Delivery63
Product Delivery38
Infra25
MR-backed49
Direct commits0
Jira-only14
Carryovers31
Monday6
Outside Monday57

Type

Task43Story15Improvement5

Status

Done58Merged5

Weekly effort · Q3 model

Stories and Improvements only: 50 × (weekly changed lines / 10,000)^0.75 + 35 × (elapsed Romanian business days / 20)^0.75 + 15 × √(dated participants / 4). Done counts evidence within this week; active WIP stops at the cutoff. These are index points, not hours or capacity days.

Exact / range / limited counts disclose input coverage. Ranges use frozen Q3 calibration; limited-evidence issues are visible but omitted from numeric subtotals. Bugs, Tasks, ticketless and other work keep a separate, unchanged activity index. Neither index is added to the other. Combined effort deduplicates issue appearances and must not be calculated by adding the Done and WIP scores.

ActivityBucketStory/Improvement effortExact / range / limitedOther activity index
DoneMonday.com118.44 / 0 / 011
DoneOutside Monday.com187.5–209.510 / 2 / 0224
DoneBugs00 / 0 / 0246
WIPMonday.com215.86 / 0 / 411
WIPOutside Monday.com267.9–401.94 / 6 / 4192
WIPBugs00 / 0 / 0123
WIP + Done (unique issues)Monday.com309.59 / 0 / 422
WIP + Done (unique issues)Outside Monday.com419.3–574.313 / 8 / 4416
WIP + Done (unique issues)Bugs00 / 0 / 0369
Done Story/Improvement inputs and issue evidence
IssueCoverageWeekly linesWeekday fractionsDated participantsQ3 index
ADS-4184 · [Financiar] - Integrare cu grupuriScore0.00.00017.5
ADS-4641 · Raport - Situatia privind Rezultatele obtinuteScore1248.02.380228.2
ADS-6013 · Deschidere pagina nativa de adăugare absenta din catalogScore0.00.00017.5
ADS-6326 · [Vacante][Calendar][Condica] - Vacante pe ani de studiu + Calcul corect săptămâna pară/imparăScore0.00.00017.5
ADS-7111 · Conturi parinti active/inactiveScore0.00.00017.5
ADS-7354 · [Abonamente] - Gestionare recurență pachete anualeScore3583.04.856245.9
ADS-7557 · investigate the Prometheus metric collection because it doesn't align with Loki countsScore0.04.872119.6
ADS-8164 · [Burse] - US6 - RapoarteScore131.04.407223.8
ADS-8265 · Replace billing-cycle deep check with targeted alertsScore0.04.872119.6
ADS-8404 · [Elev][Parinte] - Redesign - RapoarteScore0.04.872119.6
ADS-8581 · Statistici - Distribuția elevilor pe intervale de medii - Top eleviScore5548.04.671458.9
ADS-8584 · [Asachi]-Adaugare ,,Status student" in Clasamentul studentilor din modulul Statistici si rapoarteScore139.04.632224.3
ADS-8627 · CRITICAL [prod] - DeploymentZeroAvailableReplicasRange0.0Unavailable19–20
ADS-8630 · Deployment adservio-production/notifications-sync-events-worker has zero available replicasRange0.0Unavailable19–20
ADS-9188 · Numele universitatii contine ghilimele in documentele decarcateScore36.00.01818.4
ADS-9414 · Imbunatatiri widget rezumat AIScore138.00.00919.6

Trend Context

Last available weekly delivery, test, and alert context. Missing report weeks stay visible as gaps.

Open dashboard
Metric definitions and examples
  • Strict load

    Source-backed implementation load for the week: strict delivered outcomes plus active WIP items. It is broader than Done-only output because open WIP can consume engineering capacity before it closes.

    Example: 10 strict delivered outcomes plus 4 active WIP items means 14 strict load items; a closure-only Done row with no Jira active-flow and no GitLab code, MR, or commit evidence is excluded.

  • WIP + Done code touch

    Added plus deleted lines from source-backed Done items plus active WIP rows, grouped by Monday roadmap, Outside Monday, and Bugs.

    Example: 600 Done lines and 400 WIP lines in Monday roadmap means 1,000 WIP + Done code touch for Monday.

  • WIP code touch

    Open WIP only. Sums added plus deleted lines on active WIP rows by planning bucket.

    Example: an In Progress story with +900 / -100 contributes 1,000 WIP code touch before it closes.

  • Done code touch

    Done items only. Sums added plus deleted lines from source-backed delivered rows in the report week.

    Example: two completed bug fixes with +50 / -10 and +20 / -5 contribute 85 Done code touch.

  • WIP + Done item-count

    Strict load item count: Done items that have implementation evidence plus active WIP items.

    Example: 10 Done items plus 4 active WIP items means 14 WIP + Done items.

  • WIP item-count

    Open WIP item count from the report's WIP tab, grouped into Monday roadmap, Outside Monday, and Bugs.

    Example: 3 In Progress stories and 1 Code Review bug produce 4 WIP items across their buckets.

  • Done item-count

    Delivered or closed items only, after removing rows that lack Jira active-flow and GitLab implementation evidence.

    Example: 12 Jira closures minus 3 no-code change rows means 9 Done items.

  • WIP + Done effort

    Q3 relative effort for Stories and Improvements only, deduplicating issue appearances across Done and WIP.

    50 × (weekly lines / 10000)^0.75 + 35 × (elapsed Romanian business days / 20)^0.75 + 15 × sqrt(dated participants / 4). Lower/upper bounds retain input uncertainty; limited evidence is disclosed separately.

  • WIP effort

    The same Q3 model for active Stories and Improvements, with evidenced open delivery episodes bounded by the weekly cutoff.

    This is an index, not hours or capacity days. Bugs, Tasks and ticketless work use a separate activity index.

  • Done effort

    The same Q3 model using evidence inside this canonical week for eligible completed Stories and Improvements.

    Original type/code/commit/MR activity rules remain unchanged for other work. Different indices are never added together.

  • Other activity index

    Bugs, Tasks, ticketless and other non-Story/Improvement work retain the existing type/code/commit/MR bands.

    WIP rows add +2. This unchanged activity index is kept separate from Q3 Story/Improvement effort and from capacity days.

  • No code change items

    Rows visible in closure volume but excluded from implementation load because they have neither active Jira flow nor GitLab code, MR, or commit evidence.

    Example: a Jira ticket moved Done during the week with no active-flow or code evidence lands here instead of in load.

Loading trend context...

Finalyear Bugs This Week

This-week added and solved finalyear bug counts.

Open final year report

Loading readiness data...

Codex Bugs This Week

This-week added and solved Codex-reported bug counts.

Open Codex bugs report

Loading Codex bugs data...

Bug Priority Counts

Urgent6Highest9High15Medium13Unspecified2focus0

Overall Verdict

Visible delivery shows 116 completed item(s) (45 bugs, 63 delivery items, 8 non-ticketed GitLab items) and 62 in-progress item(s), with WIP intentionally preserved from open MR commit activity and Jira-only active tickets, completed scope also including Jira-closed carryovers and Jira-only closures with explicit evidence notes, and Slack correlation layered on where channel access allowed it.

Top Notes

  • 2 merged GitLab MR(s) in the window had no ADS ticket key but matched a bug-fix title pattern, so they were included under Bugs as GitLab-only bugfix work.
  • 8 merged GitLab MR(s) in the window had no ADS ticket key and were included under non-ticketed GitLab work.
  • 2 open GitLab MR(s) with in-period commits had no ADS ticket key and were included as unticketed GitLab WIP.
  • GitLab deploy evidence added 16 successful production deploy item(s).
  • Slack evidence was unavailable for: #major-incident, #devleads.

Release Notes: Bugs

Bug snapshot

Raw GitLab audit: +1331 / -533 (net +798) across 66 commit(s) across 61 distinct MR(s).

Total45
+Lines1312
-Lines520
Net792
Commits61
Linked MR evidence61
Priority
Urgent6Highest9High15Medium13Unspecified2
KeyTitleTimeTypeStatusPriorityTagsPeopleWork StreamEvidence
No Jira ticketHeader faculty name fix2026-10-26 11:02GitLab BugfixMerged-George MurgociNot recorded
No Jira ticketMRs: !2245+11 / -8 (net +3) across 2 commit(s)
No Jira ticketheader-faculty-name-fix2026-10-26 10:23GitLab BugfixMerged-George MurgociNot recorded
No Jira ticketMRs: !2244+6 / -6 (net +0) across 1 commit(s)
ADS-1143[Transfers]-The student transferred in the year 2023-2024 disappears from the last year's class module2026-10-30 20:34BugDoneUrgent-Andrei DraganNot recorded
MRs: !1515
ADS-1723[Students] - Advanced search issues due to filters2026-10-30 20:34BugDoneMedium-Andrei Dragan, Razvan AntociNot recorded
Notes only
ADS-4194[Documents][BE] - Eroare la generarea adeverinței pentru elevii din școlile noi din rolul de director/secretar2026-10-30 20:34BugDoneHighest-Catalin CojanNot recorded
MRs: !1943
ADS-4215[Documents][FE] - Transferurile adăugate pentru anul școlar curent(2024-2025) afectează catalogul PDF al anului școlar anterior(2023-2024)2026-10-30 20:34BugDoneHighest-Dron Gabriel, Ionut CiolanNot recorded
MRs: !1937
ADS-6552[BE -JAVA] - Eroare atunci cand vrei sa importi notele2026-10-30 20:54BugDoneHigh-Andrei Alexandru, Ioana IvanNot recorded
MRs: !1576
ADS-6603[FE] - Cannot edit session basic info2026-10-30 20:54BugDoneMedium-George MurgociNot recorded
MRs: !1591
ADS-7440[FE/BE] - Cannot view sessions with status !==Draft2026-10-30 20:54BugDoneMedium-George MurgociTeam 1
MRs: !132, !1760
ADS-8032[Prod][AWS][legacy-web] Staff attendance sync returns 500 when activity arrays reach strtotime - 51 errors/72h2026-10-30 20:33BugDoneHighestCodexIonut CiolanTeam 1
MRs: !2600
ADS-8173docgen2-api: Gradebook 2022 view returns HTTP 500 after downstream class lookup is forbidden2026-10-30 20:55BugDoneHighestCodexPavel PetronelTeam 1
MRs: !152
ADS-8515[FE] Preferinte notificari divider2026-10-30 20:55BugDoneMedium-Pavel PetronelTeam 1
MRs: !2079
ADS-8535[Prod][AWS][University] Add discipline sends string for localized disciplineName - 12 HTTP 400s/72h2026-10-30 13:08BugDoneHighestCodexAndrei AlexandruUniversity
Notes only
ADS-8647[Prod][AWS][FET generator] Transient RabbitMQ outage crashes all workers2026-10-30 20:55BugDoneHighestCodexIonut CiolanTeam 1
Notes only
ADS-8648[Prod][Alerting] FET/Rabbit outage is not paged and resolved pods appear as firing2026-10-30 20:55BugDoneHighestCodexRojan ShresthaPlatform
MRs: !428
ADS-8741[Prod] Loki and Tempo PVs filling after Sep 7 traffic doubling. Migrate observability block storage to S3 with zero data loss2026-10-26 13:43BugDoneMedium-Rojan ShresthaNot recorded
MRs: !464+3 / -3 (net +0) across 3 commit(s)
ADS-8750[Prod] service-fetgenerator crashes on unhandled TypeError when fet-cl reports a data validation error2026-10-30 20:55BugDoneUrgent-Ionut Ciolan, Rojan ShresthaNot recorded
MRs: !12
ADS-8778[Prod][FET generator] Unhandled ECONNRESET on the result POST crashes all workers and replays the job2026-10-30 20:55BugDoneUrgent-Ionut Ciolan, Rojan ShresthaTeam 1
Notes only
ADS-8800[Asachi] - Absent eronat pentru anul 2026-20272026-10-26 16:50BugDoneHigh-Andrei AlexandruUniversity
Notes only
ADS-8866[Asachi] - Problema echivalari2026-10-29 12:40BugDoneHigh-Andrei AlexandruUniversity
Notes only
ADS-8874[Prod][RDS] All 45 CloudWatch DB alarms stayed OK through a full production outage: thresholds and evaluation windows are not fit for purpose2026-10-30 20:55BugDoneHigh-Rojan ShresthaNot recorded
MRs: !92
ADS-8881[Asachi] - Eroare calculare credite2026-10-29 16:52BugDoneMedium-Andrei AlexandruUniversity
Notes only
ADS-8883[Asachi] - Eroare asignare titular curs/aplicatii la disciplina2026-10-29 17:07BugDoneMedium-Andrei AlexandruUniversity
Notes only
ADS-8972[Asachi] - Problema incheiere media anuala master2026-10-30 15:11BugDoneHigh-Andrei Alexandru, Stefan AchimUniversity
MRs: !279, !2257+378 / -43 (net +335) across 3 commit(s)
ADS-9004[TUIASI][Alerting] TraefikServiceHighLatency warning is noisy on uni-api while ADS-8912 is unresolved2026-10-30 20:55BugDoneHigh-Rojan ShresthaNot recorded
MRs: !433
ADS-9006[TUIASI][accommodations-api] Chronic elevated p95 (0.5-2s) and 243 5xx over 7 days, root cause not diagnosed2026-10-30 20:55BugDoneMedium-Ionut Ciolan, Rojan ShresthaNot recorded
MRs: !96
ADS-9038[BE] Conduita timestamp2026-10-30 20:55BugDoneMedium-Pavel PetronelNot recorded
MRs: !2820
ADS-9069Foto viewer: delete has no confirmation, no visible toaster, and no destructive styling2026-10-30 20:55BugDoneMedium-Daniel OnisoruNot recorded
MRs: !2189
ADS-9077[Prod][RDS] mysql-master storage-full shutdown again on 2026-10-01: raise allocated storage and cap online DDL, autoscaling cannot react to a 2.4 GiB/min fill2026-10-30 20:55BugDoneHigh-Rojan ShresthaPlatform
MRs: !97
ADS-9160[Prod][Alerting] Detect intermittent crashes across deployment replicas and page sustained availability loss2026-10-30 20:55BugDoneHighCodexRojan ShresthaPlatform
MRs: !454, !448
ADS-9228[Prod][OTel] otel-collector OOMKilled whenever Tempo restarts: retry queue is not bounded by the memory limiter2026-10-30 20:55BugDoneMedium-Rojan ShresthaNot recorded
MRs: !459
ADS-9237[FE] Calendar class select too long2026-10-30 20:55BugDoneMedium-Pavel PetronelTeam 1
MRs: !2224
ADS-9238[Dev][Review envs] /uni returns 503 in ads-7803 after the uni branch merged: env kept pinning the merged branch's image tag2026-10-26 11:10BugDoneMedium-Rojan ShresthaNot recorded
Notes only
ADS-9243[TUIASI][RCA] 16 Oct 08:53 UTC db.tuiasi.ro dropped connections, web worker pool froze, accommodations 69% 5xx for 22 min2026-10-27 09:00BugDoneHigh-Rojan ShresthaNot recorded
Notes only
ADS-9256[Prod][AWS][AI] Service p95 alert pools fast reads with synchronous summary generation2026-10-28 10:04BugDoneHighCodexRojan ShresthaTeam 2
MRs: !463+276 / -86 (net +190) across 3 commit(s)
ADS-9311[Asachi]: Note eronate2026-10-26 01:39BugDoneHigh-Andrei AlexandruUniversity
MRs: !278+261 / -6 (net +255) across 1 commit(s)
ADS-9314[MOB] taburile "dezvoltare personala" si "manuale" nu afiseaza continut2026-10-27 10:37BugDoneUrgent-Luiza HorlescuMobile
Notes only
ADS-9319[Prod][Docgen] Legacy ADST after token migration becomes report 500 instead of 4012026-10-30 13:16BugDoneHighCodexIoana IvanTeam 1
MRs: !185+199 / -209 (net -10) across 3 commit(s)
ADS-9329[Prod][Platform][Loki] storage-loki-0 reached 96.93% usage after sustained growth2026-10-28 10:04BugDoneHighCodexRojan ShresthaPlatform
MRs: !466+0 / -1 (net -1) across 1 commit(s)
ADS-9330[Security][Node.js] Apply October 2026 security updates and verify deployed runtimes2026-10-28 10:03BugDoneHighestCodexDragoș IvanTeam 2
MRs: !2247, !9, !2890 +22 more+52 / -45 (net +7) across 38 commit(s)
ADS-9331[Cazari] - Desincronizare numar studenti la afisarea ,,Cazati" fata de raportul ,,Situatii cazari pe camine".2026-10-30 14:07BugDoneHigh-Ionut CiolanUniversity
MRs: !99+85 / -70 (net +15) across 2 commit(s)
ADS-9346[FE] EROARE 500 la deschiderea catalogului PDF2026-10-28 10:04BugDoneHighest-Ioana IvanTeam 1
MRs: !187+8 / -3 (net +5) across 1 commit(s)
ADS-9374[Prod][AWS][Staff attendance] Failed activity insert returns HTTP 200 without saving2026-10-30 13:16BugDoneUrgentCodexIonut CiolanTeam 1
MRs: !2893+28 / -28 (net +0) across 2 commit(s)
ADS-9379[Dev] Nightly integration tests fail every night on test_web and test_frontend specs (masked by allow_failure), and every distributed dev kubeconfig has expired2026-10-29 14:05BugMergedHigh-Rojan ShresthaNot recorded
MRs: !471
ADS-9381[FE] dublarea orelor in orar in vizualizare specifica pe profesor2026-10-30 16:05BugDoneUrgent-Ioana IvanTeam 1
MRs: !2260+5 / -12 (net -7) across 1 commit(s)
Header faculty name fix
No Jira ticket · GitLab Bugfix · Merged · 2026-10-26 11:02 · George Murgoci
People: George Murgoci
Ticket state: No Jira ticket
Time: 2026-10-26 11:02
Type: GitLab Bugfix
Status: Merged
Tags: -
People: George Murgoci
Work Stream: Not recorded
Details: Jira ticket: No Jira ticket shown as GitLab-only work
Window churn: +11 / -8 (net +3) across 2 commit(s)
MRs: !2245 — George Murgoci (2 commits) [+11 / -8 (net +3)]
Notes: Merged in GitLab during the report window without an ADS ticket key.; Merged bug-fix work in GitLab without an associated Jira ticket.
header-faculty-name-fix
No Jira ticket · GitLab Bugfix · Merged · 2026-10-26 10:23 · George Murgoci
People: George Murgoci
Ticket state: No Jira ticket
Time: 2026-10-26 10:23
Type: GitLab Bugfix
Status: Merged
Tags: -
People: George Murgoci
Work Stream: Not recorded
Details: Jira ticket: No Jira ticket shown as GitLab-only work
Window churn: +6 / -6 (net +0) across 1 commit(s)
MRs: !2244 — George Murgoci (1 commits) [+6 / -6 (net +0)]
Notes: Merged in GitLab during the report window without an ADS ticket key.; Merged bug-fix work in GitLab without an associated Jira ticket.
ADS-1143
Bug · Done · Urgent · 2026-10-30 20:34 · Andrei Dragan
Item: ADS-1143
Title: [Transfers]-The student transferred in the year 2023-2024 disappears from the last year's class module
People: Andrei Dragan
Time: 2026-10-30 20:34
Type: Bug
Status: Done
Priority: Urgent
Tags: -
People: Andrei Dragan
Work Stream: Not recorded
Details: MRs: !1515 — Andrei Dragan
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-1723
Bug · Done · Medium · 2026-10-30 20:34 · Andrei Dragan, Razvan Antoci
Item: ADS-1723
Title: [Students] - Advanced search issues due to filters
People: Andrei Dragan, Razvan Antoci
Time: 2026-10-30 20:34
Type: Bug
Status: Done
Priority: Medium
Tags: -
People: Andrei Dragan, Razvan Antoci
Work Stream: Not recorded
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.
ADS-4194
Bug · Done · Highest · 2026-10-30 20:34 · Catalin Cojan
Item: ADS-4194
Title: [Documents][BE] - Eroare la generarea adeverinței pentru elevii din școlile noi din rolul de director/secretar
People: Catalin Cojan
Time: 2026-10-30 20:34
Type: Bug
Status: Done
Priority: Highest
Tags: -
People: Catalin Cojan
Work Stream: Not recorded
Details: MRs: !1943 — Catalin Cojan
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-4215
Bug · Done · Highest · 2026-10-30 20:34 · Dron Gabriel, Ionut Ciolan
Item: ADS-4215
Title: [Documents][FE] - Transferurile adăugate pentru anul școlar curent(2024-2025) afectează catalogul PDF al anului școlar anterior(2023-2024)
People: Dron Gabriel, Ionut Ciolan
Time: 2026-10-30 20:34
Type: Bug
Status: Done
Priority: Highest
Tags: -
People: Dron Gabriel, Ionut Ciolan
Work Stream: Not recorded
Details: MRs: !1937 — Ionut Ciolan
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-6552
Bug · Done · High · 2026-10-30 20:54 · Andrei Alexandru, Ioana Ivan
Item: ADS-6552
Title: [BE -JAVA] - Eroare atunci cand vrei sa importi notele
People: Andrei Alexandru, Ioana Ivan
Time: 2026-10-30 20:54
Type: Bug
Status: Done
Priority: High
Tags: -
People: Andrei Alexandru, Ioana Ivan
Work Stream: Not recorded
Details: MRs: !1576 — Ioana Ivan
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-6603
Bug · Done · Medium · 2026-10-30 20:54 · George Murgoci
Item: ADS-6603
Title: [FE] - Cannot edit session basic info
People: George Murgoci
Time: 2026-10-30 20:54
Type: Bug
Status: Done
Priority: Medium
Tags: -
People: George Murgoci
Work Stream: Not recorded
Details: MRs: !1591 — George Murgoci
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-7440
Bug · Done · Medium · 2026-10-30 20:54 · George Murgoci
Item: ADS-7440
Title: [FE/BE] - Cannot view sessions with status !==Draft
People: George Murgoci
Time: 2026-10-30 20:54
Type: Bug
Status: Done
Priority: Medium
Tags: -
People: George Murgoci
Work Stream: Team 1
Details: MRs: !132 — George Murgoci, !1760 — George Murgoci
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-8032
Bug · Done · Highest · 2026-10-30 20:33 · Ionut Ciolan
Item: ADS-8032
Title: [Prod][AWS][legacy-web] Staff attendance sync returns 500 when activity arrays reach strtotime - 51 errors/72h
People: Ionut Ciolan
Time: 2026-10-30 20:33
Type: Bug
Status: Done
Priority: Highest
Tags: Codex
People: Ionut Ciolan
Work Stream: Team 1
Details: MRs: !2600 — Ionut Ciolan
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-8173
Bug · Done · Highest · 2026-10-30 20:55 · Pavel Petronel
Item: ADS-8173
Title: docgen2-api: Gradebook 2022 view returns HTTP 500 after downstream class lookup is forbidden
People: Pavel Petronel
Time: 2026-10-30 20:55
Type: Bug
Status: Done
Priority: Highest
Tags: Codex
People: Pavel Petronel
Work Stream: Team 1
Details: MRs: !152 — Petronel Pavel
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-8515
Bug · Done · Medium · 2026-10-30 20:55 · Pavel Petronel
Item: ADS-8515
Title: [FE] Preferinte notificari divider
People: Pavel Petronel
Time: 2026-10-30 20:55
Type: Bug
Status: Done
Priority: Medium
Tags: -
People: Pavel Petronel
Work Stream: Team 1
Details: MRs: !2079 — Petronel Pavel
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-8535
Bug · Done · Highest · 2026-10-30 13:08 · Andrei Alexandru
Item: ADS-8535
Title: [Prod][AWS][University] Add discipline sends string for localized disciplineName - 12 HTTP 400s/72h
People: Andrei Alexandru
Time: 2026-10-30 13:08
Type: Bug
Status: Done
Priority: Highest
Tags: Codex
People: Andrei Alexandru
Work Stream: University
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.
ADS-8647
Bug · Done · Highest · 2026-10-30 20:55 · Ionut Ciolan
Item: ADS-8647
Title: [Prod][AWS][FET generator] Transient RabbitMQ outage crashes all workers
People: Ionut Ciolan
Time: 2026-10-30 20:55
Type: Bug
Status: Done
Priority: Highest
Tags: Codex
People: Ionut Ciolan
Work Stream: Team 1
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.
ADS-8648
Bug · Done · Highest · 2026-10-30 20:55 · Rojan Shrestha
Item: ADS-8648
Title: [Prod][Alerting] FET/Rabbit outage is not paged and resolved pods appear as firing
People: Rojan Shrestha
Time: 2026-10-30 20:55
Type: Bug
Status: Done
Priority: Highest
Tags: Codex
People: Rojan Shrestha
Work Stream: Platform
Details: MRs: !428 — Rojan Shrestha
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-8741
Bug · Done · Medium · 2026-10-26 13:43 · Rojan Shrestha
Item: ADS-8741
Title: [Prod] Loki and Tempo PVs filling after Sep 7 traffic doubling. Migrate observability block storage to S3 with zero data loss
People: Rojan Shrestha
Time: 2026-10-26 13:43
Type: Bug
Status: Done
Priority: Medium
Tags: -
People: Rojan Shrestha
Work Stream: Not recorded
Details: Window churn: +3 / -3 (net +0) across 3 commit(s)
MRs: !464 — Rojan Shrestha (3 commits) [+3 / -3 (net +0)]
ADS-8750
Bug · Done · Urgent · 2026-10-30 20:55 · Ionut Ciolan, Rojan Shrestha
Item: ADS-8750
Title: [Prod] service-fetgenerator crashes on unhandled TypeError when fet-cl reports a data validation error
People: Ionut Ciolan, Rojan Shrestha
Time: 2026-10-30 20:55
Type: Bug
Status: Done
Priority: Urgent
Tags: -
People: Ionut Ciolan, Rojan Shrestha
Work Stream: Not recorded
Details: MRs: !12 — Ionut Ciolan
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-8778
Bug · Done · Urgent · 2026-10-30 20:55 · Ionut Ciolan, Rojan Shrestha
Item: ADS-8778
Title: [Prod][FET generator] Unhandled ECONNRESET on the result POST crashes all workers and replays the job
People: Ionut Ciolan, Rojan Shrestha
Time: 2026-10-30 20:55
Type: Bug
Status: Done
Priority: Urgent
Tags: -
People: Ionut Ciolan, Rojan Shrestha
Work Stream: Team 1
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.
ADS-8800
Bug · Done · High · 2026-10-26 16:50 · Andrei Alexandru
Item: ADS-8800
Title: [Asachi] - Absent eronat pentru anul 2026-2027
People: Andrei Alexandru
Time: 2026-10-26 16:50
Type: Bug
Status: Done
Priority: High
Tags: -
People: Andrei Alexandru
Work Stream: University
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.
ADS-8866
Bug · Done · High · 2026-10-29 12:40 · Andrei Alexandru
Item: ADS-8866
Title: [Asachi] - Problema echivalari
People: Andrei Alexandru
Time: 2026-10-29 12:40
Type: Bug
Status: Done
Priority: High
Tags: -
People: Andrei Alexandru
Work Stream: University
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.
ADS-8874
Bug · Done · High · 2026-10-30 20:55 · Rojan Shrestha
Item: ADS-8874
Title: [Prod][RDS] All 45 CloudWatch DB alarms stayed OK through a full production outage: thresholds and evaluation windows are not fit for purpose
People: Rojan Shrestha
Time: 2026-10-30 20:55
Type: Bug
Status: Done
Priority: High
Tags: -
People: Rojan Shrestha
Work Stream: Not recorded
Details: MRs: !92 — Rojan Shrestha
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-8881
Bug · Done · Medium · 2026-10-29 16:52 · Andrei Alexandru
Item: ADS-8881
Title: [Asachi] - Eroare calculare credite
People: Andrei Alexandru
Time: 2026-10-29 16:52
Type: Bug
Status: Done
Priority: Medium
Tags: -
People: Andrei Alexandru
Work Stream: University
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.
ADS-8883
Bug · Done · Medium · 2026-10-29 17:07 · Andrei Alexandru
Item: ADS-8883
Title: [Asachi] - Eroare asignare titular curs/aplicatii la disciplina
People: Andrei Alexandru
Time: 2026-10-29 17:07
Type: Bug
Status: Done
Priority: Medium
Tags: -
People: Andrei Alexandru
Work Stream: University
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.
ADS-8972
Bug · Done · High · 2026-10-30 15:11 · Andrei Alexandru, Stefan Achim
Item: ADS-8972
Title: [Asachi] - Problema incheiere media anuala master
People: Andrei Alexandru, Stefan Achim
Time: 2026-10-30 15:11
Type: Bug
Status: Done
Priority: High
Tags: -
People: Andrei Alexandru, Stefan Achim
Work Stream: University
Details: Window churn: +378 / -43 (net +335) across 3 commit(s)
MRs: !279 — Andrei Alexandru (2 commits) [+371 / -42 (net +329)], !2257 — Achim Stefan (1 commits) [+7 / -1 (net +6)]
ADS-9004
Bug · Done · High · 2026-10-30 20:55 · Rojan Shrestha
Item: ADS-9004
Title: [TUIASI][Alerting] TraefikServiceHighLatency warning is noisy on uni-api while ADS-8912 is unresolved
People: Rojan Shrestha
Time: 2026-10-30 20:55
Type: Bug
Status: Done
Priority: High
Tags: -
People: Rojan Shrestha
Work Stream: Not recorded
Details: MRs: !433 — Rojan Shrestha
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9006
Bug · Done · Medium · 2026-10-30 20:55 · Ionut Ciolan, Rojan Shrestha
Item: ADS-9006
Title: [TUIASI][accommodations-api] Chronic elevated p95 (0.5-2s) and 243 5xx over 7 days, root cause not diagnosed
People: Ionut Ciolan, Rojan Shrestha
Time: 2026-10-30 20:55
Type: Bug
Status: Done
Priority: Medium
Tags: -
People: Ionut Ciolan, Rojan Shrestha
Work Stream: Not recorded
Details: MRs: !96 — Ionut Ciolan
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9038
Bug · Done · Medium · 2026-10-30 20:55 · Pavel Petronel
Item: ADS-9038
Title: [BE] Conduita timestamp
People: Pavel Petronel
Time: 2026-10-30 20:55
Type: Bug
Status: Done
Priority: Medium
Tags: -
People: Pavel Petronel
Work Stream: Not recorded
Details: MRs: !2820 — Petronel Pavel
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9069
Bug · Done · Medium · 2026-10-30 20:55 · Daniel Onisoru
Item: ADS-9069
Title: Foto viewer: delete has no confirmation, no visible toaster, and no destructive styling
People: Daniel Onisoru
Time: 2026-10-30 20:55
Type: Bug
Status: Done
Priority: Medium
Tags: -
People: Daniel Onisoru
Work Stream: Not recorded
Details: MRs: !2189 — Daniel Onisoru
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9077
Bug · Done · High · 2026-10-30 20:55 · Rojan Shrestha
Item: ADS-9077
Title: [Prod][RDS] mysql-master storage-full shutdown again on 2026-10-01: raise allocated storage and cap online DDL, autoscaling cannot react to a 2.4 GiB/min fill
People: Rojan Shrestha
Time: 2026-10-30 20:55
Type: Bug
Status: Done
Priority: High
Tags: -
People: Rojan Shrestha
Work Stream: Platform
Details: MRs: !97 — Rojan Shrestha
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9160
Bug · Done · High · 2026-10-30 20:55 · Rojan Shrestha
Item: ADS-9160
Title: [Prod][Alerting] Detect intermittent crashes across deployment replicas and page sustained availability loss
People: Rojan Shrestha
Time: 2026-10-30 20:55
Type: Bug
Status: Done
Priority: High
Tags: Codex
People: Rojan Shrestha
Work Stream: Platform
Details: MRs: !454 — Rojan Shrestha, !448 — Rojan Shrestha
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9228
Bug · Done · Medium · 2026-10-30 20:55 · Rojan Shrestha
Item: ADS-9228
Title: [Prod][OTel] otel-collector OOMKilled whenever Tempo restarts: retry queue is not bounded by the memory limiter
People: Rojan Shrestha
Time: 2026-10-30 20:55
Type: Bug
Status: Done
Priority: Medium
Tags: -
People: Rojan Shrestha
Work Stream: Not recorded
Details: MRs: !459 — Rojan Shrestha
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9237
Bug · Done · Medium · 2026-10-30 20:55 · Pavel Petronel
Item: ADS-9237
Title: [FE] Calendar class select too long
People: Pavel Petronel
Time: 2026-10-30 20:55
Type: Bug
Status: Done
Priority: Medium
Tags: -
People: Pavel Petronel
Work Stream: Team 1
Details: MRs: !2224 — Petronel Pavel
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9238
Bug · Done · Medium · 2026-10-26 11:10 · Rojan Shrestha
Item: ADS-9238
Title: [Dev][Review envs] /uni returns 503 in ads-7803 after the uni branch merged: env kept pinning the merged branch's image tag
People: Rojan Shrestha
Time: 2026-10-26 11:10
Type: Bug
Status: Done
Priority: Medium
Tags: -
People: Rojan Shrestha
Work Stream: Not recorded
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.
ADS-9243
Bug · Done · High · 2026-10-27 09:00 · Rojan Shrestha
Item: ADS-9243
Title: [TUIASI][RCA] 16 Oct 08:53 UTC db.tuiasi.ro dropped connections, web worker pool froze, accommodations 69% 5xx for 22 min
People: Rojan Shrestha
Time: 2026-10-27 09:00
Type: Bug
Status: Done
Priority: High
Tags: -
People: Rojan Shrestha
Work Stream: Not recorded
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.
ADS-9256
Bug · Done · High · 2026-10-28 10:04 · Rojan Shrestha
Item: ADS-9256
Title: [Prod][AWS][AI] Service p95 alert pools fast reads with synchronous summary generation
People: Rojan Shrestha
Time: 2026-10-28 10:04
Type: Bug
Status: Done
Priority: High
Tags: Codex
People: Rojan Shrestha
Work Stream: Team 2
Details: Window churn: +276 / -86 (net +190) across 3 commit(s)
MRs: !463 — Valentin Pal (3 commits) [+276 / -86 (net +190)]
ADS-9311
Bug · Done · High · 2026-10-26 01:39 · Andrei Alexandru
Item: ADS-9311
Title: [Asachi]: Note eronate
People: Andrei Alexandru
Time: 2026-10-26 01:39
Type: Bug
Status: Done
Priority: High
Tags: -
People: Andrei Alexandru
Work Stream: University
Details: Window churn: +261 / -6 (net +255) across 1 commit(s)
MRs: !278 — Andrei Alexandru (1 commits) [+261 / -6 (net +255)]
ADS-9314
Bug · Done · Urgent · 2026-10-27 10:37 · Luiza Horlescu
Item: ADS-9314
Title: [MOB] taburile "dezvoltare personala" si "manuale" nu afiseaza continut
People: Luiza Horlescu
Time: 2026-10-27 10:37
Type: Bug
Status: Done
Priority: Urgent
Tags: -
People: Luiza Horlescu
Work Stream: Mobile
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.
ADS-9319
Bug · Done · High · 2026-10-30 13:16 · Ioana Ivan
Item: ADS-9319
Title: [Prod][Docgen] Legacy ADST after token migration becomes report 500 instead of 401
People: Ioana Ivan
Time: 2026-10-30 13:16
Type: Bug
Status: Done
Priority: High
Tags: Codex
People: Ioana Ivan
Work Stream: Team 1
Details: Window churn: +199 / -209 (net -10) across 3 commit(s)
MRs: !185 — Ioana Ivan (3 commits) [+199 / -209 (net -10)]
ADS-9329
Bug · Done · High · 2026-10-28 10:04 · Rojan Shrestha
Item: ADS-9329
Title: [Prod][Platform][Loki] storage-loki-0 reached 96.93% usage after sustained growth
People: Rojan Shrestha
Time: 2026-10-28 10:04
Type: Bug
Status: Done
Priority: High
Tags: Codex
People: Rojan Shrestha
Work Stream: Platform
Details: Window churn: +0 / -1 (net -1) across 1 commit(s)
MRs: !466 — Rojan Shrestha (1 commits) [+0 / -1 (net -1)]
ADS-9330
Bug · Done · Highest · 2026-10-28 10:03 · Dragoș Ivan
Item: ADS-9330
Title: [Security][Node.js] Apply October 2026 security updates and verify deployed runtimes
People: Dragoș Ivan
Time: 2026-10-28 10:03
Type: Bug
Status: Done
Priority: Highest
Tags: Codex
People: Dragoș Ivan
Work Stream: Team 2
Details: Window churn: +52 / -45 (net +7) across 38 commit(s)
MRs: !2247 — Dragoș Ivan (1 commits) [+1 / -1 (net +0)], !9 — Dragoș Ivan (2 commits) [+1 / -2 (net -1)], !2890 — Dragoș Ivan (2 commits) [+2 / -3 (net -1)], !6 — Dragoș Ivan (3 commits) [+4 / -3 (net +1)], !13 — Dragoș Ivan (2 commits) [+6 / -2 (net +4)], !149 — Dragoș Ivan (2 commits) [+2 / -1 (net +1)], !45 — Dragoș Ivan (2 commits) [+2 / -1 (net +1)], !35 — Dragoș Ivan (2 commits) [+1 / -2 (net -1)], !1 — Dragoș Ivan (2 commits) [+4 / -4 (net +0)], !1 — Dragoș Ivan (2 commits) [+4 / -4 (net +0)], !16 — Dragoș Ivan (1 commits) [+2 / -2 (net +0)], !39 — Dragoș Ivan (1 commits) [+1 / -1 (net +0)], !1 — Dragoș Ivan, !4 — Dragoș Ivan (1 commits) [+1 / -1 (net +0)], !21 — Dragoș Ivan (1 commits) [+1 / -1 (net +0)], !29 — Dragoș Ivan (2 commits) [+2 / -1 (net +1)], !186 — Dragoș Ivan (1 commits) [+1 / -1 (net +0)], !1 — Dragoș Ivan (1 commits) [+1 / -1 (net +0)], !305 — Dragoș Ivan (2 commits) [+5 / -4 (net +1)], !26 — Dragoș Ivan (1 commits) [+2 / -2 (net +0)], !10 — Dragoș Ivan (1 commits) [+1 / -1 (net +0)], !16 — Dragoș Ivan (1 commits) [+2 / -2 (net +0)], !101 — Dragoș Ivan (2 commits) [+2 / -1 (net +1)], !1 — Dragoș Ivan, !191 — Dragoș Ivan (3 commits) [+4 / -4 (net +0)]
ADS-9331
Bug · Done · High · 2026-10-30 14:07 · Ionut Ciolan
Item: ADS-9331
Title: [Cazari] - Desincronizare numar studenti la afisarea ,,Cazati" fata de raportul ,,Situatii cazari pe camine".
People: Ionut Ciolan
Time: 2026-10-30 14:07
Type: Bug
Status: Done
Priority: High
Tags: -
People: Ionut Ciolan
Work Stream: University
Details: Window churn: +85 / -70 (net +15) across 2 commit(s)
MRs: !99 — Ionut Ciolan (2 commits) [+85 / -70 (net +15)]
ADS-9346
Bug · Done · Highest · 2026-10-28 10:04 · Ioana Ivan
Item: ADS-9346
Title: [FE] EROARE 500 la deschiderea catalogului PDF
People: Ioana Ivan
Time: 2026-10-28 10:04
Type: Bug
Status: Done
Priority: Highest
Tags: -
People: Ioana Ivan
Work Stream: Team 1
Details: Window churn: +8 / -3 (net +5) across 1 commit(s)
MRs: !187 — Ioana Ivan (1 commits) [+8 / -3 (net +5)]
ADS-9374
Bug · Done · Urgent · 2026-10-30 13:16 · Ionut Ciolan
Item: ADS-9374
Title: [Prod][AWS][Staff attendance] Failed activity insert returns HTTP 200 without saving
People: Ionut Ciolan
Time: 2026-10-30 13:16
Type: Bug
Status: Done
Priority: Urgent
Tags: Codex
People: Ionut Ciolan
Work Stream: Team 1
Details: Window churn: +28 / -28 (net +0) across 2 commit(s)
MRs: !2893 — Valentin Pal (2 commits) [+28 / -28 (net +0)]
ADS-9379
Bug · Merged · High · 2026-10-29 14:05 · Rojan Shrestha
Item: ADS-9379
Title: [Dev] Nightly integration tests fail every night on test_web and test_frontend specs (masked by allow_failure), and every distributed dev kubeconfig has expired
People: Rojan Shrestha
Time: 2026-10-29 14:05
Type: Bug
Status: Merged
Priority: High
Tags: -
People: Rojan Shrestha
Work Stream: Not recorded
Details: MRs: !471 — Rojan Shrestha
ADS-9381
Bug · Done · Urgent · 2026-10-30 16:05 · Ioana Ivan
Item: ADS-9381
Title: [FE] dublarea orelor in orar in vizualizare specifica pe profesor
People: Ioana Ivan
Time: 2026-10-30 16:05
Type: Bug
Status: Done
Priority: Urgent
Tags: -
People: Ioana Ivan
Work Stream: Team 1
Details: Window churn: +5 / -12 (net -7) across 1 commit(s)
MRs: !2260 — Ioana Ivan (1 commits) [+5 / -12 (net -7)]

Release Notes: Stories, Tasks, Improvements

Delivery snapshot

Churn cards are deduplicated by MR/commit; row evidence can repeat the same MR when it is linked to multiple Jira items. Evidence split: MR-backed + Direct commits + Jira-only = Total; Carryovers are a subset. Scope split: Product Delivery + Infra = Total. Monday split uses the same row-level Monday visibility across Product Delivery and Infra; Trend Context then renders the split per lane.

Total63
+Lines8312
-Lines3578
Net4734
Commits211
Linked MR evidence118
Type
Status
Done58Merged5
Delivery calculation rules
  • Total is the number of completed Delivery rows in this section.
  • Product Delivery vs Infra is a classification split. Infra includes rows with Jira Work Stream or Monday Team/group containing platform/infra, plus rows associated with Rojan Shrestha, Raul Popovici, or Daniel Onisoru. Test automation stays in Product Delivery, including Paul Tanasuca legacy test automation work, unless it is explicitly tracked as infra work. All other delivery rows are Product Delivery.
  • MR-backed means at least one linked merge request; Direct commits means commit evidence without an MR; Jira-only means neither MR nor direct commit evidence.
  • MR-backed + Direct commits + Jira-only should equal Total. Carryovers are an overlapping subset for Jira items closed this week whose MR landed earlier.
  • Monday and Outside Monday apply to Delivery rows with Monday visibility. Monday means the row was matched by Jira key in the Monday cross-reference; Outside Monday means the row's Jira key was not found in that cross-reference. The Overview Trend Context renders the same split separately for Product Delivery and Infra.
  • Story, Task, Improvement, and any other Type chips are row-type filters; their counts should add back to Total.
  • Line and commit cards use deduplicated in-window GitLab evidence, so manually summing repeated row evidence can overcount.
KeyTitleTimeTypeStatusPriorityScopeMondayPeopleWork StreamEvidence
ADS-1234[QA]-Billing Testing2026-10-30 20:34TaskDoneMediumInfraOutside MondayVlad Rozmarin, Daniel OnisoruNot recorded
MRs: !2360
ADS-4184[Financiar] - Integrare cu grupuri2026-10-30 20:54StoryDoneMediumProduct DeliveryOutside MondayCatalin Cojan, Cosmin OlaruNot recorded
MRs: !1161, !199, !2009 +4 more
ADS-4641Raport - Situatia privind Rezultatele obtinute2026-10-30 20:33StoryDoneMediumProduct DeliveryMondayCatalin CojanTeam 2
MRs: !2252, !2892+817 / -431 (net +386) across 5 commit(s)
ADS-6013Deschidere pagina nativa de adăugare absenta din catalog2026-10-30 20:54StoryDoneMediumProduct DeliveryOutside MondayStefan Agrigo, Stefan Musat +1Not recorded
MRs: !2260
ADS-6326[Vacante][Calendar][Condica] - Vacante pe ani de studiu + Calcul corect săptămâna pară/impară2026-10-30 20:34StoryDoneHighestProduct DeliveryOutside MondayCosmin Olaru, Dron Gabriel +1Not recorded
MRs: !1606, !2352
ADS-6475[FE/BE] Multiselect pentru alocarea disciplinelor Optionale sau Liber alese studentilor TBD2026-10-30 20:54TaskDoneMediumProduct DeliveryOutside MondayAndrei Alexandru, Stefan AchimNot recorded
MRs: !1554, !151
ADS-6553Deploy tracing solution in prod2026-10-30 20:54TaskDoneMediumInfraOutside MondayRaul PopoviciNot recorded
MRs: !2372, !2358, !2336 +1 more
ADS-7111Conturi parinti active/inactive2026-10-30 20:55StoryDoneMediumProduct DeliveryMondayAndrei Dragan, Cosmin Olaru +1Team 1
MRs: !2703, !2089
ADS-7354[Abonamente] - Gestionare recurență pachete anuale2026-10-30 20:33StoryDoneMediumProduct DeliveryOutside MondayDragoș Ivan, Edgar AlexaTeam 2
MRs: !449, !2151, !296 +1 more+1951 / -1632 (net +319) across 156 commit(s)
ADS-7557investigate the Prometheus metric collection because it doesn't align with Loki counts2026-10-30 20:55StoryDoneMediumInfraOutside MondayRojan ShresthaPlatform
MRs: !447
ADS-7621[BE][Catalog] - Calcul indicator sa fie facut pe BE2026-10-30 20:55TaskDoneLowProduct DeliveryOutside MondayRazvan Antoci, Ionut Ciolan +1Team 1
ADS-7660Modificari pe catalog note2026-10-26 01:40StoryDoneHighProduct DeliveryMondayStefan AchimUniversity
Notes only
ADS-7803[FE/BE/MOB/UNI] - Titulatura2026-10-27 10:37TaskDoneMediumProduct DeliveryMondayCosmin Olaru, Ioana Ivan +2Team 1
MRs: !2838, !2778, !2142 +1 more+9 / -71 (net -62) across 1 commit(s)
ADS-8164[Burse] - US6 - Rapoarte2026-10-30 09:45StoryDoneHighProduct DeliveryMondayDana-Mihaela Marițca, Ionut CiolanUniversity
MRs: !271, !2216, !182+83 / -48 (net +35) across 3 commit(s)
ADS-8265Replace billing-cycle deep check with targeted alerts2026-10-30 20:55ImprovementDoneMediumInfraOutside MondayRojan ShresthaNot recorded
MRs: !451
ADS-8403Implement refresh token and token rotation2026-10-30 20:55TaskDoneMediumInfraOutside MondayDaniel OnisoruNot recorded
MRs: !2686
ADS-8404[Elev][Parinte] - Redesign - Rapoarte2026-10-30 20:55ImprovementDoneMediumProduct DeliveryOutside MondayCatalin Cojan, Stefan Agrigo +1Mobile
MRs: !2861, !2762
ADS-8493Post message for surveys2026-10-30 20:55TaskDoneMediumProduct DeliveryOutside MondayPavel Petronel, Stefan AgrigoTeam 1
MRs: !2695
ADS-8581Statistici - Distribuția elevilor pe intervale de medii - Top elevi2026-10-30 12:05StoryMergedMediumProduct DeliveryMondayCatalin Cojan, Ioana Ivan +2Team 1
MRs: !2265, !2889, !2246+4329 / -1219 (net +3110) across 26 commit(s)
ADS-8584[Asachi]-Adaugare ,,Status student" in Clasamentul studentilor din modulul Statistici si rapoarte2026-10-30 15:09ImprovementDoneHighestProduct DeliveryOutside MondayAndrei Alexandru, Stefan AchimUniversity
MRs: !280, !192+128 / -11 (net +117) across 3 commit(s)
ADS-8612[Petre Andrei]-Actualizare nume localitate2026-10-26 01:29ImprovementDoneHighProduct DeliveryOutside Monday-University
Notes only
ADS-8627CRITICAL [prod] - DeploymentZeroAvailableReplicas2026-10-30 20:55StoryDoneMediumInfraOutside MondayRojan ShresthaNot recorded
MRs: !372
ADS-8630Deployment adservio-production/notifications-sync-events-worker has zero available replicas2026-10-30 20:33StoryDoneMediumInfraOutside MondayRojan ShresthaNot recorded
MRs: !371
ADS-8715Refactor download_job cron to move to core-events2026-10-30 20:55TaskDoneMediumInfraOutside MondayDaniel OnisoruNot recorded
MRs: !2746, !383
ADS-8744RDS CloudWatch alarms deliver unformatted email into Slack, needs SNS bridge to Alertmanager2026-10-30 20:55TaskDoneHighInfraOutside MondayRojan ShresthaNot recorded
MRs: !96
ADS-8748Helpdesk infrastructure: AWS foundations, image pipeline and Helm chart2026-10-30 20:55TaskDoneMediumInfraOutside MondayDaniel OnisoruNot recorded
MRs: !86
ADS-8761Notification center2026-10-30 11:45StoryDoneMediumProduct DeliveryOutside MondayStefan MusatMobile
Notes only
ADS-8842Modificari venite dupa import2026-10-26 01:40TaskDoneMediumProduct DeliveryOutside MondayStefan Achim, Andrei AlexandruUniversity
MRs: !2242, !276
ADS-8854[Prod] Scale 11 single-replica API services to 2 replicas with PDBs so rollouts and node drains stop causing per-service outages2026-10-30 20:55TaskDoneMediumInfraOutside MondayRojan ShresthaNot recorded
MRs: !414
ADS-8890[AI] Cleanup summaries2026-10-30 20:55TaskDoneMediumProduct DeliveryOutside MondayAlexandru MurarescuTeam 2
MRs: !2187, !9, !87 +3 more
ADS-8981Sterge permisiunile vechi - scholarship allocation2026-10-26 16:26TaskDoneMediumProduct DeliveryOutside MondayAndrei AlexandruUniversity
Notes only
ADS-9002Move group chat realtime to websocket22026-10-30 20:55TaskDoneMediumInfraOutside MondayDaniel OnisoruNot recorded
MRs: !6, !26, !2811 +2 more
ADS-9026Rename websocket2 / ws2 to websocket2026-10-30 20:55TaskDoneMediumInfraOutside MondayDaniel OnisoruNot recorded
MRs: !7, !2813, !2176 +1 more
ADS-9030Remove "Echipa Adservio" as a recipient across the app2026-10-30 20:55TaskDoneMediumInfraOutside MondayDaniel OnisoruNot recorded
MRs: !2179, !2816
ADS-9040[Prod][RDS] Build the table-cache churn dashboard Gabriel asked for, and unblock him on CloudWatch dashboards2026-10-30 20:55TaskDoneMediumInfraOutside MondayRojan ShresthaNot recorded
MRs: !439
ADS-9051[ANMGD -CLUJ] - Actualizare script conform planului de invatamant transmis2026-10-30 15:11TaskDoneHighestProduct DeliveryOutside MondayAndrei AlexandruUniversity
Notes only
ADS-9093[IaC][Cost Reports] Add separate weekly cost report email for the apps account only2026-10-30 20:55TaskDoneMediumInfraOutside MondayRojan ShresthaNot recorded
MRs: !98
ADS-9099[ANMGD -Cluj] - Creare ani pentru noi cohorte in planul de invatamant2026-10-29 11:42TaskDoneHighProduct DeliveryOutside MondayAndreea MoldovanuUniversity
Notes only
ADS-9107Rename docgen2 to docgen2026-10-30 20:33TaskDoneMediumInfraOutside MondayDaniel OnisoruNot recorded
MRs: !295, !28, !2196 +3 more
ADS-9135[Permisiuni] - Actualizare descrierei permisiuni2026-10-30 20:33TaskDoneMediumProduct DeliveryOutside MondayCatalin Cojan, Marian AndreiTeam 2
MRs: !2896+296 / -1 (net +295) across 2 commit(s)
ADS-9146Gate extracurricular periods on the user's feature flag2026-10-30 20:55TaskDoneMediumInfraOutside MondayDaniel OnisoruNot recorded
MRs: !2839
ADS-9147[Prod][RDS] Document database and application timezones: MySQL sessions run Europe/Athens, uni-api writes UTC2026-10-26 11:02TaskDoneMediumInfraOutside MondayRojan ShresthaNot recorded
Notes only
ADS-9155Fix Teste automate2026-10-30 20:55TaskDoneMediumProduct DeliveryOutside MondayIoana IvanTeam 1
ADS-9167[BE]: Reset activation code timer after email/phone change2026-10-30 14:59TaskDoneMediumProduct DeliveryOutside MondayAndrei Dragan, Cosmin Olaru +1Team 1
MRs: !2862
ADS-9188Numele universitatii contine ghilimele in documentele decarcate2026-10-30 10:27StoryMergedMediumProduct DeliveryOutside MondayStefan AchimUniversity
MRs: !190+20 / -16 (net +4) across 1 commit(s)
ADS-9200[Alerting] Revisit container restart alerts and check for misconfigured thresholds2026-10-30 20:55TaskDoneMediumInfraOutside MondayRojan ShresthaNot recorded
MRs: !455
ADS-9202solicitare Politie ID 23572062026-10-30 16:05TaskDoneHighestProduct DeliveryOutside MondayMarian AndreiTeam 1
MRs: !2899, !2897+335 / -16 (net +319) across 3 commit(s)
ADS-9205[Petre Andrei] - Actualizare pondere din DB2026-10-26 01:38TaskDoneHighProduct DeliveryOutside MondayAndrei AlexandruUniversity
Notes only
ADS-9213iam signs the platform token: RS256 via JWKS, JSON payload with jti2026-10-30 20:55TaskDoneMediumInfraOutside MondayDaniel OnisoruNot recorded
MRs: !189, !98, !9 +14 more
ADS-9219Ștergere adresă de email din baza de date2026-10-28 11:10TaskDoneUrgentProduct DeliveryOutside MondayDragoș IvanTeam 2
Notes only
ADS-9229Update annual average history2026-10-30 20:55TaskDoneMediumProduct DeliveryOutside MondayStefan AgrigoNot recorded
MRs: !23
ADS-9272Product Analytics - Abonamente2026-10-28 14:08StoryDoneHighestProduct DeliveryOutside MondayDragoș IvanTeam 2
Notes only
ADS-9282Prepare hybrid production auth 401 monitoring with 06:00–midnight Bucharest notifications2026-10-28 10:04TaskDoneHighInfraOutside MondayRojan ShresthaPlatform
MRs: !461+1 / -2 (net -1) across 1 commit(s)
ADS-9295[Asachi]: Suport actualizare status student2026-10-30 00:40TaskDoneMediumProduct DeliveryOutside MondayDana-Mihaela Marițca, Andrei AlexandruUniversity
Notes only
ADS-9301[Mob] Titulatura - modificari mob2026-10-30 11:46TaskDoneMediumProduct DeliveryOutside MondayRazvan Antoci, Stefan MusatMobile
Notes only
ADS-9348[QA]-topuri elevi2026-10-30 13:06TaskDoneMediumProduct DeliveryOutside MondayRazvan AntociTeam 1
Notes only
ADS-9349[Security][Prod][EKS] Bottlerocket v1.64.0 nodes trust the compromised eMudhra intermediates (AWS bulletin 2026-150-AWS, CVE-2026-111943)2026-10-30 10:20TaskDoneHighInfraOutside MondayRojan ShresthaNot recorded
Notes only
ADS-9357[Prod][Grafana] Recreate the Loki-based API Family Observability dashboards on Prometheus, provisioned from git2026-10-30 10:42TaskMergedMediumInfraOutside MondayRojan ShresthaNot recorded
MRs: !473, !472+81 / -13 (net +68) across 2 commit(s)
ADS-9360[Prod][Staging][Apps][EKS] Roll Bottlerocket nodes to 1.68.0 for CVE-2026-111943 (eMudhra CA key recovery)2026-10-29 06:32TaskMergedHighInfraOutside MondayRojan ShresthaNot recorded
MRs: !104, !102+28 / -0 (net +28) across 2 commit(s)
ADS-9387[FE][PUBLIC] Actualizare texte edumarket2026-10-30 13:16TaskDoneMediumProduct DeliveryOutside MondayPavel PetronelTeam 1
MRs: !101+41 / -45 (net -4) across 1 commit(s)
ADS-9400Eliminare verificare astClasamentActiv de pe widgetul de rezumat AI2026-10-30 20:33TaskDoneMediumProduct DeliveryOutside MondayAlexandru MurarescuTeam 2
MRs: !2258+0 / -2 (net -2) across 1 commit(s)
ADS-9406[QA] Pregătire prezentare Minister: Butonul Roșu, Școala Altfel/Verde și Wellbeing2026-10-30 20:55TaskDoneHighProduct DeliveryOutside MondayCosmin Olaru, Ioana IvanNot recorded
MRs: !2266, !2263+93 / -33 (net +60) across 2 commit(s)
ADS-9414Imbunatatiri widget rezumat AI2026-10-30 17:36ImprovementMergedMediumProduct DeliveryOutside MondayAlexandru MurarescuTeam 2
MRs: !2264+100 / -38 (net +62) across 2 commit(s)
ADS-1234
Task · Done · Medium · 2026-10-30 20:34 · Vlad Rozmarin, Daniel Onisoru
Item: ADS-1234
Title: [QA]-Billing Testing
People: Vlad Rozmarin, Daniel Onisoru
Time: 2026-10-30 20:34
Type: Task
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Vlad Rozmarin, Daniel Onisoru
Work Stream: Not recorded
Details: MRs: !2360 — Daniel Onisoru
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-4184
Story · Done · Medium · 2026-10-30 20:54 · Catalin Cojan, Cosmin Olaru
Item: ADS-4184
Title: [Financiar] - Integrare cu grupuri
People: Catalin Cojan, Cosmin Olaru
Time: 2026-10-30 20:54
Type: Story
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Catalin Cojan, Cosmin Olaru
Work Stream: Not recorded
Details: MRs: !1161 — Diana Apetrii, !199 — Robert, !2009 — Catalin Cojan, !1159 — Diana Apetrii, !1078 — Anca Lehutu, !2028 — Catalin Cojan, !2098 — Catalin Cojan
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-4641
Story · Done · Medium · 2026-10-30 20:33 · Catalin Cojan
Item: ADS-4641
Title: Raport - Situatia privind Rezultatele obtinute
People: Catalin Cojan
Time: 2026-10-30 20:33
Type: Story
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Monday
People: Catalin Cojan
Work Stream: Team 2
Details: Window churn: +817 / -431 (net +386) across 5 commit(s)
MRs: !2252 — Catalin Cojan (3 commits) [+680 / -386 (net +294)], !2892 — Catalin Cojan (2 commits) [+137 / -45 (net +92)]
ADS-6013
Story · Done · Medium · 2026-10-30 20:54 · Stefan Agrigo, Stefan Musat +1
Item: ADS-6013
Title: Deschidere pagina nativa de adăugare absenta din catalog
People: Stefan Agrigo, Stefan Musat, Andrei Dragan
Time: 2026-10-30 20:54
Type: Story
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Stefan Agrigo, Stefan Musat, Andrei Dragan
Work Stream: Not recorded
Details: MRs: !2260 — Andrei Dragan
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-6326
Story · Done · Highest · 2026-10-30 20:34 · Cosmin Olaru, Dron Gabriel +1
Item: ADS-6326
Title: [Vacante][Calendar][Condica] - Vacante pe ani de studiu + Calcul corect săptămâna pară/impară
People: Cosmin Olaru, Dron Gabriel, Ionut Ciolan
Time: 2026-10-30 20:34
Type: Story
Status: Done
Priority: Highest
Scope: Product Delivery
Monday: Outside Monday
People: Cosmin Olaru, Dron Gabriel, Ionut Ciolan
Work Stream: Not recorded
Details: MRs: !1606 — Dron Gabriel, !2352 — Ionut Ciolan
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-6475
Task · Done · Medium · 2026-10-30 20:54 · Andrei Alexandru, Stefan Achim
Item: ADS-6475
Title: [FE/BE] Multiselect pentru alocarea disciplinelor Optionale sau Liber alese studentilor TBD
People: Andrei Alexandru, Stefan Achim
Time: 2026-10-30 20:54
Type: Task
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Andrei Alexandru, Stefan Achim
Work Stream: Not recorded
Details: MRs: !1554 — Achim Stefan, !151 — Andrei Alexandru
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-6553
Task · Done · Medium · 2026-10-30 20:54 · Raul Popovici
Item: ADS-6553
Title: Deploy tracing solution in prod
People: Raul Popovici
Time: 2026-10-30 20:54
Type: Task
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Raul Popovici
Work Stream: Not recorded
Details: MRs: !2372 — Raul Popovici, !2358 — Raul Popovici, !2336 — Raul Popovici, !205 — Raul Popovici
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-7111
Story · Done · Medium · 2026-10-30 20:55 · Andrei Dragan, Cosmin Olaru +1
Item: ADS-7111
Title: Conturi parinti active/inactive
People: Andrei Dragan, Cosmin Olaru, Pavel Petronel
Time: 2026-10-30 20:55
Type: Story
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Monday
People: Andrei Dragan, Cosmin Olaru, Pavel Petronel
Work Stream: Team 1
Details: MRs: !2703 — Andrei Dragan, !2089 — Petronel Pavel
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-7354
Story · Done · Medium · 2026-10-30 20:33 · Dragoș Ivan, Edgar Alexa
Item: ADS-7354
Title: [Abonamente] - Gestionare recurență pachete anuale
People: Dragoș Ivan, Edgar Alexa
Time: 2026-10-30 20:33
Type: Story
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Dragoș Ivan, Edgar Alexa
Work Stream: Team 2
Details: Window churn: +1951 / -1632 (net +319) across 156 commit(s)
MRs: !449 — Edgar Alexa (100 commits) [+128 / -116 (net +12)], !2151 — Edgar Alexa (2 commits) [+16 / -13 (net +3)], !296 — Edgar Alexa (11 commits) [+392 / -443 (net -51)], !129 — Edgar Alexa (43 commits) [+1415 / -1060 (net +355)]
ADS-7557
Story · Done · Medium · 2026-10-30 20:55 · Rojan Shrestha
Item: ADS-7557
Title: investigate the Prometheus metric collection because it doesn't align with Loki counts
People: Rojan Shrestha
Time: 2026-10-30 20:55
Type: Story
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Rojan Shrestha
Work Stream: Platform
Details: MRs: !447 — Rojan Shrestha
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-7621
Task · Done · Low · 2026-10-30 20:55 · Razvan Antoci, Ionut Ciolan +1
Item: ADS-7621
Title: [BE][Catalog] - Calcul indicator sa fie facut pe BE
People: Razvan Antoci, Ionut Ciolan, Pavel Petronel
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: Low
Scope: Product Delivery
Monday: Outside Monday
People: Razvan Antoci, Ionut Ciolan, Pavel Petronel
Work Stream: Team 1
Details: MRs: !124 — Petronel Pavel, !2500 — Ionut Ciolan, !1839 — Petronel Pavel
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-7660
Story · Done · High · 2026-10-26 01:40 · Stefan Achim
Item: ADS-7660
Title: Modificari pe catalog note
People: Stefan Achim
Time: 2026-10-26 01:40
Type: Story
Status: Done
Priority: High
Scope: Product Delivery
Monday: Monday
People: Stefan Achim
Work Stream: University
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.; Resolved in Jira during the report window without any recoverable GitLab MR evidence; this is often no-code, data, or operational work.
ADS-7803
Task · Done · Medium · 2026-10-27 10:37 · Cosmin Olaru, Ioana Ivan +2
Item: ADS-7803
Title: [FE/BE/MOB/UNI] - Titulatura
People: Cosmin Olaru, Ioana Ivan, Andrei Alexandru, Stefan Musat
Time: 2026-10-27 10:37
Type: Task
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Monday
People: Cosmin Olaru, Ioana Ivan, Andrei Alexandru, Stefan Musat
Work Stream: Team 1
Details: Window churn: +9 / -71 (net -62) across 1 commit(s)
MRs: !2838 — Ioana Ivan (1 commits) [+9 / -71 (net -62)], !2778 — Ioana Ivan, !2142 — Ioana Ivan, !181 — Ioana Ivan
ADS-8164
Story · Done · High · 2026-10-30 09:45 · Dana-Mihaela Marițca, Ionut Ciolan
Item: ADS-8164
Title: [Burse] - US6 - Rapoarte
People: Dana-Mihaela Marițca, Ionut Ciolan
Time: 2026-10-30 09:45
Type: Story
Status: Done
Priority: High
Scope: Product Delivery
Monday: Monday
People: Dana-Mihaela Marițca, Ionut Ciolan
Work Stream: University
Details: Window churn: +83 / -48 (net +35) across 3 commit(s)
MRs: !271 — Ionut Ciolan, !2216 — Dana Mihaela Maritca (2 commits) [+74 / -46 (net +28)], !182 — Dana Mihaela Maritca (1 commits) [+9 / -2 (net +7)]
ADS-8265
Improvement · Done · Medium · 2026-10-30 20:55 · Rojan Shrestha
Item: ADS-8265
Title: Replace billing-cycle deep check with targeted alerts
People: Rojan Shrestha
Time: 2026-10-30 20:55
Type: Improvement
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Rojan Shrestha
Work Stream: Not recorded
Details: MRs: !451 — Rojan Shrestha
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-8403
Task · Done · Medium · 2026-10-30 20:55 · Daniel Onisoru
Item: ADS-8403
Title: Implement refresh token and token rotation
People: Daniel Onisoru
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Daniel Onisoru
Work Stream: Not recorded
Details: MRs: !2686 — Daniel Onisoru
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-8404
Improvement · Done · Medium · 2026-10-30 20:55 · Catalin Cojan, Stefan Agrigo +1
Item: ADS-8404
Title: [Elev][Parinte] - Redesign - Rapoarte
People: Catalin Cojan, Stefan Agrigo, Stefan Musat
Time: 2026-10-30 20:55
Type: Improvement
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Catalin Cojan, Stefan Agrigo, Stefan Musat
Work Stream: Mobile
Details: MRs: !2861 — Catalin Cojan, !2762 — Catalin Cojan
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-8493
Task · Done · Medium · 2026-10-30 20:55 · Pavel Petronel, Stefan Agrigo
Item: ADS-8493
Title: Post message for surveys
People: Pavel Petronel, Stefan Agrigo
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Pavel Petronel, Stefan Agrigo
Work Stream: Team 1
Details: MRs: !2695 — Petronel Pavel
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-8581
Story · Merged · Medium · 2026-10-30 12:05 · Catalin Cojan, Ioana Ivan +2
Item: ADS-8581
Title: Statistici - Distribuția elevilor pe intervale de medii - Top elevi
People: Catalin Cojan, Ioana Ivan, Pavel Petronel, Stefan Musat
Time: 2026-10-30 12:05
Type: Story
Status: Merged
Priority: Medium
Scope: Product Delivery
Monday: Monday
People: Catalin Cojan, Ioana Ivan, Pavel Petronel, Stefan Musat
Work Stream: Team 1
Details: Window churn: +4329 / -1219 (net +3110) across 26 commit(s)
MRs: !2265 — Catalin Cojan (2 commits) [+47 / -15 (net +32)], !2889 — Catalin Cojan (12 commits) [+3359 / -727 (net +2632)], !2246 — Petronel Pavel (12 commits) [+923 / -477 (net +446)]
ADS-8584
Improvement · Done · Highest · 2026-10-30 15:09 · Andrei Alexandru, Stefan Achim
Item: ADS-8584
Title: [Asachi]-Adaugare ,,Status student" in Clasamentul studentilor din modulul Statistici si rapoarte
People: Andrei Alexandru, Stefan Achim
Time: 2026-10-30 15:09
Type: Improvement
Status: Done
Priority: Highest
Scope: Product Delivery
Monday: Outside Monday
People: Andrei Alexandru, Stefan Achim
Work Stream: University
Details: Window churn: +128 / -11 (net +117) across 3 commit(s)
MRs: !280 — Andrei Alexandru (2 commits) [+76 / -2 (net +74)], !192 — Achim Stefan (1 commits) [+52 / -9 (net +43)]
ADS-8612
Improvement · Done · High · 2026-10-26 01:29
Item: ADS-8612
Title: [Petre Andrei]-Actualizare nume localitate
Time: 2026-10-26 01:29
Type: Improvement
Status: Done
Priority: High
Scope: Product Delivery
Monday: Outside Monday
Work Stream: University
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.; Resolved in Jira during the report window without any recoverable GitLab MR evidence; this is often no-code, data, or operational work.
ADS-8627
Story · Done · Medium · 2026-10-30 20:55 · Rojan Shrestha
Item: ADS-8627
Title: CRITICAL [prod] - DeploymentZeroAvailableReplicas
People: Rojan Shrestha
Time: 2026-10-30 20:55
Type: Story
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Rojan Shrestha
Work Stream: Not recorded
Details: MRs: !372 — Rojan Shrestha
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-8630
Story · Done · Medium · 2026-10-30 20:33 · Rojan Shrestha
Item: ADS-8630
Title: Deployment adservio-production/notifications-sync-events-worker has zero available replicas
People: Rojan Shrestha
Time: 2026-10-30 20:33
Type: Story
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Rojan Shrestha
Work Stream: Not recorded
Details: MRs: !371 — Rojan Shrestha
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-8715
Task · Done · Medium · 2026-10-30 20:55 · Daniel Onisoru
Item: ADS-8715
Title: Refactor download_job cron to move to core-events
People: Daniel Onisoru
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Daniel Onisoru
Work Stream: Not recorded
Details: MRs: !2746 — Daniel Onisoru, !383 — Daniel Onisoru
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-8744
Task · Done · High · 2026-10-30 20:55 · Rojan Shrestha
Item: ADS-8744
Title: RDS CloudWatch alarms deliver unformatted email into Slack, needs SNS bridge to Alertmanager
People: Rojan Shrestha
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: High
Scope: Infra
Monday: Outside Monday
People: Rojan Shrestha
Work Stream: Not recorded
Details: MRs: !96 — Rojan Shrestha
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-8748
Task · Done · Medium · 2026-10-30 20:55 · Daniel Onisoru
Item: ADS-8748
Title: Helpdesk infrastructure: AWS foundations, image pipeline and Helm chart
People: Daniel Onisoru
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Daniel Onisoru
Work Stream: Not recorded
Details: MRs: !86 — Daniel Onisoru
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-8761
Story · Done · Medium · 2026-10-30 11:45 · Stefan Musat
Item: ADS-8761
Title: Notification center
People: Stefan Musat
Time: 2026-10-30 11:45
Type: Story
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Stefan Musat
Work Stream: Mobile
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.; Resolved in Jira during the report window without any recoverable GitLab MR evidence; this is often no-code, data, or operational work.
ADS-8842
Task · Done · Medium · 2026-10-26 01:40 · Stefan Achim, Andrei Alexandru
Item: ADS-8842
Title: Modificari venite dupa import
People: Stefan Achim, Andrei Alexandru
Time: 2026-10-26 01:40
Type: Task
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Stefan Achim, Andrei Alexandru
Work Stream: University
Details: MRs: !2242 — Achim Stefan, !276 — Andrei Alexandru
ADS-8854
Task · Done · Medium · 2026-10-30 20:55 · Rojan Shrestha
Item: ADS-8854
Title: [Prod] Scale 11 single-replica API services to 2 replicas with PDBs so rollouts and node drains stop causing per-service outages
People: Rojan Shrestha
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Rojan Shrestha
Work Stream: Not recorded
Details: MRs: !414 — Rojan Shrestha
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-8890
Task · Done · Medium · 2026-10-30 20:55 · Alexandru Murarescu
Item: ADS-8890
Title: [AI] Cleanup summaries
People: Alexandru Murarescu
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Alexandru Murarescu
Work Stream: Team 2
Details: MRs: !2187 — Alex Murarescu, !9 — Alex Murarescu, !87 — Alex Murarescu, !92 — Alex Murarescu, !93 — Alex Murarescu, !94 — Alex Murarescu
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-8981
Task · Done · Medium · 2026-10-26 16:26 · Andrei Alexandru
Item: ADS-8981
Title: Sterge permisiunile vechi - scholarship allocation
People: Andrei Alexandru
Time: 2026-10-26 16:26
Type: Task
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Andrei Alexandru
Work Stream: University
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.; Resolved in Jira during the report window without any recoverable GitLab MR evidence; this is often no-code, data, or operational work.
ADS-9002
Task · Done · Medium · 2026-10-30 20:55 · Daniel Onisoru
Item: ADS-9002
Title: Move group chat realtime to websocket2
People: Daniel Onisoru
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Daniel Onisoru
Work Stream: Not recorded
Details: MRs: !6 — Daniel Onisoru, !26 — Daniel Onisoru, !2811 — Daniel Onisoru, !2171 — Daniel Onisoru, !432 — Daniel Onisoru
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9026
Task · Done · Medium · 2026-10-30 20:55 · Daniel Onisoru
Item: ADS-9026
Title: Rename websocket2 / ws2 to websocket
People: Daniel Onisoru
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Daniel Onisoru
Work Stream: Not recorded
Details: MRs: !7 — Daniel Onisoru, !2813 — Daniel Onisoru, !2176 — Daniel Onisoru, !436 — Daniel Onisoru
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9030
Task · Done · Medium · 2026-10-30 20:55 · Daniel Onisoru
Item: ADS-9030
Title: Remove "Echipa Adservio" as a recipient across the app
People: Daniel Onisoru
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Daniel Onisoru
Work Stream: Not recorded
Details: MRs: !2179 — Daniel Onisoru, !2816 — Daniel Onisoru
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9040
Task · Done · Medium · 2026-10-30 20:55 · Rojan Shrestha
Item: ADS-9040
Title: [Prod][RDS] Build the table-cache churn dashboard Gabriel asked for, and unblock him on CloudWatch dashboards
People: Rojan Shrestha
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Rojan Shrestha
Work Stream: Not recorded
Details: MRs: !439 — Rojan Shrestha
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9051
Task · Done · Highest · 2026-10-30 15:11 · Andrei Alexandru
Item: ADS-9051
Title: [ANMGD -CLUJ] - Actualizare script conform planului de invatamant transmis
People: Andrei Alexandru
Time: 2026-10-30 15:11
Type: Task
Status: Done
Priority: Highest
Scope: Product Delivery
Monday: Outside Monday
People: Andrei Alexandru
Work Stream: University
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.; Resolved in Jira during the report window without any recoverable GitLab MR evidence; this is often no-code, data, or operational work.
ADS-9093
Task · Done · Medium · 2026-10-30 20:55 · Rojan Shrestha
Item: ADS-9093
Title: [IaC][Cost Reports] Add separate weekly cost report email for the apps account only
People: Rojan Shrestha
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Rojan Shrestha
Work Stream: Not recorded
Details: MRs: !98 — Rojan Shrestha
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9099
Task · Done · High · 2026-10-29 11:42 · Andreea Moldovanu
Item: ADS-9099
Title: [ANMGD -Cluj] - Creare ani pentru noi cohorte in planul de invatamant
People: Andreea Moldovanu
Time: 2026-10-29 11:42
Type: Task
Status: Done
Priority: High
Scope: Product Delivery
Monday: Outside Monday
People: Andreea Moldovanu
Work Stream: University
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.; Resolved in Jira during the report window without any recoverable GitLab MR evidence; this is often no-code, data, or operational work.
ADS-9107
Task · Done · Medium · 2026-10-30 20:33 · Daniel Onisoru
Item: ADS-9107
Title: Rename docgen2 to docgen
People: Daniel Onisoru
Time: 2026-10-30 20:33
Type: Task
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Daniel Onisoru
Work Stream: Not recorded
Details: MRs: !295 — Daniel Onisoru, !28 — Daniel Onisoru, !2196 — Daniel Onisoru, !178 — Daniel Onisoru, !443 — Daniel Onisoru, !2828 — Daniel Onisoru
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9135
Task · Done · Medium · 2026-10-30 20:33 · Catalin Cojan, Marian Andrei
Item: ADS-9135
Title: [Permisiuni] - Actualizare descrierei permisiuni
People: Catalin Cojan, Marian Andrei
Time: 2026-10-30 20:33
Type: Task
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Catalin Cojan, Marian Andrei
Work Stream: Team 2
Details: Window churn: +296 / -1 (net +295) across 2 commit(s)
MRs: !2896 — Catalin Cojan (2 commits) [+296 / -1 (net +295)]
ADS-9146
Task · Done · Medium · 2026-10-30 20:55 · Daniel Onisoru
Item: ADS-9146
Title: Gate extracurricular periods on the user's feature flag
People: Daniel Onisoru
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Daniel Onisoru
Work Stream: Not recorded
Details: MRs: !2839 — Daniel Onisoru
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9147
Task · Done · Medium · 2026-10-26 11:02 · Rojan Shrestha
Item: ADS-9147
Title: [Prod][RDS] Document database and application timezones: MySQL sessions run Europe/Athens, uni-api writes UTC
People: Rojan Shrestha
Time: 2026-10-26 11:02
Type: Task
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Rojan Shrestha
Work Stream: Not recorded
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.; Resolved in Jira during the report window without any recoverable GitLab MR evidence; this is often no-code, data, or operational work.
ADS-9155
Task · Done · Medium · 2026-10-30 20:55 · Ioana Ivan
Item: ADS-9155
Title: Fix Teste automate
People: Ioana Ivan
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Ioana Ivan
Work Stream: Team 1
Details: MRs: !2846 — Ioana Ivan, !2214 — Ioana Ivan, !2841 — Ioana Ivan
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9167
Task · Done · Medium · 2026-10-30 14:59 · Andrei Dragan, Cosmin Olaru +1
Item: ADS-9167
Title: [BE]: Reset activation code timer after email/phone change
People: Andrei Dragan, Cosmin Olaru, Ioana Ivan
Time: 2026-10-30 14:59
Type: Task
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Andrei Dragan, Cosmin Olaru, Ioana Ivan
Work Stream: Team 1
Details: MRs: !2862 — Andrei Dragan
ADS-9188
Story · Merged · Medium · 2026-10-30 10:27 · Stefan Achim
Item: ADS-9188
Title: Numele universitatii contine ghilimele in documentele decarcate
People: Stefan Achim
Time: 2026-10-30 10:27
Type: Story
Status: Merged
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Stefan Achim
Work Stream: University
Details: Window churn: +20 / -16 (net +4) across 1 commit(s)
MRs: !190 — Achim Stefan (1 commits) [+20 / -16 (net +4)]
ADS-9200
Task · Done · Medium · 2026-10-30 20:55 · Rojan Shrestha
Item: ADS-9200
Title: [Alerting] Revisit container restart alerts and check for misconfigured thresholds
People: Rojan Shrestha
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Rojan Shrestha
Work Stream: Not recorded
Details: MRs: !455 — Rojan Shrestha
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9202
Task · Done · Highest · 2026-10-30 16:05 · Marian Andrei
Item: ADS-9202
Title: solicitare Politie ID 2357206
People: Marian Andrei
Time: 2026-10-30 16:05
Type: Task
Status: Done
Priority: Highest
Scope: Product Delivery
Monday: Outside Monday
People: Marian Andrei
Work Stream: Team 1
Details: Window churn: +335 / -16 (net +319) across 3 commit(s)
MRs: !2899 — Marian Andrei (1 commits) [+1 / -16 (net -15)], !2897 — Marian Andrei (2 commits) [+334 / -0 (net +334)]
ADS-9205
Task · Done · High · 2026-10-26 01:38 · Andrei Alexandru
Item: ADS-9205
Title: [Petre Andrei] - Actualizare pondere din DB
People: Andrei Alexandru
Time: 2026-10-26 01:38
Type: Task
Status: Done
Priority: High
Scope: Product Delivery
Monday: Outside Monday
People: Andrei Alexandru
Work Stream: University
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.; Resolved in Jira during the report window without any recoverable GitLab MR evidence; this is often no-code, data, or operational work.
ADS-9213
Task · Done · Medium · 2026-10-30 20:55 · Daniel Onisoru
Item: ADS-9213
Title: iam signs the platform token: RS256 via JWKS, JSON payload with jti
People: Daniel Onisoru
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Daniel Onisoru
Work Stream: Not recorded
Details: MRs: !189 — Daniel Onisoru, !98 — Daniel Onisoru, !9 — Daniel Onisoru, !22 — Daniel Onisoru, !20 — Daniel Onisoru, !37 — Daniel Onisoru, !14 — Daniel Onisoru, !30 — Daniel Onisoru, !43 — Daniel Onisoru, !272 — Daniel Onisoru, !99 — Daniel Onisoru, !14 — Daniel Onisoru, !301 — Daniel Onisoru, !143 — Daniel Onisoru, !2860 — Daniel Onisoru, !457 — Daniel Onisoru, !3 — Daniel Onisoru
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9219
Task · Done · Urgent · 2026-10-28 11:10 · Dragoș Ivan
Item: ADS-9219
Title: Ștergere adresă de email din baza de date
People: Dragoș Ivan
Time: 2026-10-28 11:10
Type: Task
Status: Done
Priority: Urgent
Scope: Product Delivery
Monday: Outside Monday
People: Dragoș Ivan
Work Stream: Team 2
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.; Resolved in Jira during the report window without any recoverable GitLab MR evidence; this is often no-code, data, or operational work.
ADS-9229
Task · Done · Medium · 2026-10-30 20:55 · Stefan Agrigo
Item: ADS-9229
Title: Update annual average history
People: Stefan Agrigo
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Stefan Agrigo
Work Stream: Not recorded
Details: MRs: !23 — Stefan Agrigo
Notes: Resolved in Jira during the report window; linked merged MR landed before the report window.
ADS-9272
Story · Done · Highest · 2026-10-28 14:08 · Dragoș Ivan
Item: ADS-9272
Title: Product Analytics - Abonamente
People: Dragoș Ivan
Time: 2026-10-28 14:08
Type: Story
Status: Done
Priority: Highest
Scope: Product Delivery
Monday: Outside Monday
People: Dragoș Ivan
Work Stream: Team 2
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.; Resolved in Jira during the report window without any recoverable GitLab MR evidence; this is often no-code, data, or operational work.
ADS-9282
Task · Done · High · 2026-10-28 10:04 · Rojan Shrestha
Item: ADS-9282
Title: Prepare hybrid production auth 401 monitoring with 06:00–midnight Bucharest notifications
People: Rojan Shrestha
Time: 2026-10-28 10:04
Type: Task
Status: Done
Priority: High
Scope: Infra
Monday: Outside Monday
People: Rojan Shrestha
Work Stream: Platform
Details: Window churn: +1 / -2 (net -1) across 1 commit(s)
MRs: !461 — Valentin Pal (1 commits) [+1 / -2 (net -1)]
ADS-9295
Task · Done · Medium · 2026-10-30 00:40 · Dana-Mihaela Marițca, Andrei Alexandru
Item: ADS-9295
Title: [Asachi]: Suport actualizare status student
People: Dana-Mihaela Marițca, Andrei Alexandru
Time: 2026-10-30 00:40
Type: Task
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Dana-Mihaela Marițca, Andrei Alexandru
Work Stream: University
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.; Resolved in Jira during the report window without any recoverable GitLab MR evidence; this is often no-code, data, or operational work.
ADS-9301
Task · Done · Medium · 2026-10-30 11:46 · Razvan Antoci, Stefan Musat
Item: ADS-9301
Title: [Mob] Titulatura - modificari mob
People: Razvan Antoci, Stefan Musat
Time: 2026-10-30 11:46
Type: Task
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Razvan Antoci, Stefan Musat
Work Stream: Mobile
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.; Resolved in Jira during the report window without any recoverable GitLab MR evidence; this is often no-code, data, or operational work.
ADS-9348
Task · Done · Medium · 2026-10-30 13:06 · Razvan Antoci
Item: ADS-9348
Title: [QA]-topuri elevi
People: Razvan Antoci
Time: 2026-10-30 13:06
Type: Task
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Razvan Antoci
Work Stream: Team 1
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.; Resolved in Jira during the report window without any recoverable GitLab MR evidence; this is often no-code, data, or operational work.
ADS-9349
Task · Done · High · 2026-10-30 10:20 · Rojan Shrestha
Item: ADS-9349
Title: [Security][Prod][EKS] Bottlerocket v1.64.0 nodes trust the compromised eMudhra intermediates (AWS bulletin 2026-150-AWS, CVE-2026-111943)
People: Rojan Shrestha
Time: 2026-10-30 10:20
Type: Task
Status: Done
Priority: High
Scope: Infra
Monday: Outside Monday
People: Rojan Shrestha
Work Stream: Not recorded
Details: Notes: Resolved in Jira during the report window, but no linked merged MR was found.; Resolved in Jira during the report window without any recoverable GitLab MR evidence; this is often no-code, data, or operational work.
ADS-9357
Task · Merged · Medium · 2026-10-30 10:42 · Rojan Shrestha
Item: ADS-9357
Title: [Prod][Grafana] Recreate the Loki-based API Family Observability dashboards on Prometheus, provisioned from git
People: Rojan Shrestha
Time: 2026-10-30 10:42
Type: Task
Status: Merged
Priority: Medium
Scope: Infra
Monday: Outside Monday
People: Rojan Shrestha
Work Stream: Not recorded
Details: Window churn: +81 / -13 (net +68) across 2 commit(s)
MRs: !473 — Rojan Shrestha (1 commits) [+17 / -0 (net +17)], !472 — Rojan Shrestha (1 commits) [+64 / -13 (net +51)]
ADS-9360
Task · Merged · High · 2026-10-29 06:32 · Rojan Shrestha
Item: ADS-9360
Title: [Prod][Staging][Apps][EKS] Roll Bottlerocket nodes to 1.68.0 for CVE-2026-111943 (eMudhra CA key recovery)
People: Rojan Shrestha
Time: 2026-10-29 06:32
Type: Task
Status: Merged
Priority: High
Scope: Infra
Monday: Outside Monday
People: Rojan Shrestha
Work Stream: Not recorded
Details: Window churn: +28 / -0 (net +28) across 2 commit(s)
MRs: !104 — Rojan Shrestha (1 commits) [+10 / -0 (net +10)], !102 — Rojan Shrestha (1 commits) [+18 / -0 (net +18)]
ADS-9387
Task · Done · Medium · 2026-10-30 13:16 · Pavel Petronel
Item: ADS-9387
Title: [FE][PUBLIC] Actualizare texte edumarket
People: Pavel Petronel
Time: 2026-10-30 13:16
Type: Task
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Pavel Petronel
Work Stream: Team 1
Details: Window churn: +41 / -45 (net -4) across 1 commit(s)
MRs: !101 — Petronel Pavel (1 commits) [+41 / -45 (net -4)]
ADS-9400
Task · Done · Medium · 2026-10-30 20:33 · Alexandru Murarescu
Item: ADS-9400
Title: Eliminare verificare astClasamentActiv de pe widgetul de rezumat AI
People: Alexandru Murarescu
Time: 2026-10-30 20:33
Type: Task
Status: Done
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Alexandru Murarescu
Work Stream: Team 2
Details: Window churn: +0 / -2 (net -2) across 1 commit(s)
MRs: !2258 — Alex Murarescu (1 commits) [+0 / -2 (net -2)]
ADS-9406
Task · Done · High · 2026-10-30 20:55 · Cosmin Olaru, Ioana Ivan
Item: ADS-9406
Title: [QA] Pregătire prezentare Minister: Butonul Roșu, Școala Altfel/Verde și Wellbeing
People: Cosmin Olaru, Ioana Ivan
Time: 2026-10-30 20:55
Type: Task
Status: Done
Priority: High
Scope: Product Delivery
Monday: Outside Monday
People: Cosmin Olaru, Ioana Ivan
Work Stream: Not recorded
Details: Window churn: +93 / -33 (net +60) across 2 commit(s)
MRs: !2266 — Ioana Ivan (1 commits) [+76 / -23 (net +53)], !2263 — Ioana Ivan (1 commits) [+17 / -10 (net +7)]
ADS-9414
Improvement · Merged · Medium · 2026-10-30 17:36 · Alexandru Murarescu
Item: ADS-9414
Title: Imbunatatiri widget rezumat AI
People: Alexandru Murarescu
Time: 2026-10-30 17:36
Type: Improvement
Status: Merged
Priority: Medium
Scope: Product Delivery
Monday: Outside Monday
People: Alexandru Murarescu
Work Stream: Team 2
Details: Window churn: +100 / -38 (net +62) across 2 commit(s)
MRs: !2264 — Alex Murarescu (2 commits) [+100 / -38 (net +62)]

Release Notes: Non-ticketed GitLab Work

Total non-ticketed work
8
Merged GitLab items
8

Other work kinds

Non-Jira8

Merged GitLab work that could not be tied to a resolved Jira ticket. Deploy, incident, and infra signals stay in Ops.

TitleTimeKindPeopleDetails
No Jira ticket
10-30 16:02Non-JiraMergedNo Jira ticketGeorge MurgociJira ticket: No Jira ticket shown as GitLab-only work
Window churn: +28 / -8 (net +20) across 6 commit(s)
MRs: !470 — George Murgoci (6 commits) [+28 / -8 (net +20)]
Notes: Merged in GitLab during the report window without an ADS ticket key.
No Jira ticket
10-30 16:02Non-JiraMergedNo Jira ticketDragoș Ivan, George MurgociJira ticket: No Jira ticket shown as GitLab-only work
Window churn: +155 / -117 (net +38) across 14 commit(s)
MRs: !2249 — George Murgoci (14 commits) [+155 / -117 (net +38)]
Notes: Merged in GitLab during the report window without an ADS ticket key.
No Jira ticket
10-27 16:42Non-JiraMergedNo Jira ticketDaniel OnisoruJira ticket: No Jira ticket shown as GitLab-only work
Window churn: +18 / -2 (net +16) across 1 commit(s)
MRs: !3 — Daniel Onisoru (1 commits) [+18 / -2 (net +16)]
Notes: Merged in GitLab during the report window without an ADS ticket key.
No Jira ticket
10-27 16:40Non-JiraMergedNo Jira ticketDaniel OnisoruJira ticket: No Jira ticket shown as GitLab-only work
Window churn: +31 / -49 (net -18) across 1 commit(s)
MRs: !4 — Daniel Onisoru (1 commits) [+31 / -49 (net -18)]
Notes: Merged in GitLab during the report window without an ADS ticket key.
No Jira ticket
10-27 16:24Non-JiraMergedNo Jira ticketDaniel OnisoruJira ticket: No Jira ticket shown as GitLab-only work
Window churn: +1 / -1 (net +0) across 1 commit(s)
MRs: !3 — Daniel Onisoru (1 commits) [+1 / -1 (net +0)]
Notes: Merged in GitLab during the report window without an ADS ticket key.
No Jira ticket
10-27 16:03Non-JiraMergedNo Jira ticketDaniel OnisoruJira ticket: No Jira ticket shown as GitLab-only work
Window churn: +1 / -1 (net +0) across 1 commit(s)
MRs: !2 — Daniel Onisoru (1 commits) [+1 / -1 (net +0)]
Notes: Merged in GitLab during the report window without an ADS ticket key.
No Jira ticket
10-27 16:03Non-JiraMergedNo Jira ticketDaniel OnisoruJira ticket: No Jira ticket shown as GitLab-only work
Window churn: +48 / -17 (net +31) across 1 commit(s)
MRs: !2 — Daniel Onisoru (1 commits) [+48 / -17 (net +31)]
Notes: Merged in GitLab during the report window without an ADS ticket key.
No Jira ticket
10-27 16:01Non-JiraMergedNo Jira ticketDaniel OnisoruJira ticket: No Jira ticket shown as GitLab-only work
Window churn: +1013 / -347 (net +666) across 4 commit(s)
MRs: !2 — Daniel Onisoru (4 commits) [+1013 / -347 (net +666)]
Notes: Merged in GitLab during the report window without an ADS ticket key.
Upload frontend sourcemaps to Sentry on production deploy
No Jira ticket · Non-Jira · Merged · 2026-10-30 16:02 · George Murgoci
People: George Murgoci
Ticket state: No Jira ticket
Time: 2026-10-30 16:02
Type: Non-Jira
Status: Merged
People: George Murgoci
Details: Jira ticket: No Jira ticket shown as GitLab-only work
Window churn: +28 / -8 (net +20) across 6 commit(s)
MRs: !470 — George Murgoci (6 commits) [+28 / -8 (net +20)]
Notes: Merged in GitLab during the report window without an ADS ticket key.
added sentry integration
No Jira ticket · Non-Jira · Merged · 2026-10-30 16:02 · Dragoș Ivan, George Murgoci
People: Dragoș Ivan, George Murgoci
Ticket state: No Jira ticket
Time: 2026-10-30 16:02
Type: Non-Jira
Status: Merged
People: Dragoș Ivan, George Murgoci
Details: Jira ticket: No Jira ticket shown as GitLab-only work
Window churn: +155 / -117 (net +38) across 14 commit(s)
MRs: !2249 — George Murgoci (14 commits) [+155 / -117 (net +38)]
Notes: Merged in GitLab during the report window without an ADS ticket key.
End a run from your machine after its answer when idle_timeout_sec is 0
No Jira ticket · Non-Jira · Merged · 2026-10-27 16:42 · Daniel Onisoru
People: Daniel Onisoru
Ticket state: No Jira ticket
Time: 2026-10-27 16:42
Type: Non-Jira
Status: Merged
People: Daniel Onisoru
Details: Jira ticket: No Jira ticket shown as GitLab-only work
Window churn: +18 / -2 (net +16) across 1 commit(s)
MRs: !3 — Daniel Onisoru (1 commits) [+18 / -2 (net +16)]
Notes: Merged in GitLab during the report window without an ADS ticket key.
Fold release-checker into release-announcer
No Jira ticket · Non-Jira · Merged · 2026-10-27 16:40 · Daniel Onisoru
People: Daniel Onisoru
Ticket state: No Jira ticket
Time: 2026-10-27 16:40
Type: Non-Jira
Status: Merged
People: Daniel Onisoru
Details: Jira ticket: No Jira ticket shown as GitLab-only work
Window churn: +31 / -49 (net -18) across 1 commit(s)
MRs: !4 — Daniel Onisoru (1 commits) [+31 / -49 (net -18)]
Notes: Merged in GitLab during the report window without an ADS ticket key.
Let release-announcer post to #vio-test
No Jira ticket · Non-Jira · Merged · 2026-10-27 16:24 · Daniel Onisoru
People: Daniel Onisoru
Ticket state: No Jira ticket
Time: 2026-10-27 16:24
Type: Non-Jira
Status: Merged
People: Daniel Onisoru
Details: Jira ticket: No Jira ticket shown as GitLab-only work
Window churn: +1 / -1 (net +0) across 1 commit(s)
MRs: !3 — Daniel Onisoru (1 commits) [+1 / -1 (net +0)]
Notes: Merged in GitLab during the report window without an ADS ticket key.
Name vio_reply and vio_post_message among the vio upstream's tools
No Jira ticket · Non-Jira · Merged · 2026-10-27 16:03 · Daniel Onisoru
People: Daniel Onisoru
Ticket state: No Jira ticket
Time: 2026-10-27 16:03
Type: Non-Jira
Status: Merged
People: Daniel Onisoru
Details: Jira ticket: No Jira ticket shown as GitLab-only work
Window churn: +1 / -1 (net +0) across 1 commit(s)
MRs: !2 — Daniel Onisoru (1 commits) [+1 / -1 (net +0)]
Notes: Merged in GitLab during the report window without an ADS ticket key.
Answer through vio_reply
No Jira ticket · Non-Jira · Merged · 2026-10-27 16:03 · Daniel Onisoru
People: Daniel Onisoru
Ticket state: No Jira ticket
Time: 2026-10-27 16:03
Type: Non-Jira
Status: Merged
People: Daniel Onisoru
Details: Jira ticket: No Jira ticket shown as GitLab-only work
Window churn: +48 / -17 (net +31) across 1 commit(s)
MRs: !2 — Daniel Onisoru (1 commits) [+48 / -17 (net +31)]
Notes: Merged in GitLab during the report window without an ADS ticket key.
Let agents speak only through tools
No Jira ticket · Non-Jira · Merged · 2026-10-27 16:01 · Daniel Onisoru
People: Daniel Onisoru
Ticket state: No Jira ticket
Time: 2026-10-27 16:01
Type: Non-Jira
Status: Merged
People: Daniel Onisoru
Details: Jira ticket: No Jira ticket shown as GitLab-only work
Window churn: +1013 / -347 (net +666) across 4 commit(s)
MRs: !2 — Daniel Onisoru (4 commits) [+1013 / -347 (net +666)]
Notes: Merged in GitLab during the report window without an ADS ticket key.

Release Notes: Deployments

Total deployments
16
GitLab-backed deploys
16

Deployment kinds

GitLab Deploy16

What sits here

This tab is reserved for deployment evidence. GitLab production deploy jobs are the source of truth, with Slack deploy messages attached as corroborating evidence when available.

TitleTimeKindPeople
2026-10-30 21:51GitLab DeploySuccessDragoș Ivan
2026-10-30 20:32GitLab DeploySuccessDragoș Ivan
2026-10-30 19:57GitLab DeploySuccessDragoș Ivan
2026-10-30 19:12GitLab DeploySuccessDragoș Ivan
2026-10-30 16:23GitLab DeploySuccessDragoș Ivan
2026-10-30 15:43GitLab DeploySuccessDaniel Onisoru
2026-10-30 15:33GitLab DeploySuccessDaniel Onisoru
2026-10-30 15:03GitLab DeploySuccessIoana Ivan
2026-10-29 16:38GitLab DeploySuccessDragoș Ivan, Daniel Onisoru
2026-10-28 12:22GitLab DeploySuccessDragoș Ivan
2026-10-27 17:24GitLab DeploySuccessDragoș Ivan
2026-10-27 13:01GitLab DeploySuccessDaniel Onisoru, Dragoș Ivan
2026-10-27 11:58GitLab DeploySuccessDaniel Onisoru
2026-10-26 18:41GitLab DeploySuccessIoana Ivan
2026-10-26 17:59GitLab DeploySuccessDragoș Ivan
2026-10-24 11:36GitLab DeploySuccessDragoș Ivan, Daniel Onisoru
Production deploy via Helm 2 pipeline 178798
2026-10-30 21:51 · GitLab Deploy · Success · Dragoș Ivan
Time: 2026-10-30 21:51
People: Dragoș Ivan
Type: GitLab Deploy
Status: Success
Production deploy via Helm 2 pipeline 178795
2026-10-30 20:32 · GitLab Deploy · Success · Dragoș Ivan
Time: 2026-10-30 20:32
People: Dragoș Ivan
Type: GitLab Deploy
Status: Success
Production deploy via Helm 2 pipeline 178792
2026-10-30 19:57 · GitLab Deploy · Success · Dragoș Ivan
Time: 2026-10-30 19:57
People: Dragoș Ivan
Type: GitLab Deploy
Status: Success
Production deploy via Helm 2 pipeline 178783
2026-10-30 19:12 · GitLab Deploy · Success · Dragoș Ivan
Time: 2026-10-30 19:12
People: Dragoș Ivan
Type: GitLab Deploy
Status: Success
Production deploy via Helm 2 pipeline 178717
2026-10-30 16:23 · GitLab Deploy · Success · Dragoș Ivan
Time: 2026-10-30 16:23
People: Dragoș Ivan
Type: GitLab Deploy
Status: Success
Production deploy via Helm 2 pipeline 178702
2026-10-30 15:43 · GitLab Deploy · Success · Daniel Onisoru
Time: 2026-10-30 15:43
People: Daniel Onisoru
Type: GitLab Deploy
Status: Success
Production deploy via Helm 2 pipeline 178686
2026-10-30 15:33 · GitLab Deploy · Success · Daniel Onisoru
Time: 2026-10-30 15:33
People: Daniel Onisoru
Type: GitLab Deploy
Status: Success
Production deploy via Helm 2 pipeline 178666
2026-10-30 15:03 · GitLab Deploy · Success · Ioana Ivan
Time: 2026-10-30 15:03
People: Ioana Ivan
Type: GitLab Deploy
Status: Success
Production deploy via Helm 2 pipeline 178447
2026-10-29 16:38 · GitLab Deploy · Success · Dragoș Ivan, Daniel Onisoru
Time: 2026-10-29 16:38
People: Dragoș Ivan, Daniel Onisoru
Type: GitLab Deploy
Status: Success
Production deploy via Helm 2 pipeline 178105
2026-10-28 12:22 · GitLab Deploy · Success · Dragoș Ivan
Time: 2026-10-28 12:22
People: Dragoș Ivan
Type: GitLab Deploy
Status: Success
Production deploy via Helm 2 pipeline 177969
2026-10-27 17:24 · GitLab Deploy · Success · Dragoș Ivan
Time: 2026-10-27 17:24
People: Dragoș Ivan
Type: GitLab Deploy
Status: Success
Production deploy via Helm 2 pipeline 177824
2026-10-27 13:01 · GitLab Deploy · Success · Daniel Onisoru, Dragoș Ivan
Time: 2026-10-27 13:01
People: Daniel Onisoru, Dragoș Ivan
Type: GitLab Deploy
Status: Success
Production deploy via Helm 2 pipeline 177811
2026-10-27 11:58 · GitLab Deploy · Success · Daniel Onisoru
Time: 2026-10-27 11:58
People: Daniel Onisoru
Type: GitLab Deploy
Status: Success
Production deploy via Helm 2 pipeline 177661
2026-10-26 18:41 · GitLab Deploy · Success · Ioana Ivan
Time: 2026-10-26 18:41
People: Ioana Ivan
Type: GitLab Deploy
Status: Success
Production deploy via Helm 2 pipeline 177626
2026-10-26 17:59 · GitLab Deploy · Success · Dragoș Ivan
Time: 2026-10-26 17:59
People: Dragoș Ivan
Type: GitLab Deploy
Status: Success
Production deploy via Helm 2 pipeline 176930
2026-10-24 11:36 · GitLab Deploy · Success · Dragoș Ivan, Daniel Onisoru
Time: 2026-10-24 11:36
People: Dragoș Ivan, Daniel Onisoru
Type: GitLab Deploy
Status: Success

Release Notes: Ops Signals and Incidents

Ops kinds

Slack Infra3Slack Incident1
How Slack signals are selected

This tab does not include every Slack warning. We check readable messages from #dezvoltare, #infra, #major-incident, #devops, and #devleads, then keep only messages classified as incident or infra signals. Messages with an ADS-XXXX key are attached back to the matching Jira/GitLab item instead of being duplicated here. Deploy messages are kept in the separate Deployments tab only when they match a GitLab production deployment, test-result chatter is ignored, very short generic infra messages are ignored, and repeated alerts pushed in succession with the same channel/category/summary are collapsed into one signal.

TitleTimeKindPeopleDetails
2026-10-29 17:41Slack IncidentObserved-Notes: Observed in Slack channel #infra during the report window.
2026-10-30 19:07Slack InfraObserved-Notes: Observed in Slack channel #infra during the report window.
2026-10-30 18:06Slack InfraObserved-Notes: Observed in Slack channel #infra during the report window.
2026-10-27 15:59Slack InfraObserved-Notes: Observed in Slack channel #infra during the report window.
:snowflake: *Dragoș Ivan* froze releases to *production* | Resolving RMQ Restart Subscriptions major incident
Slack Incident · Observed · 2026-10-29 17:41
Time: 2026-10-29 17:41
Type: Slack Incident
Status: Observed
Details: Notes: Observed in Slack channel #infra during the report window.
:sunny: *Dragoș Ivan* lifted the release freeze on *production*
Slack Infra · Observed · 2026-10-30 19:07
Time: 2026-10-30 19:07
Type: Slack Infra
Status: Observed
Details: Notes: Observed in Slack channel #infra during the report window.
:snowflake: *Dragoș Ivan* froze releases to *production* | Getting Subscriptions 2.0 ready
Slack Infra · Observed · 2026-10-30 18:06
Time: 2026-10-30 18:06
Type: Slack Infra
Status: Observed
Details: Notes: Observed in Slack channel #infra during the report window.
:snowflake: *Dragoș Ivan* froze releases to *production* | Node Version Bump for Security Patches
Slack Infra · Observed · 2026-10-27 15:59
Time: 2026-10-27 15:59
Type: Slack Infra
Status: Observed
Details: Notes: Observed in Slack channel #infra during the report window.

Release Notes: Work in Progress

WIP snapshot

Raw GitLab audit: +35283 / -9022 (net +26261) across 195 commit(s) across 48 distinct MR(s).

Total62
+Lines34543
-Lines8659
Net25884
Commits195
Linked MR evidence48
KeyTitleTypeStatusPriorityFocusPeopleWork StreamEvidence
No Jira ticketDraft: Fix bulk daycare journal selector after toolbar measurement duplicationGitLab-only WIPIn ProgressValentin Pal, Valy PalNot recorded
No Jira ticketMRs: !2267+5 / -1 (net +4) across 1 commit(s)
No Jira ticketDraft: Wait for exemption report route readinessGitLab-only WIPIn ProgressValentin Pal, Valy PalNot recorded
No Jira ticketMRs: !2250+6 / -4 (net +2) across 1 commit(s)
ADS-6985Prezenta studentiStoryIn ProgressHighMagda GradinaruUniversity
Notes only
ADS-7354[Abonamente] - Gestionare recurență pachete anualeStoryDoneMediumEdgar Alexa, George MurgociTeam 2
MRs: !304, !148, !150 +1 more+15834 / -1051 (net +14783) across 6 commit(s)
ADS-7560Examinari studentiStoryIn ProgressHighestIonut CiolanUniversity
Notes only
ADS-7803[FE/BE/MOB/UNI] - TitulaturaTaskDoneMediumCosmin Olaru, Ioana Ivan +2Team 1
MRs: !2876+2 / -5 (net -3) across 2 commit(s)
ADS-8110[UPG][Asachi] - Update modul BurseEpicMergedHighIuliana Gugeanu, Dana-Mihaela MarițcaNot recorded
MRs: !2241+49 / -23 (net +26) across 2 commit(s)
ADS-8180[Registre Matricole] - US4 Download macheta RMUStoryCode ReviewLowIuliana Gugeanu, Virlan Francisc-GabrielUniversity
Notes only
ADS-8485[PLATFORM] Evaluate EC2 Savings Plans for EKS node capacityStoryIn ProgressMediumRojan ShresthaNot recorded
Notes only
ADS-8543Flux alocare automata burse de performantaStoryIn ProgressHighDana-Mihaela Marițca, Ionut CiolanUniversity
MRs: !2230, !275+3833 / -1053 (net +2780) across 5 commit(s)
ADS-8567NOMENCLATOR - Refactor structura clasaStoryTestingMediumAndrei Dragan, Cosmin Olaru +3Team 1
MRs: !2793, !2193+3196 / -1621 (net +1575) across 28 commit(s)
ADS-8576[Elev][Parinte] - Redesign Note si absente - WebStoryReady for testingMediumPavel PetronelTeam 1
MRs: !2259, !2898+2748 / -283 (net +2465) across 9 commit(s)
ADS-8581Statistici - Distribuția elevilor pe intervale de medii - Top eleviStoryMergedMediumCatalin Cojan, Pavel Petronel +1Team 1
MRs: !2901+265 / -52 (net +213) across 1 commit(s)
ADS-8679Refactor student, situatie scolaraStoryTestingMediumStefan Achim, Alexandru Murarescu +3University
MRs: !2238, !189, !269 +1 more+1410 / -524 (net +886) across 9 commit(s)
ADS-8687[Prod][AWS][Web] Student averages API dereferences missing class metadata - 14 failures/72hBugTo DoHighestVP, Valentin PalTeam 1
MRs: !2887+6 / -1 (net +5) across 1 commit(s)
ADS-8757[Billing] - Migrat tot codul pe NestStoryIn ProgressMediumGeorge Murgoci, Edgar AlexaTeam 2
MRs: !306, !460, !289 +1 more+3034 / -2817 (net +217) across 84 commit(s)
ADS-8760[FE]: Schimbari pe Suprascrieri si transferuriTaskReady for testingMediumIoana IvanTeam 1
MRs: !2251, !188, !2888+147 / -55 (net +92) across 5 commit(s)
ADS-8763[Asachi][BE] Import studenti pentru anul universitar 2026-2027TaskIn ProgressMediumAndrei AlexandruUniversity
Notes only
ADS-8769[Abonamente][Admin][Statistici] - UpdatesImprovementDoneMediumEdgar Alexa, George MurgociTeam 2
MRs: !2256, !307+156 / -108 (net +48) across 2 commit(s)
ADS-8787Redis Updates/santinele on nest projectsStoryDoneMediumGeorge MurgociTeam 2
MRs: !308+427 / -40 (net +387) across 1 commit(s)
ADS-8812Download RMStoryDoneMediumIonut Ciolan, Stefan AchimUniversity
MRs: !2875+15 / -24 (net -9) across 1 commit(s)
ADS-8818[Asachi] - Lipsa alocare studenti in sesiunea 2BugReady for testingHigh-University
Notes only
ADS-8944Inchidere a tuturor cataloagelorStoryIn ProgressHighestStefan AchimUniversity
Notes only
ADS-8997[Mobile] - New User Experience PolishStoryReady for testingMediumStefan AgrigoMobile
Commits: bf91091b, 282a207b +4 more+386 / -70 (net +316) across 6 commit(s)
ADS-9000[FE] incadrarea elevilor pe medii-elev fara nota inclus in intervalul 1-1,99BugTo DoHighestVP, Valentin PalTeam 1
MRs: !2884+1 / -1 (net +0) across 1 commit(s)
ADS-9047Adaugare coordonator clasa in lista de destinatari propusiTaskCode ReviewMediumRazvan AntociTeam 1
Notes only
ADS-9080Create unit testing for Reports, Subjects, Activites, NewsfeedStoryTestingMediumStefan AgrigoMobile
Notes only
ADS-9102[BE] Change response status codeTaskReady for testingHighIoana Ivan, Marian AndreiTeam 1
MRs: !2222+8 / -4 (net +4) across 1 commit(s)
ADS-9103[Prod][TUIASI][Control plane] etcd write latency makes scheduler and controller-manager lose leader election several times a dayBugReady for testingMediumRojan ShresthaNot recorded
Notes only
ADS-9106[Notifications] - Refactor notificări proiecte NodeStoryIn ProgressMediumDragoș IvanTeam 2
Notes only
ADS-9136Design si flux sesiuni de examinareSubtaskIn ProgressMediumDaniel NechitaUniversity
Notes only
ADS-9137[FE] eroare 403 la descarcare raport statistici din perspectiva de diriginte- managementul claseiBugTo DoHighestVP, Valentin PalTeam 1
MRs: !2885+2 / -2 (net +0) across 1 commit(s)
ADS-9162[Prod][AWS][Auth] Google SSO returns 500 when provider error is an objectBugTo DoUrgentDaniel OnisoruTeam 1
MRs: !2886+6 / -1 (net +5) across 2 commit(s)
ADS-9171[Prod][Alerting] KubeletServerCertificateExpiration warns inside the kubelet's normal rotation windowBugReady for testingMediumRojan ShresthaNot recorded
MRs: !468+25 / -0 (net +25) across 1 commit(s)
ADS-9210Migrare Timezone GMT+3 -> UTCTaskIn ProgressMediumAlexandru MurarescuTeam 2
MRs: !2895, !2254+1365 / -621 (net +744) across 11 commit(s)
ADS-9232[Prod][Ingress] HTTP flood on www.adservio.ro/ro OOM-kills both core-public-ingress podsBugIn ProgressHighRojan ShresthaNot recorded
Notes only
ADS-9259Download RM cu Observatii si SemnatariTaskIn ProgressMediumStefan AchimUniversity
Notes only
ADS-9265Product Analytics v2 (team1)TaskIn ProgressMediumMarian AndreiTeam 1
Notes only
ADS-9298Remove FLAG_WELLBEING_AI_SUMMARYStoryIn ProgressMediumAlexandru MurarescuTeam 2
Notes only
ADS-9302Widget - Rapoarte AcademiceStoryIn ProgressMediumCatalin Cojan, Stefan AgrigoMobile
Notes only
ADS-9305[Spike] Selectie All tabel FrontendSubtaskIn ProgressMediumStefan AchimUniversity
Notes only
ADS-9307[BE] stergere moduleTaskDoneUrgentMarian AndreiTeam 1
MRs: !2891+426 / -0 (net +426) across 1 commit(s)
ADS-9324Student/parents subject/evolution improvementsTaskReady for testingMediumStefan AgrigoMobile
Commits: 7c480943, 704efa83 +1 more+833 / -242 (net +591) across 3 commit(s)
ADS-9327[FE] La incercarea de autentificare in cont de pe mobile, ecranul ramane albBugTo DoHighestDragoș IvanMobile
MRs: !2248+25 / -3 (net +22) across 1 commit(s)
ADS-9330[Security][Node.js] Apply October 2026 security updates and verify deployed runtimesBugDoneHighestDragoș IvanTeam 2
MRs: !467+5 / -0 (net +5) across 1 commit(s)
ADS-9332Adaugare nr absente in statistica CESImprovementIn ProgressHighPavel PetronelTeam 1
MRs: !2900, !2262+104 / -5 (net +99) across 2 commit(s)
ADS-9339[FE][Evolutie]- Elev clase active multipleBugIn ProgressMediumIoana IvanTeam 1
Notes only
ADS-9340[FE][Mob] - Date elevi inactiviTaskIn ProgressMediumIoana Ivan, Stefan AgrigoMobile
MRs: !2253, !2894+16 / -7 (net +9) across 2 commit(s)
ADS-9341[Prod][RDS] mysql-master freeable memory has fallen about 0.55 GiB a week since the 1 Oct restart and now flaps the memory-low alarmBugIn ProgressMediumRojan ShresthaNot recorded
Notes only
ADS-9345Delete clSpecID completely and drop from DBStoryIn ProgressMediumAndrei Dragan, Ioana IvanTeam 1
Notes only
ADS-9351[BE] - Rapoarte academiceSubtaskIn ProgressMediumCatalin CojanTeam 2
Notes only
ADS-9355[AI] Agent Vio de code review pe MR-uri GitLab (orice proiect)StoryIn ProgressHighMarian AndreiTeam 1
Notes only
ADS-9360[Prod][Staging][Apps][EKS] Roll Bottlerocket nodes to 1.68.0 for CVE-2026-111943 (eMudhra CA key recovery)TaskMergedHighRojan ShresthaNot recorded
MRs: !103+10 / -0 (net +10) across 1 commit(s)
ADS-9361[Security][Prod] Upgrade RabbitMQ 3.12.10 (end-of-life) to a supported version for the AMQP 0-9-1 memory DoSTaskIn ProgressHighRojan ShresthaNot recorded
Notes only
ADS-9367[Subscriptions] - Worker notificăriSubtaskIn ProgressMediumDragoș IvanTeam 2
Notes only
ADS-9372Fix add grade issue on last day of moduleTaskReady for testingMediumStefan AgrigoMobile
Notes only
ADS-9380[Prod][RDS] Tenant migrations permanently consume catalog DB memory: mysql-catalog2 lost 5 GiB on 23 Oct and 1.5 GiB more on 26 OctBugIn ProgressHighRojan ShresthaNot recorded
Notes only
ADS-9384Adauga view IBAN pt studenti in modulul de burseStoryReady for testingMediumIuliana GugeanuUniversity
MRs: !2261+45 / -0 (net +45) across 1 commit(s)
ADS-9386Design Modul Check-inSubtaskIn ProgressMediumDaniel NechitaUniversity
Notes only
ADS-9392[Prod][Notifications] notifications-event-manager crashes overnight on "MySQL server has gone away": tenant DB connection is reused past wait_timeoutBugIn ProgressMediumRojan ShresthaNot recorded
Notes only
ADS-9398[FE] Daycare Actions menu disappears when table columns refreshBugTo DoHighValentin Pal, Valy PalNot recorded
MRs: !2255+153 / -41 (net +112) across 2 commit(s)
ADS-9415[BE] Import SIIIR - specializareTaskIn ProgressMediumMarian AndreiTeam 1
Notes only
Draft: Fix bulk daycare journal selector after toolbar measurement duplication
No Jira ticket · GitLab-only WIP · In Progress · Valentin Pal, Valy Pal
People: Valentin Pal, Valy Pal
Ticket state: No Jira ticket
Type: GitLab-only WIP
Status: In Progress
People: Valentin Pal, Valy Pal
Work Stream: Not recorded
Details: Jira ticket: No Jira ticket shown as GitLab-only work
Window churn: +5 / -1 (net +4) across 1 commit(s)
MRs: !2267 — Valentin Pal (1 commits) [+5 / -1 (net +4)]
Notes: Open GitLab MR with verified in-window commits and no ADS ticket key; counted as WIP, not delivered work.
Draft: Wait for exemption report route readiness
No Jira ticket · GitLab-only WIP · In Progress · Valentin Pal, Valy Pal
People: Valentin Pal, Valy Pal
Ticket state: No Jira ticket
Type: GitLab-only WIP
Status: In Progress
People: Valentin Pal, Valy Pal
Work Stream: Not recorded
Details: Jira ticket: No Jira ticket shown as GitLab-only work
Window churn: +6 / -4 (net +2) across 1 commit(s)
MRs: !2250 — Valentin Pal (1 commits) [+6 / -4 (net +2)]
Notes: Open GitLab MR with verified in-window commits and no ADS ticket key; counted as WIP, not delivered work.
ADS-6985
Story · In Progress · High · Magda Gradinaru
Item: ADS-6985
Title: Prezenta studenti
People: Magda Gradinaru
Type: Story
Status: In Progress
Priority: High
People: Magda Gradinaru
Work Stream: University
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-7354
Story · Done · Medium · Edgar Alexa, George Murgoci
Item: ADS-7354
Title: [Abonamente] - Gestionare recurență pachete anuale
People: Edgar Alexa, George Murgoci
Type: Story
Status: Done
Priority: Medium
People: Edgar Alexa, George Murgoci
Work Stream: Team 2
Details: Window churn: +15834 / -1051 (net +14783) across 6 commit(s)
MRs: !304 — Valentin Pal (1 commits) [+6457 / -484 (net +5973)], !148 — Valentin Pal (2 commits) [+6196 / -482 (net +5714)], !150 — George Murgoci (2 commits) [+17 / -18 (net -1)], !34 — Valentin Pal (1 commits) [+3164 / -67 (net +3097)]
ADS-7560
Story · In Progress · Highest · Ionut Ciolan
Item: ADS-7560
Title: Examinari studenti
People: Ionut Ciolan
Type: Story
Status: In Progress
Priority: Highest
People: Ionut Ciolan
Work Stream: University
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-7803
Task · Done · Medium · Cosmin Olaru, Ioana Ivan +2
Item: ADS-7803
Title: [FE/BE/MOB/UNI] - Titulatura
People: Cosmin Olaru, Ioana Ivan, Andrei Alexandru, Stefan Musat
Type: Task
Status: Done
Priority: Medium
People: Cosmin Olaru, Ioana Ivan, Andrei Alexandru, Stefan Musat
Work Stream: Team 1
Details: Window churn: +2 / -5 (net -3) across 2 commit(s)
MRs: !2876 — Ioana Ivan (2 commits) [+2 / -5 (net -3)]
ADS-8110
Epic · Merged · High · Iuliana Gugeanu, Dana-Mihaela Marițca
Item: ADS-8110
Title: [UPG][Asachi] - Update modul Burse
People: Iuliana Gugeanu, Dana-Mihaela Marițca
Type: Epic
Status: Merged
Priority: High
People: Iuliana Gugeanu, Dana-Mihaela Marițca
Work Stream: Not recorded
Details: Window churn: +49 / -23 (net +26) across 2 commit(s)
MRs: !2241 — Iuliana Gugeanu (2 commits) [+49 / -23 (net +26)]
ADS-8180
Story · Code Review · Low · Iuliana Gugeanu, Virlan Francisc-Gabriel
Item: ADS-8180
Title: [Registre Matricole] - US4 Download macheta RMU
People: Iuliana Gugeanu, Virlan Francisc-Gabriel
Type: Story
Status: Code Review
Priority: Low
People: Iuliana Gugeanu, Virlan Francisc-Gabriel
Work Stream: University
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-8485
Story · In Progress · Medium · Rojan Shrestha
Item: ADS-8485
Title: [PLATFORM] Evaluate EC2 Savings Plans for EKS node capacity
People: Rojan Shrestha
Type: Story
Status: In Progress
Priority: Medium
People: Rojan Shrestha
Work Stream: Not recorded
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.; Slack infra activity observed in #devops: _Savings Plan for prod EKS nodes, for review (<https://adservio.atlassian.net/browse/ADS-8485|ADS-8485>)_ Prod (15825...
ADS-8543
Story · In Progress · High · Dana-Mihaela Marițca, Ionut Ciolan
Item: ADS-8543
Title: Flux alocare automata burse de performanta
People: Dana-Mihaela Marițca, Ionut Ciolan
Type: Story
Status: In Progress
Priority: High
People: Dana-Mihaela Marițca, Ionut Ciolan
Work Stream: University
Details: Window churn: +3833 / -1053 (net +2780) across 5 commit(s)
MRs: !2230 — Dana Mihaela Maritca (2 commits) [+1445 / -664 (net +781)], !275 — Ionut Ciolan (3 commits) [+2388 / -389 (net +1999)]
ADS-8567
Story · Testing · Medium · Andrei Dragan, Cosmin Olaru +3
Item: ADS-8567
Title: NOMENCLATOR - Refactor structura clasa
People: Andrei Dragan, Cosmin Olaru, Marian Andrei, Pavel Petronel, Stefan Musat
Type: Story
Status: Testing
Priority: Medium
People: Andrei Dragan, Cosmin Olaru, Marian Andrei, Pavel Petronel, Stefan Musat
Work Stream: Team 1
Details: Window churn: +3196 / -1621 (net +1575) across 28 commit(s)
MRs: !2793 — Andrei Dragan (22 commits) [+3125 / -810 (net +2315)], !2193 — Petronel Pavel (6 commits) [+71 / -811 (net -740)]
ADS-8576
Story · Ready for testing · Medium · Pavel Petronel
Item: ADS-8576
Title: [Elev][Parinte] - Redesign Note si absente - Web
People: Pavel Petronel
Type: Story
Status: Ready for testing
Priority: Medium
People: Pavel Petronel
Work Stream: Team 1
Details: Window churn: +2748 / -283 (net +2465) across 9 commit(s)
MRs: !2259 — Petronel Pavel (8 commits) [+2747 / -282 (net +2465)], !2898 — Petronel Pavel (1 commits) [+1 / -1 (net +0)]
ADS-8581
Story · Merged · Medium · Catalin Cojan, Pavel Petronel +1
Item: ADS-8581
Title: Statistici - Distribuția elevilor pe intervale de medii - Top elevi
People: Catalin Cojan, Pavel Petronel, Stefan Musat
Type: Story
Status: Merged
Priority: Medium
People: Catalin Cojan, Pavel Petronel, Stefan Musat
Work Stream: Team 1
Details: Window churn: +265 / -52 (net +213) across 1 commit(s)
MRs: !2901 — Catalin Cojan (1 commits) [+265 / -52 (net +213)]
ADS-8679
Story · Testing · Medium · Stefan Achim, Alexandru Murarescu +3
Item: ADS-8679
Title: Refactor student, situatie scolara
People: Stefan Achim, Alexandru Murarescu, George Murgoci, Ionut Ciolan, Andrei Alexandru
Type: Story
Status: Testing
Priority: Medium
People: Stefan Achim, Alexandru Murarescu, George Murgoci, Ionut Ciolan, Andrei Alexandru
Work Stream: University
Details: Window churn: +1410 / -524 (net +886) across 9 commit(s)
MRs: !2238 — Achim Stefan (3 commits) [+191 / -157 (net +34)], !189 — Achim Stefan (1 commits) [+84 / -56 (net +28)], !269 — Andrei Alexandru (4 commits) [+1125 / -301 (net +824)], !100 — Ionut Ciolan (1 commits) [+10 / -10 (net +0)]
ADS-8687
Bug · To Do · Highest · VP, Valentin Pal
Item: ADS-8687
Title: [Prod][AWS][Web] Student averages API dereferences missing class metadata - 14 failures/72h
People: VP, Valentin Pal
Type: Bug
Status: To Do
Priority: Highest
People: VP, Valentin Pal
Work Stream: Team 1
Details: Window churn: +6 / -1 (net +5) across 1 commit(s)
MRs: !2887 — Valentin Pal (1 commits) [+6 / -1 (net +5)]
ADS-8757
Story · In Progress · Medium · George Murgoci, Edgar Alexa
Item: ADS-8757
Title: [Billing] - Migrat tot codul pe Nest
People: George Murgoci, Edgar Alexa
Type: Story
Status: In Progress
Priority: Medium
People: George Murgoci, Edgar Alexa
Work Stream: Team 2
Details: Window churn: +3034 / -2817 (net +217) across 84 commit(s)
MRs: !306 — George Murgoci (10 commits) [+634 / -406 (net +228)], !460 — George Murgoci (68 commits) [+2080 / -2177 (net -97)], !289 — George Murgoci (4 commits) [+149 / -47 (net +102)], !2223 — George Murgoci (2 commits) [+171 / -187 (net -16)]
ADS-8760
Task · Ready for testing · Medium · Ioana Ivan
Item: ADS-8760
Title: [FE]: Schimbari pe Suprascrieri si transferuri
People: Ioana Ivan
Type: Task
Status: Ready for testing
Priority: Medium
People: Ioana Ivan
Work Stream: Team 1
Details: Window churn: +147 / -55 (net +92) across 5 commit(s)
MRs: !2251 — Ioana Ivan (3 commits) [+70 / -16 (net +54)], !188 — Ioana Ivan (1 commits) [+25 / -19 (net +6)], !2888 — Ioana Ivan (1 commits) [+52 / -20 (net +32)]
ADS-8763
Task · In Progress · Medium · Andrei Alexandru
Item: ADS-8763
Title: [Asachi][BE] Import studenti pentru anul universitar 2026-2027
People: Andrei Alexandru
Type: Task
Status: In Progress
Priority: Medium
People: Andrei Alexandru
Work Stream: University
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-8769
Improvement · Done · Medium · Edgar Alexa, George Murgoci
Item: ADS-8769
Title: [Abonamente][Admin][Statistici] - Updates
People: Edgar Alexa, George Murgoci
Type: Improvement
Status: Done
Priority: Medium
People: Edgar Alexa, George Murgoci
Work Stream: Team 2
Details: Window churn: +156 / -108 (net +48) across 2 commit(s)
MRs: !2256 — George Murgoci (1 commits) [+38 / -31 (net +7)], !307 — George Murgoci (1 commits) [+118 / -77 (net +41)]
ADS-8787
Story · Done · Medium · George Murgoci
Item: ADS-8787
Title: Redis Updates/santinele on nest projects
People: George Murgoci
Type: Story
Status: Done
Priority: Medium
People: George Murgoci
Work Stream: Team 2
Details: Window churn: +427 / -40 (net +387) across 1 commit(s)
MRs: !308 — Valentin Pal (1 commits) [+427 / -40 (net +387)]
ADS-8812
Story · Done · Medium · Ionut Ciolan, Stefan Achim
Item: ADS-8812
Title: Download RM
People: Ionut Ciolan, Stefan Achim
Type: Story
Status: Done
Priority: Medium
People: Ionut Ciolan, Stefan Achim
Work Stream: University
Details: Window churn: +15 / -24 (net -9) across 1 commit(s)
MRs: !2875 — Ionut Ciolan (1 commits) [+15 / -24 (net -9)]
ADS-8818
Bug · Ready for testing · High
Item: ADS-8818
Title: [Asachi] - Lipsa alocare studenti in sesiunea 2
Type: Bug
Status: Ready for testing
Priority: High
Work Stream: University
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-8944
Story · In Progress · Highest · Stefan Achim
Item: ADS-8944
Title: Inchidere a tuturor cataloagelor
People: Stefan Achim
Type: Story
Status: In Progress
Priority: Highest
People: Stefan Achim
Work Stream: University
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-8997
Story · Ready for testing · Medium · Stefan Agrigo
Item: ADS-8997
Title: [Mobile] - New User Experience Polish
People: Stefan Agrigo
Type: Story
Status: Ready for testing
Priority: Medium
People: Stefan Agrigo
Work Stream: Mobile
Details: Window churn: +386 / -70 (net +316) across 6 commit(s)
Direct commits: bf91091b — Stefan Agrigo [+246 / -3 (net +243)], 282a207b — Stefan Agrigo [+3 / -4 (net -1)], b92af5b5 — Stefan Agrigo [+53 / -46 (net +7)], b495c5ed — Stefan Agrigo [+13 / -13 (net +0)], 067c6154 — Stefan Agrigo [+2 / -2 (net +0)], 3d56b5a6 — Stefan Agrigo [+69 / -2 (net +67)]
Notes: Jira-only WIP without an open MR captured in GitLab for the window.; GitLab commit-only evidence was attached from a configured repo fallback because no recoverable MR path was found.
ADS-9000
Bug · To Do · Highest · VP, Valentin Pal
Item: ADS-9000
Title: [FE] incadrarea elevilor pe medii-elev fara nota inclus in intervalul 1-1,99
People: VP, Valentin Pal
Type: Bug
Status: To Do
Priority: Highest
People: VP, Valentin Pal
Work Stream: Team 1
Details: Window churn: +1 / -1 (net +0) across 1 commit(s)
MRs: !2884 — Valentin Pal (1 commits) [+1 / -1 (net +0)]
ADS-9047
Task · Code Review · Medium · Razvan Antoci
Item: ADS-9047
Title: Adaugare coordonator clasa in lista de destinatari propusi
People: Razvan Antoci
Type: Task
Status: Code Review
Priority: Medium
People: Razvan Antoci
Work Stream: Team 1
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9080
Story · Testing · Medium · Stefan Agrigo
Item: ADS-9080
Title: Create unit testing for Reports, Subjects, Activites, Newsfeed
People: Stefan Agrigo
Type: Story
Status: Testing
Priority: Medium
People: Stefan Agrigo
Work Stream: Mobile
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9102
Task · Ready for testing · High · Ioana Ivan, Marian Andrei
Item: ADS-9102
Title: [BE] Change response status code
People: Ioana Ivan, Marian Andrei
Type: Task
Status: Ready for testing
Priority: High
People: Ioana Ivan, Marian Andrei
Work Stream: Team 1
Details: Window churn: +8 / -4 (net +4) across 1 commit(s)
MRs: !2222 — Ioana Ivan (1 commits) [+8 / -4 (net +4)]
ADS-9103
Bug · Ready for testing · Medium · Rojan Shrestha
Item: ADS-9103
Title: [Prod][TUIASI][Control plane] etcd write latency makes scheduler and controller-manager lose leader election several times a day
People: Rojan Shrestha
Type: Bug
Status: Ready for testing
Priority: Medium
People: Rojan Shrestha
Work Stream: Not recorded
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9106
Story · In Progress · Medium · Dragoș Ivan
Item: ADS-9106
Title: [Notifications] - Refactor notificări proiecte Node
People: Dragoș Ivan
Type: Story
Status: In Progress
Priority: Medium
People: Dragoș Ivan
Work Stream: Team 2
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9136
Subtask · In Progress · Medium · Daniel Nechita
Item: ADS-9136
Title: Design si flux sesiuni de examinare
People: Daniel Nechita
Type: Subtask
Status: In Progress
Priority: Medium
People: Daniel Nechita
Work Stream: University
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9137
Bug · To Do · Highest · VP, Valentin Pal
Item: ADS-9137
Title: [FE] eroare 403 la descarcare raport statistici din perspectiva de diriginte- managementul clasei
People: VP, Valentin Pal
Type: Bug
Status: To Do
Priority: Highest
People: VP, Valentin Pal
Work Stream: Team 1
Details: Window churn: +2 / -2 (net +0) across 1 commit(s)
MRs: !2885 — Valentin Pal (1 commits) [+2 / -2 (net +0)]
ADS-9162
Bug · To Do · Urgent · Daniel Onisoru
Item: ADS-9162
Title: [Prod][AWS][Auth] Google SSO returns 500 when provider error is an object
People: Daniel Onisoru
Type: Bug
Status: To Do
Priority: Urgent
People: Daniel Onisoru
Work Stream: Team 1
Details: Window churn: +6 / -1 (net +5) across 2 commit(s)
MRs: !2886 — Valentin Pal (2 commits) [+6 / -1 (net +5)]
ADS-9171
Bug · Ready for testing · Medium · Rojan Shrestha
Item: ADS-9171
Title: [Prod][Alerting] KubeletServerCertificateExpiration warns inside the kubelet's normal rotation window
People: Rojan Shrestha
Type: Bug
Status: Ready for testing
Priority: Medium
People: Rojan Shrestha
Work Stream: Not recorded
Details: Window churn: +25 / -0 (net +25) across 1 commit(s)
MRs: !468 — Rojan Shrestha (1 commits) [+25 / -0 (net +25)]
ADS-9210
Task · In Progress · Medium · Alexandru Murarescu
Item: ADS-9210
Title: Migrare Timezone GMT+3 -> UTC
People: Alexandru Murarescu
Type: Task
Status: In Progress
Priority: Medium
People: Alexandru Murarescu
Work Stream: Team 2
Details: Window churn: +1365 / -621 (net +744) across 11 commit(s)
MRs: !2895 — Alex Murarescu (6 commits) [+950 / -368 (net +582)], !2254 — Alex Murarescu (5 commits) [+415 / -253 (net +162)]
ADS-9232
Bug · In Progress · High · Rojan Shrestha
Item: ADS-9232
Title: [Prod][Ingress] HTTP flood on www.adservio.ro/ro OOM-kills both core-public-ingress pods
People: Rojan Shrestha
Type: Bug
Status: In Progress
Priority: High
People: Rojan Shrestha
Work Stream: Not recorded
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.; Slack infra activity observed in #devops: <@U633D9JBW> <@U89QYBH28> It happened again on Oct 22: 2.33M /ro/auth requests in 15 minutes OOM-killed both ingress...
ADS-9259
Task · In Progress · Medium · Stefan Achim
Item: ADS-9259
Title: Download RM cu Observatii si Semnatari
People: Stefan Achim
Type: Task
Status: In Progress
Priority: Medium
People: Stefan Achim
Work Stream: University
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9265
Task · In Progress · Medium · Marian Andrei
Item: ADS-9265
Title: Product Analytics v2 (team1)
People: Marian Andrei
Type: Task
Status: In Progress
Priority: Medium
People: Marian Andrei
Work Stream: Team 1
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9298
Story · In Progress · Medium · Alexandru Murarescu
Item: ADS-9298
Title: Remove FLAG_WELLBEING_AI_SUMMARY
People: Alexandru Murarescu
Type: Story
Status: In Progress
Priority: Medium
People: Alexandru Murarescu
Work Stream: Team 2
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9302
Story · In Progress · Medium · Catalin Cojan, Stefan Agrigo
Item: ADS-9302
Title: Widget - Rapoarte Academice
People: Catalin Cojan, Stefan Agrigo
Type: Story
Status: In Progress
Priority: Medium
People: Catalin Cojan, Stefan Agrigo
Work Stream: Mobile
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9305
Subtask · In Progress · Medium · Stefan Achim
Item: ADS-9305
Title: [Spike] Selectie All tabel Frontend
People: Stefan Achim
Type: Subtask
Status: In Progress
Priority: Medium
People: Stefan Achim
Work Stream: University
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9307
Task · Done · Urgent · Marian Andrei
Item: ADS-9307
Title: [BE] stergere module
People: Marian Andrei
Type: Task
Status: Done
Priority: Urgent
People: Marian Andrei
Work Stream: Team 1
Details: Window churn: +426 / -0 (net +426) across 1 commit(s)
MRs: !2891 — Marian Andrei (1 commits) [+426 / -0 (net +426)]
ADS-9324
Task · Ready for testing · Medium · Stefan Agrigo
Item: ADS-9324
Title: Student/parents subject/evolution improvements
People: Stefan Agrigo
Type: Task
Status: Ready for testing
Priority: Medium
People: Stefan Agrigo
Work Stream: Mobile
Details: Window churn: +833 / -242 (net +591) across 3 commit(s)
Direct commits: 7c480943 — Stefan Agrigo [+594 / -121 (net +473)], 704efa83 — Stefan Agrigo [+202 / -107 (net +95)], c77f713b — Stefan Agrigo [+37 / -14 (net +23)]
Notes: Jira-only WIP without an open MR captured in GitLab for the window.; GitLab commit-only evidence was attached from a configured repo fallback because no recoverable MR path was found.
ADS-9327
Bug · To Do · Highest · Dragoș Ivan
Item: ADS-9327
Title: [FE] La incercarea de autentificare in cont de pe mobile, ecranul ramane alb
People: Dragoș Ivan
Type: Bug
Status: To Do
Priority: Highest
People: Dragoș Ivan
Work Stream: Mobile
Details: Window churn: +25 / -3 (net +22) across 1 commit(s)
MRs: !2248 — Valentin Pal (1 commits) [+25 / -3 (net +22)]
ADS-9330
Bug · Done · Highest · Dragoș Ivan
Item: ADS-9330
Title: [Security][Node.js] Apply October 2026 security updates and verify deployed runtimes
People: Dragoș Ivan
Type: Bug
Status: Done
Priority: Highest
People: Dragoș Ivan
Work Stream: Team 2
Details: Window churn: +5 / -0 (net +5) across 1 commit(s)
MRs: !467 — Valentin Pal (1 commits) [+5 / -0 (net +5)]
ADS-9332
Improvement · In Progress · High · Pavel Petronel
Item: ADS-9332
Title: Adaugare nr absente in statistica CES
People: Pavel Petronel
Type: Improvement
Status: In Progress
Priority: High
People: Pavel Petronel
Work Stream: Team 1
Details: Window churn: +104 / -5 (net +99) across 2 commit(s)
MRs: !2900 — Petronel Pavel (1 commits) [+44 / -3 (net +41)], !2262 — Petronel Pavel (1 commits) [+60 / -2 (net +58)]
ADS-9339
Bug · In Progress · Medium · Ioana Ivan
Item: ADS-9339
Title: [FE][Evolutie]- Elev clase active multiple
People: Ioana Ivan
Type: Bug
Status: In Progress
Priority: Medium
People: Ioana Ivan
Work Stream: Team 1
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9340
Task · In Progress · Medium · 2026-10-29 11:09 · Ioana Ivan, Stefan Agrigo
Item: ADS-9340
Title: [FE][Mob] - Date elevi inactivi
People: Ioana Ivan, Stefan Agrigo
Time: 2026-10-29 11:09
Type: Task
Status: In Progress
Priority: Medium
People: Ioana Ivan, Stefan Agrigo
Work Stream: Mobile
Details: Window churn: +16 / -7 (net +9) across 2 commit(s)
MRs: !2253 — Ioana Ivan (1 commits) [+15 / -6 (net +9)], !2894 — Ioana Ivan (1 commits) [+1 / -1 (net +0)]
Notes: GitLab MR merged in the report window, but Jira is still `In Progress`, so this item remains in Work in Progress.
ADS-9341
Bug · In Progress · Medium · Rojan Shrestha
Item: ADS-9341
Title: [Prod][RDS] mysql-master freeable memory has fallen about 0.55 GiB a week since the 1 Oct restart and now flaps the memory-low alarm
People: Rojan Shrestha
Type: Bug
Status: In Progress
Priority: Medium
People: Rojan Shrestha
Work Stream: Not recorded
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9345
Story · In Progress · Medium · Andrei Dragan, Ioana Ivan
Item: ADS-9345
Title: Delete clSpecID completely and drop from DB
People: Andrei Dragan, Ioana Ivan
Type: Story
Status: In Progress
Priority: Medium
People: Andrei Dragan, Ioana Ivan
Work Stream: Team 1
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9351
Subtask · In Progress · Medium · Catalin Cojan
Item: ADS-9351
Title: [BE] - Rapoarte academice
People: Catalin Cojan
Type: Subtask
Status: In Progress
Priority: Medium
People: Catalin Cojan
Work Stream: Team 2
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9355
Story · In Progress · High · Marian Andrei
Item: ADS-9355
Title: [AI] Agent Vio de code review pe MR-uri GitLab (orice proiect)
People: Marian Andrei
Type: Story
Status: In Progress
Priority: High
People: Marian Andrei
Work Stream: Team 1
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9360
Task · Merged · High · Rojan Shrestha
Item: ADS-9360
Title: [Prod][Staging][Apps][EKS] Roll Bottlerocket nodes to 1.68.0 for CVE-2026-111943 (eMudhra CA key recovery)
People: Rojan Shrestha
Type: Task
Status: Merged
Priority: High
People: Rojan Shrestha
Work Stream: Not recorded
Details: Window churn: +10 / -0 (net +10) across 1 commit(s)
MRs: !103 — Rojan Shrestha (1 commits) [+10 / -0 (net +10)]
Notes: Slack infra activity observed in #devops: AWS CVE-2026-111943 (leaked eMudhra/emSign CA keys) affects our EKS nodes: all 11 prod nodes run Bottlerocket 1.64.0,...
ADS-9361
Task · In Progress · High · Rojan Shrestha
Item: ADS-9361
Title: [Security][Prod] Upgrade RabbitMQ 3.12.10 (end-of-life) to a supported version for the AMQP 0-9-1 memory DoS
People: Rojan Shrestha
Type: Task
Status: In Progress
Priority: High
People: Rojan Shrestha
Work Stream: Not recorded
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.; Slack infra activity observed in #infra: Flagging that our RabbitMQ needs an upgrade, a High advisory (memory DoS via incomplete AMQP messages) is patched in...
ADS-9367
Subtask · In Progress · Medium · Dragoș Ivan
Item: ADS-9367
Title: [Subscriptions] - Worker notificări
People: Dragoș Ivan
Type: Subtask
Status: In Progress
Priority: Medium
People: Dragoș Ivan
Work Stream: Team 2
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9372
Task · Ready for testing · Medium · Stefan Agrigo
Item: ADS-9372
Title: Fix add grade issue on last day of module
People: Stefan Agrigo
Type: Task
Status: Ready for testing
Priority: Medium
People: Stefan Agrigo
Work Stream: Mobile
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9380
Bug · In Progress · High · Rojan Shrestha
Item: ADS-9380
Title: [Prod][RDS] Tenant migrations permanently consume catalog DB memory: mysql-catalog2 lost 5 GiB on 23 Oct and 1.5 GiB more on 26 Oct
People: Rojan Shrestha
Type: Bug
Status: In Progress
Priority: High
People: Rojan Shrestha
Work Stream: Not recorded
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9384
Story · Ready for testing · Medium · Iuliana Gugeanu
Item: ADS-9384
Title: Adauga view IBAN pt studenti in modulul de burse
People: Iuliana Gugeanu
Type: Story
Status: Ready for testing
Priority: Medium
People: Iuliana Gugeanu
Work Stream: University
Details: Window churn: +45 / -0 (net +45) across 1 commit(s)
MRs: !2261 — Iuliana Gugeanu (1 commits) [+45 / -0 (net +45)]
ADS-9386
Subtask · In Progress · Medium · Daniel Nechita
Item: ADS-9386
Title: Design Modul Check-in
People: Daniel Nechita
Type: Subtask
Status: In Progress
Priority: Medium
People: Daniel Nechita
Work Stream: University
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.
ADS-9392
Bug · In Progress · Medium · Rojan Shrestha
Item: ADS-9392
Title: [Prod][Notifications] notifications-event-manager crashes overnight on "MySQL server has gone away": tenant DB connection is reused past wait_timeout
People: Rojan Shrestha
Type: Bug
Status: In Progress
Priority: Medium
People: Rojan Shrestha
Work Stream: Not recorded
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.; Slack infra activity observed in #infra: <@U8983QPL1> notifications-event-manager (prod) crashed 6 times last night (23:16-04:08 UTC) on `MySQL server has gon...
ADS-9398
Bug · To Do · High · Valentin Pal, Valy Pal
Item: ADS-9398
Title: [FE] Daycare Actions menu disappears when table columns refresh
People: Valentin Pal, Valy Pal
Type: Bug
Status: To Do
Priority: High
People: Valentin Pal, Valy Pal
Work Stream: Not recorded
Details: Window churn: +153 / -41 (net +112) across 2 commit(s)
MRs: !2255 — Valentin Pal (2 commits) [+153 / -41 (net +112)]
ADS-9415
Task · In Progress · Medium · Marian Andrei
Item: ADS-9415
Title: [BE] Import SIIIR - specializare
People: Marian Andrei
Type: Task
Status: In Progress
Priority: Medium
People: Marian Andrei
Work Stream: Team 1
Details: Notes: Jira-only WIP without an open MR captured in GitLab for the window.

Recovered commit activity, including closed experiments. These entries do not add delivered items, active WIP, capacity or effort/load points.

Code activity

Code activity snapshot

Total1
+Lines19
-Lines7
Net12
Commits1
Linked MR evidence0
KeyTitleTypeStatusPriorityFocusPeopleWork StreamEvidence
No Jira ticketfix[smoke-tests]: align scholarship reports smoke test with the new pageCode activityCode activity; outcome tracked separatelyAndrei AlexandruNot recorded
No Jira ticketCommits: f524b8bd+19 / -7 (net +12) across 1 commit(s)
fix[smoke-tests]: align scholarship reports smoke test with the new page
No Jira ticket · Code activity · Code activity; outcome tracked separately · 2026-10-30 16:44 · Andrei Alexandru
People: Andrei Alexandru
Ticket state: No Jira ticket
Time: 2026-10-30 16:44
Type: Code activity
Status: Code activity; outcome tracked separately
People: Andrei Alexandru
Work Stream: Not recorded
Details: Jira ticket: No Jira ticket shown as GitLab-only work
Window churn: +19 / -7 (net +12) across 1 commit(s)
Direct commits: f524b8bd — Andrei Alexandru [+19 / -7 (net +12)]
Notes: Verified commit inside the canonical week; direct code activity only, with no delivered-work or active-WIP count.

Report Per Person

Alexandru Murarescu

Mid Full Stack Developer (React, Node)
Code churn
+1465-661Net+804Commits14MR evidence4
Tasks, Stories, Improvements
Work in Progress
Alexandru Murarescu
Mid Full Stack Developer (React, Node) · +1465 / -661 (net +804), 14 commit(s)
Role: Mid Full Stack Developer (React, Node)
Code churn
+1465-661Net+804Commits14MR evidence4
Tasks, Stories, Improvements
Work in Progress

Andrei Alexandru

Senior Backend Java
Code churn
+1852-358Net+1494Commits10MR evidence4
Bugs
Tasks, Stories, Improvements
Work in Progress
Recovered code activity
Andrei Alexandru
Senior Backend Java · +1852 / -358 (net +1494), 10 commit(s)
Role: Senior Backend Java
Code churn
+1852-358Net+1494Commits10MR evidence4
Bugs
Tasks, Stories, Improvements
Work in Progress
Recovered code activity
Catalin Cojan
Senior Backend PHP · +4781 / -1222 (net +3559), 20 commit(s)

Dana-Mihaela Marițca

Junior Front End Developer
Code churn
+1545-721Net+824Commits6MR evidence4
Tasks, Stories, Improvements
Work in Progress
Dana-Mihaela Marițca
Junior Front End Developer · +1545 / -721 (net +824), 6 commit(s)
Role: Junior Front End Developer
Code churn
+1545-721Net+824Commits6MR evidence4
Tasks, Stories, Improvements
Work in Progress

Daniel Onisoru

Architect
Code churn
+1112-417Net+695Commits9MR evidence6
Bugs
Tasks, Stories, Improvements
Work in Progress
Non-ticketed GitLab Work
Deployments
Daniel Onisoru
Architect · +1112 / -417 (net +695), 9 commit(s)
Role: Architect
Code churn
+1112-417Net+695Commits9MR evidence6
Bugs
Tasks, Stories, Improvements
Work in Progress
Non-ticketed GitLab Work
Deployments

Dragoș Ivan

Senior Front End Developer (React)
Code churn
+475-404Net+71Commits49MR evidence28
Raw GitLab audit
+490-419Net+71Commits53MR evidence28
Bugs
Tasks, Stories, Improvements
Work in Progress
Non-ticketed GitLab Work
Deployments
Dragoș Ivan
Senior Front End Developer (React) · +475 / -404 (net +71), 49 commit(s)
Role: Senior Front End Developer (React)
Code churn
+475-404Net+71Commits49MR evidence28
Raw GitLab audit
+490-419Net+71Commits53MR evidence28
Bugs
Tasks, Stories, Improvements
Work in Progress
Non-ticketed GitLab Work
Deployments

Edgar Alexa

Mid Full Stack Developer (React, Node)
Code churn
+1547-1273Net+274Commits146MR evidence6
Raw GitLab audit
+1547-1273Net+274Commits146MR evidence5
Tasks, Stories, Improvements
Work in Progress
Edgar Alexa
Mid Full Stack Developer (React, Node) · +1547 / -1273 (net +274), 146 commit(s)
Role: Mid Full Stack Developer (React, Node)
Code churn
+1547-1273Net+274Commits146MR evidence6
Raw GitLab audit
+1547-1273Net+274Commits146MR evidence5
Tasks, Stories, Improvements
Work in Progress

George Murgoci

Mid Full Stack Developer (React, Node)
Code churn
+3031-2814Net+217Commits99MR evidence10
Raw GitLab audit
+3733-3383Net+350Commits102MR evidence10
Bugs
Work in Progress
Non-ticketed GitLab Work
George Murgoci
Mid Full Stack Developer (React, Node) · +3031 / -2814 (net +217), 99 commit(s)
Role: Mid Full Stack Developer (React, Node)
Code churn
+3031-2814Net+217Commits99MR evidence10
Raw GitLab audit
+3733-3383Net+350Commits102MR evidence10
Bugs
Work in Progress
Non-ticketed GitLab Work

Ioana Ivan

Mid Front End Developer (React)
Code churn
+489-402Net+87Commits19MR evidence14
Bugs
Tasks, Stories, Improvements
Work in Progress
Deployments
Ioana Ivan
Mid Front End Developer (React) · +489 / -402 (net +87), 19 commit(s)
Role: Mid Front End Developer (React)
Code churn
+489-402Net+87Commits19MR evidence14
Bugs
Tasks, Stories, Improvements
Work in Progress
Deployments

Ionut Ciolan

Senior Backend PHP
Code churn
+2501-520Net+1981Commits8MR evidence5
Bugs
Tasks, Stories, Improvements
Work in Progress
Ionut Ciolan
Senior Backend PHP · +2501 / -520 (net +1981), 8 commit(s)
Role: Senior Backend PHP
Code churn
+2501-520Net+1981Commits8MR evidence5
Bugs
Tasks, Stories, Improvements
Work in Progress
Iuliana Gugeanu
Junior Front End Developer · +77 / -14 (net +63), 2 commit(s)
Role: Junior Front End Developer
Code churn
+77-14Net+63Commits2MR evidence2
Work in Progress

Marian Andrei

Senior Backend Developer
Code churn
+762-17Net+745Commits5MR evidence4
Tasks, Stories, Improvements
Work in Progress
Marian Andrei
Senior Backend Developer · +762 / -17 (net +745), 5 commit(s)
Role: Senior Backend Developer
Code churn
+762-17Net+745Commits5MR evidence4
Tasks, Stories, Improvements
Work in Progress
Raul Popovici
Former DevOps/SRE Engineer
Role: Former DevOps/SRE Engineer
Tasks, Stories, Improvements

Rojan Shrestha

DevOps/SRE Engineer
Code churn
+161-31Net+130Commits11MR evidence10
Raw GitLab audit
+167-31Net+136Commits12MR evidence10
Bugs
Tasks, Stories, Improvements
Work in Progress
Rojan Shrestha
DevOps/SRE Engineer · +161 / -31 (net +130), 11 commit(s)
Role: DevOps/SRE Engineer
Code churn
+161-31Net+130Commits11MR evidence10
Raw GitLab audit
+167-31Net+136Commits12MR evidence10
Bugs
Tasks, Stories, Improvements
Work in Progress
Stefan Achim
Mid-Sen Frontend Developer (React) · +354 / -239 (net +115), 7 commit(s)

Stefan Agrigo

Junior Mobile Developer
Code churn
+1223-316Net+907Commits11MR evidence0
Direct GitLab repo activity
+4-4Net+0Commits2MR evidence0
Tasks, Stories, Improvements
Work in Progress
Direct GitLab Repo Activity
  • adservio/flutter/app — +4 / -4 (net +0) across 2 commit(s)
    Recent commits: fix order for discipline elements, fix survey permission
    • cc84815d — Stefan Agrigo [+3 / -3 (net +0)] fix order for discipline elements
    • 3b1b642a — Stefan Agrigo [+1 / -1 (net +0)] fix survey permission
Stefan Agrigo
Junior Mobile Developer · +1223 / -316 (net +907), 11 commit(s) · direct repo: 2 commit(s)
Role: Junior Mobile Developer
Code churn
+1223-316Net+907Commits11MR evidence0
Direct repo activity
+4-4Net+0Commits2MR evidence0
Tasks, Stories, Improvements
Work in Progress
Direct GitLab Repo Activity
  • adservio/flutter/app — +4 / -4 (net +0) across 2 commit(s)
    Recent commits: fix order for discipline elements, fix survey permission
    • cc84815d — Stefan Agrigo [+3 / -3 (net +0)] fix order for discipline elements
    • 3b1b642a — Stefan Agrigo [+1 / -1 (net +0)] fix survey permission

Stefan Musat

Senior Mobile Developer
Code churn
+4298-752Net+3546Commits9MR evidence0
Direct GitLab repo activity
+4298-752Net+3546Commits9MR evidence0
Tasks, Stories, Improvements
Work in Progress
Direct GitLab Repo Activity
  • adservio/flutter/app — +4298 / -752 (net +3546) across 9 commit(s)
    Recent commits: fixes for roles, Merge branch 'ADS-9148-count-mesaje' into ADS-9130-Roluri-titulatura, added top students with isTeacher=true
    • 5095d082 — Stefan Musat [+435 / -67 (net +368)] fixes for roles
    • b2a3a733 — Stefan Musat [+46 / -0 (net +46)] Merge branch 'ADS-9148-count-mesaje' into ADS-9130-Roluri-titulatura
    • adae7fdb — Stefan Musat [+52 / -7 (net +45)] added top students with isTeacher=true
    • 6804f1c3 — Stefan Musat [+2361 / -392 (net +1969)] implemented web notficiations
    • 083c925e — Stefan Musat [+302 / -44 (net +258)] fixed titulatura
    • 43ab1be4 — Stefan Musat [+218 / -77 (net +141)] fixed roles issues
    • 633c280c — Stefan Musat [+3 / -2 (net +1)] switched to prod
    • f5cfd08b — Stefan Musat [+177 / -11 (net +166)] updated notifications click listeners
    • ccf36249 — Stefan Musat [+704 / -152 (net +552)] fixed notifications
Stefan Musat
Senior Mobile Developer · +4298 / -752 (net +3546), 9 commit(s) · direct repo: 9 commit(s)
Role: Senior Mobile Developer
Code churn
+4298-752Net+3546Commits9MR evidence0
Direct repo activity
+4298-752Net+3546Commits9MR evidence0
Tasks, Stories, Improvements
Work in Progress
Direct GitLab Repo Activity
  • adservio/flutter/app — +4298 / -752 (net +3546) across 9 commit(s)
    Recent commits: fixes for roles, Merge branch 'ADS-9148-count-mesaje' into ADS-9130-Roluri-titulatura, added top students with isTeacher=true
    • 5095d082 — Stefan Musat [+435 / -67 (net +368)] fixes for roles
    • b2a3a733 — Stefan Musat [+46 / -0 (net +46)] Merge branch 'ADS-9148-count-mesaje' into ADS-9130-Roluri-titulatura
    • adae7fdb — Stefan Musat [+52 / -7 (net +45)] added top students with isTeacher=true
    • 6804f1c3 — Stefan Musat [+2361 / -392 (net +1969)] implemented web notficiations
    • 083c925e — Stefan Musat [+302 / -44 (net +258)] fixed titulatura
    • 43ab1be4 — Stefan Musat [+218 / -77 (net +141)] fixed roles issues
    • 633c280c — Stefan Musat [+3 / -2 (net +1)] switched to prod
    • f5cfd08b — Stefan Musat [+177 / -11 (net +166)] updated notifications click listeners
    • ccf36249 — Stefan Musat [+704 / -152 (net +552)] fixed notifications
Virlan Francisc-Gabriel
Junior Backend Java Developer
Role: Junior Backend Java Developer
Work in Progress

Codex

AI contributor
Code churn
+16758-1243Net+15515Commits22MR evidence16
Raw GitLab audit
+17483-1591Net+15892Commits22MR evidence16
Bugs
Tasks, Stories, Improvements
Work in Progress
Codex
AI contributor · +16758 / -1243 (net +15515), 22 commit(s)
Role: AI contributor
Code churn
+16758-1243Net+15515Commits22MR evidence16
Raw GitLab audit
+17483-1591Net+15892Commits22MR evidence16
Bugs
Tasks, Stories, Improvements
Work in Progress

Productivity Assessment

Total completed116
Bugs45
Delivery63
Other work (GitLab only)8
Ops signals4
WIP62
Incidents1
Done work commits301
MRs merged this week84
Historical merged MR evidence105
MR evidence open at cutoff46
Linked MR evidence235
Done work linked MR evidence187
WIP commits195
WIP linked MR evidence48
Code churn
+49426-13794Net+35632Commits497MR evidence235
Raw code churn
+50874-14726Net+36148Commits505MR evidence235
Filter fallback commits0
Reliability warnings0

Bug Priority Counts

Urgent6Highest9High15Medium13Unspecified2focus0

GitLab churn split

This total is not “new code shipped.” It is filtered in-window GitLab churn across completed work, WIP, non-ticketed GitLab work, and separately tracked direct repo activity, after excluding non-delivery config/tooling noise, multi-parent merge commits, squash commits, and deduplicating direct repo fallback commits that were already counted elsewhere in the report.

Bugs: +1312 / -520 (net +792)Delivery: +8312 / -3578 (net +4734)Other Work: +1295 / -542 (net +753)WIP: +34543 / -8659 (net +25884)Direct Repo Activity: +4302 / -756 (net +3546)

Direct repo activity is GitLab work captured from configured fallback repositories when it could not be mapped safely back to Jira items, so it is tracked separately instead of being folded into Bugs, Delivery, Other Work, or WIP.

View code churn method and audit

Churn is calculated from filtered GitLab commit stats for commits inside the report window, across merged MRs, prior-merge carryovers, and open-MR WIP.

We use in-window commit activity instead of full MR size so older merges or long-running branches do not overstate weekly work. Multi-parent merge commits and squash commits are excluded, and direct repo fallback commits are deduplicated when the same commit was already counted through MR-backed or ticket-mapped evidence. Jira-only items without GitLab evidence stay at 0 churn.

Filtered churn excludes obvious non-delivery file noise such as CI/workflow files, formatter/lint/editor configs, TypeScript/build/CLI configs, env templates, hooks, lockfiles, and generated migration snapshot files. Runtime-impacting files like Dockerfile, mikro-orm.config.ts, real migrations, and app code remain counted.

Churn audit and caveats

Raw GitLab Churn Audit: +50874 / -14726 (net +36148) across 505 commit(s) across 235 distinct MR(s).

References: GitLab merge request commits API and GitLab commit stats API.

Churn Outliers

Codex

+16758 / -1243 (net +15515) across 22 commit(s) in 16 MR(s).

Large churn is usually concentrated in one or two workstreams and can reflect rewrites, large UI changes, generated assets, or restructuring, not just net-new code.

Per-person Output

PersonRoleCompletedBugsDeliveryOtherOpsWIPCode churnNotes
Alexandru MurarescuMid Full Stack Developer (React, Node)303003
+1465-661Net+804Commits14MR evidence4
Andrei AlexandruSenior Backend Java1688003
+1852-358Net+1494Commits10MR evidence4
Andrei DraganSenior Backend PHP523002
+3125-810Net+2315Commits22MR evidence1
Catalin CojanSenior Backend PHP615003
+4781-1222Net+3559Commits20MR evidence6
Cosmin OlaruSenior Manual QA606002
+0-0Net+0Commits0MR evidence0
Dana-Mihaela MarițcaJunior Front End Developer202002
+1545-721Net+824Commits6MR evidence4
Daniel OnisoruArchitect17110601
+1112-417Net+695Commits9MR evidence6
Dragoș IvanSenior Front End Developer (React)513104
+475-404Net+71Commits49MR evidence28
Dron GabrielFormer Front End Developer (React)211000
+0-0Net+0Commits0MR evidence0
Edgar AlexaMid Full Stack Developer (React, Node)101003
+1547-1273Net+274Commits146MR evidence6
George MurgociMid Full Stack Developer (React, Node)640205
+3031-2814Net+217Commits99MR evidence10
Ioana IvanMid Front End Developer (React)945006
+489-402Net+87Commits19MR evidence14
Ionut CiolanSenior Backend PHP1183004
+2501-520Net+1981Commits8MR evidence5
Iuliana GugeanuJunior Front End Developer000003
+77-14Net+63Commits2MR evidence2
Marian AndreiSenior Backend Developer202006
+762-17Net+745Commits5MR evidence4
Pavel PetronelFront End Developer (React)945004
+3887-1621Net+2266Commits30MR evidence7
Raul PopoviciFormer DevOps/SRE Engineer101000
+0-0Net+0Commits0MR evidence0
Razvan AntociJunior-Mid Manual QA413001
+0-0Net+0Commits0MR evidence0
Rojan ShresthaDevOps/SRE Engineer291514009
+161-31Net+130Commits11MR evidence10
Stefan AchimMid-Sen Frontend Developer (React)615005
+354-239Net+115Commits7MR evidence5
Stefan AgrigoJunior Mobile Developer404006
+1223-316Net+907Commits11MR evidence0
Unmapped repo activity: +4 / -4 (net +0) across 2 commit(s)
Stefan MusatSenior Mobile Developer606003
+4298-752Net+3546Commits9MR evidence0
Unmapped repo activity: +4298 / -752 (net +3546) across 9 commit(s)
Virlan Francisc-GabrielJunior Backend Java Developer000001
+0-0Net+0Commits0MR evidence0
CodexAI contributor3210011
+16758-1243Net+15515Commits22MR evidence16
Codex combines explicitly marked Codex work with VP and Valentin Pal, as requested. Shared commits and work items count once within this category. Original authors remain in the source evidence. This grouping does not assert that every change from those accounts was AI-authored. Bugs merely reported by Codex are not code contributions. No fixed human capacity is assigned to Codex.

Standouts

  • Rojan Shrestha had the highest visible workload in the window with 29 completed item(s) and 9 WIP item(s).

Concerns

  • Open GitLab activity without an ADS ticket key is retained separately as unticketed WIP.
  • 11 resolved bug(s) were included from Jira without any linked merged MR.
  • 51 completed item(s) were closed in Jira during the report window after their linked MR had already merged earlier.
  • 14 Jira-closed delivery item(s) were included without recoverable GitLab MR evidence and should be read as Jira-closed work, often no-code or operational.
  • 8 merged GitLab change(s) landed without any ADS ticket key and were included under non-Jira work.
  • 2 merged GitLab change(s) landed without any ADS ticket key but matched a bug-fix title pattern, so they were included under Bugs as GitLab-only bugfix work.
  • Operational evidence added 16 GitLab-backed deploy and 1 Slack incident item(s) from readable sources.
  • Several contributors show only WIP evidence this week, which is expected for longer-running work but should not be read as low activity.
  • Code churn is reported as filtered in-window GitLab activity after excluding non-delivery repo/config noise, multi-parent merge commits, and direct repo fallback commits already counted elsewhere: +49426 / -13794 (net 35632). Raw GitLab churn for audit was +50874 / -14726 (net 36148).

Overall Verdict

Visible delivery shows 116 completed item(s) (45 bugs, 63 delivery items, 8 non-ticketed GitLab items) and 62 in-progress item(s), with WIP intentionally preserved from open MR commit activity and Jira-only active tickets, completed scope also including Jira-closed carryovers and Jira-only closures with explicit evidence notes, and Slack correlation layered on where channel access allowed it.

Notes and Gaps

  • 2 merged GitLab MR(s) in the window had no ADS ticket key but matched a bug-fix title pattern, so they were included under Bugs as GitLab-only bugfix work.
  • 8 merged GitLab MR(s) in the window had no ADS ticket key and were included under non-ticketed GitLab work.
  • 2 open GitLab MR(s) with in-period commits had no ADS ticket key and were included as unticketed GitLab WIP.
  • GitLab deploy evidence added 16 successful production deploy item(s).
  • Slack evidence was unavailable for: #major-incident, #devleads.
  • Slack correlation added 4 Slack-only operational item(s) from readable channels.
  • 2 Slack deploy signal(s) could not be matched back to a GitLab deployment job and were ignored for deploy counting.
  • Direct GitLab repo activity from adservio/flutter/app was captured separately when it could not be mapped safely back to Jira tickets.
  • Primary code churn metrics now filter out non-delivery GitLab files such as CI/workflow, formatter/lint/editor, build/CLI config, env template, and lockfile changes while preserving raw GitLab churn as an audit trail.
  • 11 resolved bug(s) were pulled from Jira resolution data even though no linked merged MR was found.
  • 51 completed item(s) were pulled in because Jira closed them during the report window even though their linked MR had merged earlier.
  • 14 resolved story/task/improvement item(s) were included from Jira closure data without recoverable GitLab MR evidence; they are likely no-code, data, or operational work.
  • Codex combines explicitly marked Codex work with VP and Valentin Pal, as requested. Shared commits and work items count once within this category. Original authors remain in the source evidence. This grouping does not assert that every change from those accounts was AI-authored. Bugs merely reported by Codex are not code contributions. No fixed human capacity is assigned to Codex.